Problems SHORTAGE of renewable, clean electrical generating capacity

Similar presentations


Presentation on theme: "Problems SHORTAGE of renewable, clean electrical generating capacity"— Presentation transcript:

1 Problems SHORTAGE of renewable, clean electrical generating capacity NEED FOR ENERGY SECURITY and INDEPENDENCE with local, distributed power independent of grid and imported fuels GLOBAL WARMING – Majority of industrial CO2 emissions come from NOT making electricity by clean renewable sources. POLLUTION – health effects, acid rain, destruction of species HOW TO ADAPT LOW HEAD WATER to make electricity with new tech. Solution Local source of sustainable green energy, 24/7 Easy retrofit, quick to install, simple service – HYDROCOIL TURBINE existing weirs, water millraces, conduits effluent from water treatment plants, from cooling towers, industry roof-top water towers, high rise buildings

2 HydroCoil® Power provides
Electricity generated by a transformational turbine. Providing Clean, Low-Cost energy from un-tapped, renewable micro-hydroelectric resources.

3 In the Micro Hydro category
Electric potential: up to kW at a site. Low Head: water drops less than 20 meters. Flow Rate: Gallons / Minute (gpm) for HydroCoil turbine in mid-range, ~ 800 gpm (.05 cumecs)

4 How is this possible? HydroCoil® Turbine
With helical vanes & waterproof alternator; in carrying frame.

5 Points-of-Difference: Technology
Innovative – NOT adaptations of high head hydro, NOT an Archimedes screw Design captures more energy: Cylinder focuses all the water onto coiled vanes--captures more energy  electricity Operates in shallow or deep water Manufacturing: Injection molded and off-the-shelf parts Light weight polymer Constructed for easy servicing

6 Energizing these Opportunities
Tomorrow’s Technology Today The HydroCoil® Turbine

7 Competitive Advantages
Unique hydrodynamics Sequential deceleration of water Low corrosion, less maintenance, quiet Install clusters of multiple units ( ) Modularity of Design lowers installation costs per turbine Capital & Installation cost per kilowatt is low modest total investment. faster payback to purchaser. Self Starting. No diesel or gas generators: no noise, no combustible fuels to transport, store, or ignite and pollute.

8 Design Flexibility: Modular
Cluster Design depends only on Breadth and Depth of the Water. 8

9 Simplicity of Design Parts: Fewer than 30.
Footprint: Less than 2 Square feet. Weight: less than 40 pounds

10 Certified Test Results
At least 1.5 kW maximum electricity potential/turbine More energy converted from water flow than other turbines when measured on: - footprint - less than 2 Sq. Ft. ( < 0.2 m2 ) - or weight basis (40 lbs., 18 kg.) 10

11 Environmentally Friendly
Clean: Carbon neutral in-operation. Uses Existing Site - Minimal disruption. 11

12 Opportunity Defined and Ready to be Realized
HydroCoil® Power, Inc. Opportunity Defined and Ready to be Realized


Download ppt "Problems SHORTAGE of renewable, clean electrical generating capacity"

Similar presentations


Ads by Google