©2011 Ben Keet 1 Case Studies Contaminated Land Sheep-dips & Orchards Drs. Ben Keet FRSC Geo & Hydro – K8 Ltd

Slides:



Advertisements
Similar presentations
ENVIRONMENTAL SITE ASSESSMENT SCREENING. Use May only be used for projects with no ROW, deep excavation and BUSTR sites only ◦ May not use for projects.
Advertisements

SAND CLEANING STATFJORD C FIELD TEST Stavanger 18 – 19 January 2006 Henrik Dannström, MATOR AS.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Office of Science U.S. Department of Energy Streamlined.
Further Site Investigation Sutton Walls Former Landfill
SESSION: MANAGING CONTAMINATION North Carolina DOT’s Experience with UV Fluorescence for Measuring Petroleum Contamination in Soil Cyrus Parker, LG P.E.,
Environmental Geotecnics1 Environmental Geotechnics Case Study WWII Mustard Gas Factory at Ergethan in the Former East Germany.
Connecticut Department of Energy and Environmental Protection.
Dale T Littlejohn Senior Geologist. What is fate and transport in the vadose zone? Vadose Zone Hydrocarbon release from buried pipeline Aquifer Surface.
Results of sampling and chemical analyses from several hot spots in Armenia visit of the surroundings of Yerevan, July 22 – 28, 2010 Institute of Chemical.
Mapua Contaminated Site, New Zealand Kayleigh Cradock Andrew Pickup Chris Thompson.
© 2010 Ben Keet 1 Why most plastics in category 5, 6 and 7 should be landfilled and not recycled Drs. Ben Keet FRSC Geo & Hydro – K8 Ltd.
Soil Remediation for The London 2012 Olympic Games Damilola Sunmonu and Amy Wright.
REMEDIATION OF INCE CENTRAL ESTATE IN WIGAN A Part 2A Site Tony Brown, SiLC – Director of Ground Engineering John Crowther, SiLC - Technical Director 22.
Clean-up at BP Paulsboro New Jersey (USA) Roxane Fisher and Mark Ferguson.
Dounreay Nuclear and Chemical Land Contamination.
WasteMINZ 2007 Contaminated Site – Case Study Former Market Garden Land.
Basic NEScessities of Life The first 2 months of implementation February 2012 James Corbett, Auckland Council Penny Kneebone, Tonkin & Taylor Ltd.
Enviromental aspects of Brownfield Regeneration Barbara Vojvodíková, Marcela Maturová „This project has been funded with support from the European Commission.
Henderson DUSEL Physics & Geoscience Workshops Lee Petersen, CNA Consulting Engineers Greg Hulne, Miller Dunwiddie Dale Holland, Dunham Associates.
 Embankment Construction – LOTs  What is the maximum length of a LOT? Mainline pavement lanes, turn lanes, ramps, parking lots, concrete box.
©2011 Ben Keet 1 Pilot Study Bromine containing Polymers at SIMS Recycling Auckland, New Zealand A study carried out for the Ministry for.
©2011 Ben Keet 1 A new method to identify sources of lead and other heavy metal contaminants in house and work place dust in New Zealand.
Surface Mining Remediation Utilizing Vertical Flow Wetlands and Engineered Soils Matthew Gloe, Christian Bongard, Gil Brown Biological Systems Engineering,
Chung-Shiau Ho*,Wen-Yen Huang, Wen-Ling Hong, Chitsan Lin, Po-Han Chen
Delivering Excellence in Remediation of Contaminated Sites.
1 of 25 The EPA 7-Step DQO Process Step 5 - Define Decision Rules 15 minutes Presenter: Sebastian Tindall DQO Training Course Day 2 Module 14.
Copyright © Texas Education Agency, All rights reserved. 1 Web Technologies Website Development with Dreamweaver.
, CENTRAL ETHIOPIA Are these lakes connected? Shemelis Fikre Addis Ababa University,Department of Earth Sciences POBOX 1176, Addis Ababa, Ethiopia.
GCSE Sciences are changing Spring Copyright © 2010 AQA and its licensors. All rights reserved A flexible science suite One GCSE New Science A Two.
Enviromental aspects of Brownfield Regeneration Barbara Vojvodíková, Marcela Maturová „This project has been funded with support from the European Commission.
PIT MANAGEMENT Why? Technical Standards Branch CEA PRESENTATION Revised Feb14 Bruce Blue.
M.K. PANDEY/P. Jenssen Centralised –Decentralised transportation system.
Wes Marshall, P.E. University of Connecticut March 2007
GFOA PS3260 Contaminated Sites Workshop Thursday, November 14, 2013 Whitehorse, YT.
Average Atomic Mass of Beanium
© 2012 MISTRAS GROUP, INC. ALL RIGHTS RESERVED. DISSEMINATION, UNAUTHORIZED USE AND/OR DUPLICATION NOT PERMITTED. TankReporter 2.0 A Step by Step Example.
Decontamination of filed equipment used in environmental site characterization and ground-water monitoring projects University of Arkansas 11/13/2006 By.
Conclusions Geophysical Methods for Road Construction and Maintenance Hedi Rasul 1&2, Caroline Karlsson 1, Imran A. Jamali 1, Robert Earon 1, Bo Olofsson.
Site Investigation and Storage Structure Sizing CNMP Core Curriculum Section 4 – Manure Wastewater Storage and Handling.
COMMITMENT & INTEGRITY DRIVE RESULTS Risk Based Corrective Action Using site-specific risk assessment to achieve Regulatory Closure.
Jan Smolders ( 史默德) Independent Consultant Soil & Groundwater Remediation Jan Smolders, Client Advisor Soil & Groundwater Remediation 1.
Exercise 1 Heavy Metal Phytoextraction A plant accumulates a heavy metal to a bioconcentration factor of 10 (kg/kg dry weight based). There is a layer.
ENVIRONMENTAL ODDITIES From Here to There, and There to Here… PESTICIDES CAN BE FOUND ANYWHERE! Prepared By: Jeffrey Sotek, PE, CSP, CIH
New Bedford High School & Adjacent Properties Status of Off-Site Environmental Investigations - Public Meeting July 12, 2006.
K8K8 ©2003 K8 Ltd slide 1 Keynote Paper: Contaminated Sites WasteMINZ, Nelson 2003 Historic part: Managing Contaminated Sites in Europe from a Dutch Perspective;
Review of Current Conditions Report and Work Plan for Area 1 Presented by The Great Plains/Rocky Mountain Technical Outreach Services for Communities.
Area I Burn Pit Santa Susana Field Laboratory RCRA Facility Investigation Work Plan February 19, 2008 Laura Rainey, P.G. Senior Engineering Geologist California.
CENTRAL FLORIDA REGIONAL PLANNING COUNCIL FLORIDA BROWNFIELDS CONFERENCE November 14, 2011.
1 of 36 The EPA 7-Step DQO Process Step 6 - Specify Error Tolerances (60 minutes) (15 minute Morning Break) Presenter: Sebastian Tindall DQO Training Course.
Neighbours’ Meeting 29 th September Introductions  David Hopman – Manager Assets and Operations  Kevin Godfrey – Treatment Plant Supervisor.
ENVIRONMENTAL SITE ASSESSMENT & THE PROJECT DEVELOPMENT PROCESS.
1 of 27 The EPA 7-Step DQO Process Step 5 - Define Decision Rules (15 minutes) Presenter: Sebastian Tindall Day 2 DQO Training Course Module 5.
1 Analytical Services Program Workshop September 2015 Data Usability Applications and Importance Kelly Black Statistician / President.
State of Rhode Island Department of Environmental Management Office of Waste Management Policy Memo Guidelines for the Management of Historically.
1 of 31 The EPA 7-Step DQO Process Step 6 - Specify Error Tolerances 60 minutes (15 minute Morning Break) Presenter: Sebastian Tindall DQO Training Course.
Case Study – A Brownfield Cleanup in the City of Amsterdam, NY Joseph S. Campisi Geomatrix Consultants, Inc.
1 FORMER COS COB POWER PLANT From Characterization to Redevelopment Brownfields2006 November 14, 2006.
©2006 Ben Keet 1 Cost – performance curves A tool to evaluate alternative remedial options before and during projects.
Bancroft Elementary School School Building Committee Meeting February 24, 2010.
Renewable Energy at Contaminated Sites in in New York City Daniel C. Walsh Ph.D. NYC Mayor’s Office April 4, 2011.
Jeffrey Lively Chief Scientist Radiological Services & Engineering Amec Foster Wheeler.
Possible transportation routes of heavy metals in floodplains
Environment and Climate Change Presentation to the Nunavut Water Board Regarding Doris North Project Type A Water Licence Amendment Application Nunavut.
Building Planning and Drawing
Civil & Chemical Engineering Department Graduation Project 2
Environmental Issues Mapping Field Lab
Deyuan Kong and Sara Mcmillen, Chevron Energy Technology Company USA
Managing Environmental Data for Conceptual Site Models
Forum on the strategies for the management and development of contaminated sites in Taiwan Shian-chee Wu October 25, 2007.
The International Committee on Contaminated Land Management of Groundwater Quality in the Netherlands
Presentation transcript:

©2011 Ben Keet 1 Case Studies Contaminated Land Sheep-dips & Orchards Drs. Ben Keet FRSC Geo & Hydro – K8 Ltd

Background Drs Ben Keet FRSC MRSNZ 1 st class doctoral in isotope hydrochemistry from Amsterdam University 5 years assistant lecturer physics and groundwater hydraulics and modeling 5 years petroleum engineer and reservoir manager at Shell International Since 1987 worked on contaminated land projects: Managed and supervised over 4500 projects Worked in NZ, Australia, Europe and the US Specialised in remediation technology, as contractor and consultant Provided workshops and courses to hundreds of professionals in Holland, Belgium, Australia and New Zealand Author of handbooks and guidelines on contaminated land Other studies include low emission emulsion fuels, organic agriculture, chemicals in food and the house and garden environments Ben Keet 2

Case: Sheep-dip Assessment Ben Keet 3 Towards Swim dip Spray dip

Ben Keet 4

Swim dip Ben Keet 5 Note the gully, a possible discharge route for sludge from the sheep-dip This site shows a second option for sludge disposal: a rack with 3” pipes. Path leading to woolshed

Setting out sample grid Ben Keet 6

Setting out sample grid Ben Keet 7

Results Ben Keet 8  Row Sample Transec t  As in mg/kg w.w.

Correlation XRF field analysis with Laboratory analysis Ben Keet 9 mg/kg d.w.

Ben Keet 10 Case: 3 ha Orchard Hastings, New Zealand To be subdivided into 34 lots Main contaminant: Arsenic

Case study objective Combining field and laboratory analysis gives: Higher accuracy Faster decision making Lower costs In this case cost is the leading factor choosing sample density Ben Keet 11

Ben Keet 12 Using historical data and aerial photo’s: Conceptual Site Model sheds / structures -2 pear tree blocks For remediation by soil mixing Important questions are: > Where are other ‘hidden’ hotspots? > What size of hotspot is important? > How deep are they? > What volume and concentration?

Environmental Site Assessment (ESA) Maximum budget ESA $ 30,000.- ex GST. Initial budget calculation : Time and mileage etc.$ 1,000.- Hist. Search, meetings$ 3,000.- Reporting $ 6,000.- Sampling objects / hot spots 10 Lab analysis (Metals, OCPNsc)$ 4,000.- This leaves $ 16,000.- to characterise the ‘diffuse‘ contamination on 3 ha.

Conventional Approach Cost for data gathering per sample Sample taking, COC, courier to lab$ Analysis (laboratory)$ total$ 80.- For $ We can get 200 samples taken and analysed Sampling 2 layers  100 data points / layer 3 ha/ 100 = 1 data point/ 300 m 2 (grid size 18x18 m) Ben Keet 14

Ben Keet 15 A 18x18 m 200 ppm hotspot requires 945 m 3 ‘background’ soil to dilute to < 25 mg/kg 945 m 3 at 200mm topsoil thickness requires 5000 m 2

Conclusion Conventional sampling – lab analysis Minimum grid size 18 x 18 m Undetected hotspots up to 300 m 2 Requires about 1000 m 3 to dilute Topsoil of 200 mm: this requires area of 5000 m 2 If more than 6 hotspots  soil mixing will be a failure Need to identify hot spots more accurately Extra problem: in parts topsoil on site up to 600 mm thick Ben Keet 16

Alternative method Cost for more intense data gathering using on-site XRF analysis a 2 man site team + XRF costs $ 200.-/hr Sample 4 layers (0 – 75 – 200 – 400 – 700mm) AND analysing each sample takes 4 minutes / borehole Cost: $ / borehole ( $ 3.50 /sample analysed in the field)  3696 samples were taken and analysed from 924 grid points, reducing grid size to 6 x 6 m – 4 layer, for $ 12,500.- With $ 3,500.- left over for QA/QC analysis by lab Ben Keet 17

Ben Keet 18 After site assessment with XRF with 24 boreholes per lot, a total of 912 boreholes, with analysis of 4 layers Conceptual Site Model 2 Found: 9 hot spot areas 2 associated with ‘objects’ 7 not related to objects Hotspots to depth of 600 mm Based on hot spot removal BEFORE mixing final As concentration is calculated to become 24 mg/kg Mixing soil without hotspot removal gives would give As conc. 36 mg/kg, i.e. over the guideline level.

Ben Keet 19 Setting out Hot Spots With depth to be excavated (mm) Hot Spot removal Checking excavations mark As concentration as means of communication with excavator

Ben Keet 20 X = OK to MiX 0 = below guideline H = “Hot” – bury in Reserve Cleaning out hot spots

Ben Keet 21 After burial of hot spot soil in reserves.. all remaining top soil is stripped and laid on a mix pile in 50 mm layers alternating contaminated and clean soil. Mixing by laying out soil in layers and disking

Ben Keet 22 Over 3000 XRF analysis performed during soil mixing

Ben Keet 23 Vertical mixing before final lay-out on sections

Result of XRF checks during remediation 4 more hotspots detected and separated from mix-pile soil No hold-up for contractor All laboratory analysis of soil laid out on sections had concentrations below guideline levels No re-mixing required ! Ben Keet 24

Conclusion: Better & Cheaper Using combined on-site and laboratory analysis results in: Greatly improved data quality Very cost effective Fits perfectly in TRIAD approach XRF saved a costly re-mix ($ 85,000.-) Suited to clients who like you to: “do it right; do it once” & save money ! Ben Keet 25

Ben Keet 26 Thank you for your attention Questions - Discussion Where did the sheep-dip go ? Slip at Aramoana woolshed 2011

Ben Keet 27