Working Successfully With Property Managers: An Interactive Engagement

Slides:



Advertisements
Similar presentations
Oklahoma Department of Transportation Susan McClune Regulatory Services.
Advertisements

Pavements. Concrete –Rigid pavement Used where strength is an issue Runways, interstates and major roads –Continuous reinforcing Must have a good base.
Herndon Station - North Pavilion Construction Town of Herndon – Town Council August 6, 2014.
Lander Streets and Utilities 2015 Public Meeting No. 2 McDougall & Cliff Project Area.
Dillon and Christina Project Area Lander Streets and Utilities 2015 Public Meeting No. 2.
With the Genesee County Road Commission By Fred Peivandi, P.E. And Ken Johnson, P.E. Local Road Funding.
Pavement Design Terms and Concepts
2014 Roadway Rehabilitation Project Neighborhood Pre-construction Meeting Monday, June 9, :00 p.m. Currell Boulevard Tamarack Road.
MICHIGAN RIDES ON US 2015 Local Roads Workshop Gaylord March 12, 2015.
1 Asphalt Quality Assurance Program & Construction Inspection 2015 Asphalt Regional Seminars Rob Crandol, P.E. VDOT – Materials Division Assistant State.
PROCEDURES FOR SELECTING THE CONTRACTOR
 Embankment Construction – LOTs  What is the maximum length of a LOT? Mainline pavement lanes, turn lanes, ramps, parking lots, concrete box.
Asphalt Quality Assurance Program
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Interstate 81 Bridges over Route 80 Design-Build Project (PIN , D900023) Town of Tully, Onondaga County.
2011 Raze & Removal Pilot The WisDOT Northeast Region embarked on a new raze and removal process on a project in Sheboygan & Fond du Lac. It’s purpose.
Engineering and Technical Plans Description, process and standards Dh 2005.
Discussion Topics Construction Contract Administration Lessons Learned Other Construction Issues Questions? / Comments (Anytime)
Borough of Madison Woodland Avenue Reconstruction Engineering CY2009 Existing Conditions Underground Infrastructure Municipal Aid Application Reconstruction.
Statewide Community Infrastructure Program “SCIP”.
IDM Chapter 104 Utility Coordination Joe Gundersen Senior Utility Engineer, INDOT August 21, 2014.
Trail Funding Sources & General Information
In this Presentation…. Project Overview Key Issues Elements of Design Funding and Schedule.
1 BROOKHAVEN SCIENCE ASSOCIATES Ring Building Construction Status Michael P. Bromfield Construction Engineer NSLS II Conventional Facilities Advisory Committee.
NC Region Speakers:. Now What?  EBS  Pothole  Vac Truck  T & M  Force Account  Con Mod/Change Order  LCS  QMP (QC, QV, IA)  QC  QV  IA Excavation.
Overview Based on Indiana’s first A+B+C Contract. Why Warranty? What is in it for the Contractor? Lessons Learned?
 Have an approved mix design before paving.  The department has eliminated the use of PG -22 Asphaltic Material and replaced it with PG -28.  Tack.
E NGINEERING D IVISION 13 th Street Storm Drain Replacement Project Prebid Meeting for Phases 2 & 3.
IDM Chapter 104 Utility Coordination Joe Gundersen Senior Utility Engineer, INDOT November 19, 2013.
Two Heads are Better Than One Patrick Callahan, Snyder & Associates Handouts and presentation are available online at
New York State Department of Transportation Accelerated Bridge Program Phase 1B Design-Build Projects Request for Proposals Informational Meeting April.
New York State Department of Transportation I-190 and NY Route 265 Over the New York Power Authority Reservoir (BINS & ) PIN , Contract.
Construction Materials and Workmanship. All workmanship, materials, equipment, and articles incorporated into the work are to be of the best available.
IDM Chapter 104 Utility Coordination Gail Lee Utility and Railroad Engineer, INDOT June 10, 2015.
Grow Your Business 1 st Annual Building Services Outreach Session October 18, 2013.
Presentation to the Chamber of Commerce Friday, April 23, 2010.
City of Palm Coast, Florida City Council Meeting October 2, 2012.
Professional Engineering Procurement Services Division Solicitation No. 15-5RFP5004 Donella Drive Improvements Project Status Presented By: Kyle Gass,
PUBLIC INPUT SESSION OCTOBER 27, 2015 City of Asbury Sun Valley Dr. and Sun Ridge Ct. Reconstruction Project.
PUBLIC INPUT SESSION NOVEMBER 10, 2015 City of Asbury Birchwood Drive Reconstruction Project.
Trenton M. Clark, P.E. Director of Engineering Virginia Asphalt Association.
WEDGEWOOD COVE HOA STREET PAVING/RESURFACING PROJECT.
90% PLAN APPROVAL. Presentation Outline  Board Direction  90% Plan Modifications  Cost Estimates  Project Timeline  Recommendation.
Introduction to Procurement for Public Housing Authorities Sealed Bids Unit 5.
Guidelines for Land Clearing Presented By: SLC Environmental Resources Department.
1 EASTERN MUNICIPAL WATER DISTRICT Temecula Valley Regional Water Reclamation Facility 23-MGD Expansion Project Joe Mouawad, P.E. Senior Director.
City of Belmont Pavement Reconstruction Project October 15, 2014.
Expanded Shave and Pave Program Roads and Parks Maintenance Department Development & Infrastructure Division October 23, 2012.
Hurricane Ike Recovery CITY OF GALVESTON March 26, 2015.
1 New Territory Municipal Utility Districts Strategic Partnership Agreement Discussions With the City of Sugar Land.
PRESENTED AND PREPARED BY CITY OF MISSOULA PUBLIC WORKS DEPARTMENT.
CAPA 66 th Annual Meeting – April 22, Fiscal Update Staffing Funding Lettings 2.
PUBLIC WORKS FY 2012 Proposed Budget May 24, 2012.
PUBLIC IMPROVEMENT HEARING 2015 Street, Utility and Retaining Wall Improvements - Grandview Boulevard November 12, 2014 (continued to December 9, 2014)
MnDOT AUDIT 2016 COUNTY HIGHWAY ACCOUNTANTS CONFERENCE ANNUAL FEDERAL CITY COUNTY AUDIT DISCUSSION.
2013 Roads and Sidewalk Capital Programs Roads and Parks Maintenance Department Development & Infrastructure Division December 2, 2013.
VDOT’S PREVENTIVE MAINTENANCE TECHNIQUES & EXPECTATIONS
City of Dayton Department of Planning & Community Development
Village of east aurora full depth road reconstruction & infrastructure improvements West Fillmore Avenue.
Special Assessments John T. Shockley, Attorney Ohnstad Twichell, P.C.
2016 Mill and Overlay Project
City of San Jacinto 7th Street Pavement Repairs
Construction Oversight
Sausalito Downtown Public Restroom
Panel discussion Date.
Participatory Road Program neighborhood meeting Donahoo 174th Street
Village of Sherwood Stumpf Subdivision Paving and Drainage Improvements November 7, 2018.
Quality Assurance for Emulsified Asphalt Surface Treatments
Prime Factors for Successful Preservation Treatments
Robincrest/Elmgate/ Linneman Improvements Welcome!
Hoops, haddock, cascade, oriole, Ervin and valley view heights paving
Presentation transcript:

Working Successfully With Property Managers: An Interactive Engagement Bryan Tarlton, Construction Manager City of Charlotte Engineering Department Friday January 29, 2016

Agenda: Type of work Engineering Services does How to qualify for City Work Bid Process Plans and Specifications Roadway Construction Asphalt Mix Designs Asphalt Laydown and Testing Key Points of a Good Job Finished Product City / Contractor Relationship Questions??

Type of Work Engineering Services Does: Roadway Milling and Resurfacing (yearly projects-maintenance) Concrete Curb / Gutter Sidewalk Pavement Marking Surface Treatments: Chip Seal Storm Drainage Utility (water and sewer) Pedestrian Paths (parks, nature trails, etc.) Parking Lots (building services etc.)

How to Qualify for City Work: NCDOT Approved Bidders List https://partner.ncdot.gov/vendordirectory/search.html?s=pbs&a=new City of Charlotte Approved Vendor No outstanding project issues from previous work Responsive and Responsible Contractors CBI Compliance (disadvantaged businesses) Bid Bonds Performance and Payment bonds City website: http://charmeck.org/city/charlotte/SharedServices/Procurement/pages/doingbusiness.aspx

Bid Process Almost all construction contracts are low bid Bid Advertisement on the City website Pre-Bid meeting on some projects Bid deadline strictly enforced (clock on the wall) Bids checked then lowest responsible bidder is advised of potential award by email All bids over $100,000 go to City Council for approval Bids then go to City Clerk for execution Contracts collects all bonds and various documentation Produce a contract for signature by City and Contractor Pre-Construction meeting with construction staff Notice to Proceed issued

Plans and Specifications Project Plans Project Contract NCDOT Specifications and Standard Drawings City Specifications and Land Development Standards City Special Provisions (asphalt less than 30% RAP) Project Special Provisions Inspector Testing Firms Project Audits Project Finals and warranty period

Roadway Construction Survey and Layout Clearing / Grubbing Grading (keeping roadways clean) Storm Drainage Utility Curb Asphalt or Concrete Sidewalk Pavement Marking

Asphalt Mix Designs NCDOT Approved Super-pave Mixes (surface, intermediate, and base) RAP Mixes (less then 30%) QC testing Plant verification Mix verification QA testing Straight edge testing

Asphalt Laydown and Testing Clean Surface with sweeper Tack Coat application Surface temperature Ambient temperature Yearly timeframe Correct equipment (paver and rollers) Density testing

Key Points of a Good Job Site cleanliness (sweepers, vacuum trucks) Smooth and even surface Clean and sharp pavement markings Landscaping and grass

Finished Product Warranty Period Meets plans and specifications Aesthetically pleasing Ride-ability Pavement marking clear and sharp (paint and thermoplastic) Roadway cleaned and swept of debris Warranty Period 6 month inspection 11 month inspection

City / Contractor Relationship Rules of the Game Partnership Trust Validation Resolve Differences through negotiation Beyond negotiation ??

Thank You Questions?? Bryan Tarlton