Lake Pleasant Parkway Final Design Dynamite to SR303L ASHE LAKE PLEASANT PARKWAY DYNAMITE TO SR303L C HRIS KMETTY, PE JAN 11, 2011.

Slides:



Advertisements
Similar presentations
Piedmont Improvement Program NC Society of Engineers
Advertisements

Robert Samour, P.E. Deputy State Engineer Valley Transportation
US 491 South Corridor FLH-666-1(49)17 CN 2357 Navajo 9 to Sheep Springs (NM 134) MP 15 to MP 46 Public Information Meeting November 1, 2006.
Tysons Tysons Corner Circulator Study Board Transportation Committee June 12, 2012.
County of Fairfax, Virginia Board Transportation Committee Updates on Alternatives for Improving Roadway Services in Fairfax County Discussion of Converting.
Click to edit Master title style »Click to edit Master text styles –Second level Third level –Fourth level Fifth level Construction Update 11/13/2012 Larry.
Fairfax County Board of Supervisors Transportation Sub-Committee Briefing Federal Highway Administration Eastern Federal Lands Highway Division Robert.
Replacement of the Queens Approach Bronx-Whitestone Bridge
Resource Team/TEER Meeting October 19, CBRT Meeting October 19, 2006 Agenda 10:00 AM 10:05 AM 10:30 AM 11:30 AM Noon Introductions and Housekeeping.
2003 MUTCD Part 2C Warning Signs
City of Hubbard Transportation System Plan Update April 25, 2012.
DEL-71 Project at the US 36/SR37 Interchange Round Table Meeting Ferzan M. Ahmed, P.E.- District 6 Deputy Director Steve Fellenger, P.E. – Project Manager.
Project Description and Needs Lincoln Way Widening Addition of a center-turn lane and safety improvements to the grade and horizontal alignment. Needs.
From I-24 (MP 44) to I-64 (MP 92) is 48 miles ADT 2009 ADT = 30,000 vehicles per 2.2% growth rate 2030 ADT = 48,000 vpd 2009 Average Daily Truck.
Executive Summary Introduction In 1988, by virtue of State Statute , the Nebraska State Legislature first assigned the Nebraska Department.
City of Fargo Mickelson Field Area Flood Risk Management – Project 5902 Public Information Meeting November 19, 2012.
Minneapolis – St. Paul Visitor Count and Profile
Fine Tuning Boulders transportation system Presented by: Marni Ratzel GO Boulder/ city of boulder making infrastructure work for biking and Walking.
Alachua County Board of County Commissioners NW 16 th Avenue / NW 23 rd Avenue (NW 57 th Terrace to NW 13 th Street) Alachua County Public Works HDR Engineering.
City of Olympia | Capital of Washington State Percival Landing Update Land Use Committee Meeting March 27, 2014.
VARIABLE SPEED LIMIT DEPLOYMENT EVALUATION I-270/I-255 Traffic and Safety Conference May 12, 2010 Missouri University of Science and Technology and HDR.
Great Western Corridor Feasibility Study
Gateway Corridor Alternatives Analysis Findings Metropolitan Council Transportation Committee November 26, 2012.
Public Meeting Presentation March 15, Project Location Project Purpose –Traffic reliever to I-95 –Integrate road with the Northwest Sector Plan.
CR 46A Realignment (Section 5)
EFFICIENT TRANSPORTATION SOLUTIONS IN MINNESOTA A JOINT PRESENTATION TO THE Transportation Funding Advisory Committee September 14, 2012.
TH 610 Design-Build Project S.P February 25, 2009 Dan W. Penn, P.E. Mn/DOT Project Manager PROJECT INFORMATIONAL MEETING Looking TH 169.
City Council Meeting Agenda Items October 28, 2013.
The Ohio Department of Transportation 1 I-280 Trench Project Public Meeting Monday, October 20, 2008 Ted Strickland, Ohio Governor James Beasley, P.E./P.S.
Hot Springs Public Meeting Reconstruction of US 18 & US 385
Belt Line Project Cost Update May 27, Belt Line – Project Overview Undergrounding of aerial utilities – electrical and telecom Two Phases – Marsh.
CMGC Contracting at UDOT Program, Projects & Lessons Learned
PSSA Preparation.
Essential Cell Biology
Urban Transportation Council Green Guide for Roads Task Force TAC 2009 Annual Conference and Exhibition Vancouver.
Maryland Avenue and Arkwright Street Jerry Auge, PE Project Manager Ramsey County April 2, 2013.
Maryland Avenue and Arkwright Street Jerry Auge, PE Project Manager Ramsey County June 25, 2013.
City of Toledo Bancroft Street Neighborhood Public Meeting November 20, 2013.
1 Loop 303 US 60 to Happy Valley Parkway Arizona Department of Transportation February 26, 2014.
Cost Estimation System Tool
City Council Meeting Lisa A. Kuss City Administrator May 8, 2012.
County of Fairfax, Virginia Sully District Council Meeting November 19, 2014.
Facilities & Campus Planning North Pleasant Street Improvement Plan Faculty Senate – February 28, 2008.
S.R. 690 (118th Avenue) (C.R. 296). Agenda Introduction Alternative Analysis –Comparison of Compressed ROW and Viaduct –Why the Viaduct –Flyover Alternative.
State of Florida Department of Transportation SR 7 (US 441) Value Engineering Study September 24-28, 2001 Segment III - From North of Hollywood Blvd to.
Montwood Street & Drainage Improvement Project Solicitation No November 26, 2012.
Schools Jobs Revenues Services Recreation Environment Transportation Transportation Connectivity Housing Public Safety Pontiac’s.
Environmental Assessment Public Information Meeting – September 2010 Realignment of a Portion of a Utah Lake Drainage Basin Water Delivery System (ULS)
Congressional District Projects New CD-3 SMART 160 Trail: — This trail will be a multiple use trail and will offer access to a network of current and proposed.
US 1 COLLEGE PARK – SEGMENT 1 FROM COLLEGE AVE/REGENTS DRIVE TO MD 193 (UNIVERSITY BLVD) Presentation to College Park City Council August 5,
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
Current Construction Projects Major Projects Pinellas County.
ILLINOIS ROUTE 23 (LaSalle St.) DOWNTOWN RE-ALIGNMENT December 2, 2008.
1 Tower Road Project Update. 2 The Project Team requests the Alachua County Commission: Authorize staff to: Proceed with re-evaluating four (4) key issues.
Transportation and Transit Committee 4 December 2002 Albion Road Corridor Study.
Community Development Department Construction Phase BULLDOG DRIVE.
North Main Street Improvements BID Meeting Wednesday, October 29, 2008.
Oregon Transportation Commission October 14, 2015 OR 99 Rogue Valley Corridor Plan.
AWARD OF CONTRACT FOR CONSTRUCTION OF CALIFORNIA OAKS ROAD AT I-15 INTERCHANGE CIP NO City Council Meeting January 18, 2011.
STA Safety Project PID #76439 December 12, 2006.
COUNTY ROAD 517 Improvements from State Highway 172 to Howe Drive DECEMBER 16, 2015 At Tribal Multipurpose Facility.
1 MD 5 (Point Lookout Road) Leonardtown (Phase 1) Intersection Reconstruction At Abell and Moakley Streets Informational Meeting January 19, 2016.
Girvin Road Improvements (Atlantic Blvd. to Wonderwood Dr.) Public Information Meeting March 3, 2016.
S.R. 30A / U.S. 98 / Panama City Beach Parkway Project Development & Environment (PD&E) Study F ROM M ANDY L ANE TO T HOMAS D RIVE I NTERSECTION B AY C.
S.R. 30A / U.S. 98 / Panama City Beach Parkway
Issaquah-Fall City Road
Lyle Parkway to SR 540 (Winter Lake Road)
1200 West Widening and Reconstruction Project
Protected Bicycle Lanes Finally Pedal Their Way to KC…
Presentation transcript:

Lake Pleasant Parkway Final Design Dynamite to SR303L ASHE LAKE PLEASANT PARKWAY DYNAMITE TO SR303L C HRIS KMETTY, PE JAN 11, 2011

Lake Pleasant Parkway Final Design Dynamite to SR303L 2 LPP: Project Background LPP: Unique Project Aspects Upcoming City Projects PIPS Questions and Answers Agenda

Lake Pleasant Parkway Final Design Dynamite to SR303L 3 Bring necessary infrastructure to the new Loop 303 corridor for future economic development in the area Project Purpose

Lake Pleasant Parkway Final Design Dynamite to SR303L Original Design Concept Report Westwing to SR74 Section north of Westwing was Rural Jan 2009 Selected PB Team Update DCR and Final Design Feb 2010 Update to the DCR Completed Westwing to SR74 Sept 2010 Final Design Kick Off Westwing to SR303L Construction Funded in FY12 Project History/Schedule

Lake Pleasant Parkway Final Design Dynamite to SR303L 5 Parkway facility from Westwing Parkway to Loop 303 (four lane interim; six lane ultimate) Median, C & G, sidewalk, bike lanes Signal: Lake Pleasant and Westwing Parkway New 21 Sewer Line (over 25 Deep) New 24 Water Line El Paso Gas Line Crossing Enhanced Landscaping Sustainable Road Project Description

Lake Pleasant Parkway Final Design Dynamite to SR303L 6 Typical Section

Lake Pleasant Parkway Final Design Dynamite to SR303L 7 Recommended Alignment

Lake Pleasant Parkway Final Design Dynamite to SR303L 8 Depth varies from 10 to 30 Hard digs and blasting anticipated Sequencing with Maintenance of Traffic Small Percentage of Cost Major Percentage of Risk Deep Sewer

Lake Pleasant Parkway Final Design Dynamite to SR303L 9 Extend Dry Utilities to 303L to increase economic development potential along 303 Corridor What is chance we are correct…30%? Dry Utilities Alternatives evaluated by the City All Inclusive Shovel Ready: Utilities Parallel Roadway and Crossings Conduits Parallel to Roadway Conduit Crossings Only at ½ Mile Intervals Dry Utility Corridor AlternativeCost Option I: All inclusive (conduits, manholes and fiber)$5M Option II: Conduits and manholes$2M Option III: Conduits at crossings only$100K

Lake Pleasant Parkway Final Design Dynamite to SR303L 10 What is a Sustainable Road? No Existing Standard Evaluating GreenRoads vs. Peoria Brown Roads FHWA Test Program for Sustainable Highways Conclusion: Sustainable are most of our Best Practices Sustainability

Lake Pleasant Parkway Final Design Dynamite to SR303L 11 Project Costs Alt. I: CMAR Alt. II: Low Bid Alt. III: CMAR/Bid Combo Additions During Design Stage Preconstruction Services (PS), Constructability Review (CR), Geotech Work(G) $ 200,000 (PS)$ 170,000 (CR;G)$ 180,000 (PS;CR) Construction Estimate (Initial Contract) DBB 10% lower than CMAR (includes All Wish List Items) $ 33,343,000 $ 29,988,000 $ 32,423,000 Construction Services Post-Design Services $333,000 (1%) $450,000 (1.5%) $467,000 (1.5%) Change Orders (Owner Contingency) $ 1,000,000 (3%) $3,075,000 (13%) $2,973,000 (8%) Construction Management $3,335,000 (10%) $ 3,701,000 (12%) $3,567,000 (11%) Total Construction Services $4,668,000 $7,696,000 $7,107,000 TOTAL CONSTRUCTION COSTS (2% DBB Savings Does not include Litigation/Geotech Risk) $ 38,211,000 $ 37,384,000 $ 39,610,000 CMAR vs. Low Bid

Lake Pleasant Parkway Final Design Dynamite to SR303L 12 Stakeholders MAG/ADOT State Land FCDMC (BLM) CAP (BLM) EPNG PB Team Ritoch Powell Terracon EcoPlan Corral Dybas Group Project Team

Lake Pleasant Parkway Final Design Dynamite to SR303L 13 Design (FY12) 75th Ave and Cactus: Intersection Improvement 75th Ave and Peoria: Intersection Improvement 91st Ave: Butler to Mountain View: Widening & Median Underground Overhead Power Lines Study JOC (Dates TBD) Streets/Paving Minor Concrete Bids Beardsley and 99th Ave Intersection (Spring 11) Lake Pleasant Parkway (Winter 11) Upcoming City Projects

Lake Pleasant Parkway Final Design Dynamite to SR303L 14 Changes: No Past Performance Scores References Add Project Understanding and Approach Length Determined by Project Stay the Same: Anonymous Project Assessment, Value Add, Schedule Team and Individual Interviews PIPS: Modifications

Lake Pleasant Parkway Final Design Dynamite to SR303L QUESTIONS JANUARY 11, 2011