Safety Assessment The European Organisation for the Safety of Air Navigation.

Slides:



Advertisements
Similar presentations
Medical devices: Application of risk management to medical devices
Advertisements

1 Documentation Legal Framework Air Navigation Orders Guidelines ATS Manual Airport Manual Safety Management Manual ICAO Annexes Licenses / Certificates.
Module N° 4 – ICAO SSP framework
Integra Consult A/S Safety Assessment. Integra Consult A/S SAFETY ASSESSMENT Objective Objective –Demonstrate that an acceptable level of safety will.
1 Welcome Safety Regulatory Function Handbook April 2006.
Integra Consult A/S November 2005Karachi, Pakistan Safety Assessment Projects Karachi, Pakistan Integra Consult A/S.
1 Regulation. 2 Organisational separation 3 Functional Separation.
EUROCAE WG 73: UAS integration Elements for the European Commission UAS panel Presentation at Workshop 2 UAS insertion into airspace Gérard Mardiné (SAFRAN-Sagem)
Overview of the interoperability Regulation
1 PHARE and Reality by Wolfgang Philipp Senior Director EATMP EUROCONTROL.
Preliminary Hazard Analysis of EUROCONTROL Concept of Operations 2011 using the FAST method European Organisation for the Safety of Air Navigation presented.
The European Organisation for the Safety of Air Navigation Introducing the DAL Concept DAL/DQR Workshop Brussels, February 2013 Presented by: Miguel.
The European Organisation for the Safety of Air Navigation DAL/DQR Workshop Introduction Brussels, February 2013 Presented by: Manfred Unterreiner.
EASA ATM/ANS Standardisation “State Inspection”
The European Organisation for the Safety of Air Navigation DAL/DQR Workshop Conclusions Brussels, February 2013 Presented by: Manfred Unterreiner.
ADQ Implementation Support Cell
The European Organisation for the Safety of Air Navigation Introducing the DQR Concept DAL/DQR Workshop Brussels, February 2013 Presented by: Miguel.
The European Organisation for the Safety of Air Navigation Implementing DQR - A Practical View DAL/DQR Workshop Brussels, February 2013 Presented.
The European Organisation for the Safety of Air Navigation DQR – Roles and Responsibilities DAL/DQR Workshop Brussels, February 2013 Presented by:
The New GMP Annex 11 and Chapter 4 Deadline for coming into operation: 30 June 2011.
Ensuring a 'Flexible Use of Airspace'…. Patrick Delmouzée Head of ATM Unit DSS/CM EUROCONTROL Moving towards an Integrated ASM/ATFCM/ATS Approach EUROCONTROL.
AIM Operational Concept
System Testing 2  Effective March 3, 2014, new requirements for system testing were implemented  State Agencies are now required to provide to FNS:
E-OCVM (Version 2) Explained Episode 3 - CAATS II Final Dissemination Event Alistair Jackson EUROCONTROL Episode 3 Brussels, 13 & 14 Oct 2009.
Introduction to PPDs Regulatory requirements and rationale.
Please read this before using presentation This presentation is based on content presented at the Industry Forum on Reducing.
PBN Airspace Concept Process
Proposals: three major types  Research Proposal proposes to define problem proposes to define problem  Evaluation Proposal proposes to evaluate solutions.
Objective ITY-ADQ ESSIP Plan 2014 Ana Paula FRANGOLHO DSS/EIPR
ToR of GEOSAF2 WG on Operational Safety Review of WG2.
QUALITY MANAGEMENT SYSTEM ACCORDING TO ISO
1 Project Management Principles Coursework Assignment: Things to pay attention to, for the report and the oral presentation...
Introduction to ISO New and modified requirements.
Copyright 2005 Welcome to The Great Lakes TL 9000 SIG TL 9000 Requirements Release 3.0 to Release 4.0 Differences Bob Clancy Vice President, BIZPHYX,
Audit objectives, Planning The Audit
Module N° 8 – SSP implementation plan. SSP – A structured approach Module 2 Basic safety management concepts Module 2 Basic safety management concepts.
Product Development Chapter 6. Definitions needed: Verification: The process of evaluating compliance to regulations, standards, or specifications.
1 FRENCH PROPOSAL FOR ESARR6 1 - BACKGROUND - 15/02/00 : Kick-off meeting, Presentation of the CAA/SRG input (SW01), Request from the chairman to comment.
European Commission: DG Environment Streamlining and harmonizing climate change and air pollution requirements TFEIP, 23 – 24 May 2007, Dessau Eduard Dame.
Software Safety Case Why, what and how… Jon Arvid Børretzen.
The European Organisation for the Safety of Air Navigation ADQ, INSPIRE and Metadata AIXM 5.1 Seminar.
ESARR 5 and language proficiency for ATCOs European Organisation for the Safety of Air Navigation ICAO – EUROCONTROL EUROPEAN SEMINAR ON LANGUAGE PROFICIENCY.
Specific Safety Requirements on Safety Assessment and Safety Cases for Predisposal Management of Radioactive Waste – GSR Part 5.
5 th May 2009 Assurance, Confidence and Software Safety Dr. Richard Hawkins.
International Atomic Energy Agency Roles and responsibilities for development of disposal facilities Phil Metcalf Workshop on Strategy and Methodologies.
BSBPMG501A Manage Application of Project Integrative Processes Manage Project Integrative Processes Unit Guide Diploma of Project Management Qualification.
NCAF_May03.ppt Slide - 1 CSE International Ltd Data Integrity: The use of data by safety-related systems Alastair Faulkner CEng CSE International Ltd Tel:
International Atomic Energy Agency Regulatory Review of Safety Cases for Radioactive Waste Disposal Facilities David G Bennett 7 April 2014.
Ensuring the Safety of Future Developments
Module N° 6 – SMS regulation
RMC Auditor Workshop Charleston, SC July 2015 Registration Management Committee Company Confidential RMC Auditor Workshop Charleston, SC
Toward a New ATM Software Safety Assessment Methodology dott. Francesca Matarese.
Information day on EUROCONTROL Guidance Material on the application of Common Requirements for Service Provision TECHNICAL & OPERATIONAL COMPETENCE ATS.
Information day on EUROCONTROL Guidance Material on the application of Common Requirements for Service Provision CERTIFICATION PROCESS  Peter Stastny,
European Single Procurement Document – ESPD Directive 2014/24/EU Meeting of the Commission Government Experts Group on Public Procurement 2 and 3 July.
WORKSHOP ON COMMON REQUIREMENTS FOR SERVICE PROVISION  Introduction to SESIS Guidance Material  Gerald Amar, SESIS Project Manager European Organisation.
Information day on EUROCONTROL Guidance Material on the application of Common Requirements for Service Provision  Aeronautical Information Services Provider.
Accountability & Structured Privacy Management
Ensuring the Safety of Future Developments
Objective ITY-ADQ ESSIP Plan 2015 Ana Paula FRANGOLHO DPS/PEPR
Software and Systems Integration
AIM Operational Concept
Regulation (EU) No 2015/1136 on CSM Design Targets (CSM-DT)
Presented by: Miguel Rodrigues Paulo SES unit EUROCONTROL
Safety Risk Management (SRM) Process Overview
Amendment 40 to ANNEX 15 Air Navigation Procedures for AIM Seminar
Balázs Horváth DG ENV C.1 Water Unit
DOE and NRC Regulated CM - A Comparison
Management of Change GROUP HSE RULE (CR-GR-HSE-302)
Presentation transcript:

Safety Assessment The European Organisation for the Safety of Air Navigation

Safety Assessment Safety Assessment is an EC1035/2011 requirement EC helps understanding which changes require a formal assessment that needs NSA review Experience has shown that the Safety Consideration Process provides good understanding of the changes

Safety Assessment The Only acceptable means of compliance to ESARR4 (~EC1035/2011) as of today is SAM (with limitations) SAM most suitable for hardware changes for which we can have an influence on the design, usage much more difficult for many other changes, procedures, airspace etc… SAM is a toolbox mainly known for its FHA-PSSA- SSA processes - Functional Hazard Assessment - Preliminary System Safety Assessment - System Safety Assessment

Safety Assessment eSAM eSAM V2.1 helps navigating through the documentation set of "ANS Safety Assessment Methodology"; rences/display_library_list_public.html#17http:// rences/display_library_list_public.html#17

Safety Assessment Safety considerations Initial safety argument Safety Plan Go further? Y N Safety consideration report Argumented rationale for not going further Go further? Y N Initial Safety argument (termination) Argumented rationale for not going further Safety assessment (activities as per Safety Plan) SAFETY CASE Safety Case Report Brainstorming First attempt to construct Safety Argument (high level) Translation of initial argument into required activities Conduct of activities Production of the report OPS Concept (concept elements)

Safety Assessment Safety considerations process

Safety Assessment No operational concept Scope unclear Missing assumptions Safety requirements unrealistic Bad arguments Little or no evidence Errors in calculations No concept of operations Impact at boundaries not addressed Hazards classification questionable SAFETY BENEFITS OF NORMAL OPERATIONS? What are the needs for change? What are the new system boundaries? (OPS Concept) Are there (initial) assumptions? (OPS Concept) Are (Initial) Safety requirements realistic? Will it be possible to build an argument? What evidence could be provided? Would it feasible and beneficial to quantify? How shall the new system/change be operated? What are the interfaces? What impact foreseeable? How and who will assess hazards? In what way is the proposed operational concept different from current one? Safety considerations

Safety Assessment We have trained the staff We have a fall-back system We have temporary procedures OK if breakdown Switching over should be OK We have tested the system Good Specifications System OK New center will start operations On XX/XX/XX Decision to go operational How did we do things so far? We have Revised procedures Staff OK What we used to do What we concluded

Safety Assessment What are we asked to do today? We have trained the staff We have Contingency measures We have temporary procedures OK if breakdown Switching over should be OK We have tested the system Good Specifications System OK New center will start operations On XX/XX/XX We have Revised procedures Staff OK We have trained the staff We have Contingency measures We have temporary procedures OK if breakdown Switching over should be OK We have tested the system Good Specifications System OK It will be safe to provide operations from new center We have Revised procedures Staff OK

Safety Assessment We need to demonstrate that change will be safe How are we going to do that? CONOPS Why do we want to do this change? Is there anything that we know we will only be able to prove after implementation but we are confident we are right Criteria for safety (ESARR4) Safe by design Safe after implementation Safe to migrate operations On-going operations will be safe Life cycle How are we going to do that? Safety Plan Arg0 Arg1 Arg2 Arg3 Arg4 Caveats How are we going to do that? How are we going to do that? How are we going to do that? Initial safety argument OPS Concept (concept elements)

Safety Assessment Safety Assessment for DQR [DQR-REQ-300] The safety assessment process to support the establishment of new or updated data quality requirements shall be documented and include all the necessary steps to derive the data quality requirements to ensure data of sufficient quality are provided to meet the intended use for each data item under consideration, as a minimum:

Safety Assessment 1. Identify all relevant uses for the aeronautical data item or dataset. 2. Conduct Hazard Identification and Analysis. 3. Determine accuracy and resolution requirements taking into consideration: a)The functionality, performance and availability required by the intended use to achieve an acceptable level of safety. b)The inherent limitations in originating the data item or dataset. 4. Determine the data integrity level, based on the results of step 1 and step 2, for the most stringent use. 5. Consider the necessity to assign requirements for the ability to determine the origin of the data, other than the ones already defined in Annex I Part C of Commission Regulation (EU) 73/ Consider the necessity to assign requirements for the level of assurance that the data is made available to the next intended user prior to its effective start date/time and not deleted before its effective end date/time, other than the ones already defined in Article 7(3) and Article 7(4) of Commission Regulation (EU) 73/2010. Safety Assessment for DQR

Safety Assessment Initial safety argument Lets have a look at the MS-Visio figures

Safety Assessment

Q&A The European Organisation for the Safety of Air Navigation