1 C ENTRE D'ETUDES DE LA NAVIGATION AERIENNE PHARE Aeronautical Telecommunication Network: PATN By Gérard Mittaux-Biron PATN Project Leader CENA.

Slides:



Advertisements
Similar presentations
Direction générale de lAviation civile direction de la Technique et de lInnovation direction des services de la Navigation aérienne AGCFG meeting Brussels.
Advertisements

ASECNA AGENCY FOR AIR NAVIGATION SAFETY IN AFRICA & MADAGASCAR
The Future Air Traffic Control System Presented by: Geoffrey BaileyKors van den BoogaardDon Willis EurocontrolInternational Air Transport AssociationU.S.
SIP/2012/ASBU/Nairobi-WP/19
Global ATM Operational Concept
Presented by Jean-Yves PIRAM
AMHS/SWIM Seminar Chiang Mai, Thailand 5-6 March 2012
FAA AMHS Subnetwork Overview
FANS (Future Air Navigation System) Flight Crew Procedures
Blocks 2 & 3 Overview Samuli Vuokila Air Navigation Commissioner
ESA Iris Programme: status
ICAO was created in 1944 to promote the safe and orderly development of civil aviation in the world. A specialized agency of the United Nations, it sets.
ICAO Seminar on the Implementation of Datalink and SATCOM Communications Bangkok, November 2003 VHF ACARS to ATN Akhil Sharma.
1 Study into IPS Suitability for Air-Ground ATM Communication Carsten Underbjerg, Ericsson Member of Helios Study Consortium European Organisation for.
Slide 1 NEWSKY – NEtWorking the SKY for aeronautical communications Michael Schnell, Sandro Scalise German Aerospace Center (DLR) Institute of Communications.
F E D E R A L A V I A T I O N A D M I N I S T R A T I O N A I R T R A F F I C O R G A N I Z A T I O N FAA/NASA Weather Information Communications Flight.
1 LINK European Organisation for the Safety of Air Navigation ICAO WG N Brussels July 3 rd -6 th Presented by Eurocontrol – Martin Adnams.
1 PHARE Achievements Dr. H. Schröter PHARE Programme Manager EUROCONTROL version 1.1,
1 Air-Ground Integration Ed Bailey, Airborne Project Leader & Ian Wilson, PATs Project Leader.
1 PHARE Operational Scenarios J-P. Nicolaon, Operational Task Force Chairman EUROCONTROL Experimental Centre.
1 Common Modular Simulator (CMS) : a PHARE system integration environment by J-R. Velten, CMS Project Leader CENA - ESV
1 Measurements & Validation R G Stamp Head of Department of ATM Research National Air Traffic Services Ltd, UK.
1 The PHARE Concept and Scenarios by Job Brüggen Head Air Transport Division National Aerospace Laboratory, NLR.
1 Airborne Programme by E. Bailey, Airborne Project Leader EUROCONTROL.
NexSAT SG#7 9 th March 2006 Future Communications Infrastructure Jacky Pouzet Communication Domain manager European Organisation for the Safety of Air.
Introduction ATMCP and Performance Dominique Colin de Verdière (CENA) Bernard Miaillier (Eurocontrol) TIM9 - ATMCP-RTSP May 2002.
Aerospace Division Anastasia Project Airborne Communication and Navigation Satellite Technologies And Techniques in a System Integrated Approach Presentation.
ANASTASIA Presentation to the NexSat Steering Group 6th meeting Jean-Yves CATROS EUROCONTROL Brussels 2005 May, 31.
Service Technique de la Navigation Aérienne NexSAT: Mission Hypothesis 20 may, 2003 STNA/31 ATM issues at horizon 2015 over ECAC Capacity: - VHF spectrum.
CARE/ASAS Activity 2 Follow-up: Validation Framework Dissemination Forum Isdefe Ingeniería de Sistemas CARE/ASAS ACTIVITY 2 FOLLOW-UP: VALIDATION.
The EMERALD RTD Plan and the ASAS Validation Framework R P (Bill) Booth 10 October 2002.
One Sky for Europe EUROCONTROL © 2002 European Organisation for the Safety of Air Navigation (EUROCONTROL) Page 1 FAA/Eurocontrol Technical Interchange.
0 - 0.
GROUND BASED AUGMENTATION SYSTEM System Overview Christophe DEHAYNAIN Direction Générale de l’Aviation Civile FRANCE.
ATN 99 Service Technique de la Navigation Aérienne 1 ATN Activities & Plans ATN in FRANCE FOR SAFETY REASONS MAIN FUTURE DATA/LINK ATSC WILL BE ATN.
ACI/GM/3011/1.0 ACI's Portable ATN Software Products & Services Technology for next-generation aviation data communication… Presented by Forrest Colliver.
The Future of PETAL Technology
PETAL A major step Towards Cooperative Air Traffic Services Patrice BEHIER Manager of the Air/ground Co operative ATS Programme Directorate Infrastructure,
© DLR, Institute of Flight Guidance ASAS Thematic Network 2 nd Workshop 6-8 October 2003 – Malmö Session 1 – ATSA Application Track Bernhard Czerlitzki.
Page 1STNApresentation of data-link activities DATA-LINK IMPLEMENTATION IN FRANCE Initial data-link services with ACARS - Departure Clearance, ATIS - CPDLC.
VHF Digital Link Mode 2 Deployment Strategy Vic Nagowski
H.V. SUDARSHAN H.V. SUDARSHAN International Civil Aviation Organization International Civil Aviation Organization Global Air Navigation System ~Interoperability.
Mission Trajectory Step 1 From planning to deployment.
AIM Operational Concept
C ENTRE D'ETUDES DE LA NAVIGATION AERIENNE ASAS-TN, 2nd workshop - Malmö 6 ~ 8 october 2003page 1 Electronic separation Clearance Enabling the Crossing.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-80/PIA-1 Improved Airport Operations through Airport-CDM SIP/ASBU/2012.
Workshop on preparations for ANConf/12 − ASBU methodology
International Civil Aviation Organization Trajectory-Based Operations(TBO) Saulo Da Silva SIP/ASBU/Bangkok/2012-WP/25 Workshop on preparations for ANConf/12.
Airport Collaborative Decision Making (A-CDM) Saulo Da Silva
Test B, 100 Subtraction Facts
ATN ‘99, London, 23 September 1999 David Russell ATS Market Manager, SITA AIRCOM SITA AIRCOM Data Link Service.
Military Use of Data Link Phil Platt ATN2001, IEE, London
Air-Ground Data Link - DFS Strategy
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-40/PIA-4 Improved Safety and Efficiency through the initial application.
Integrated information and telecommunications solutions AIRCOM Implementation VHF Digital Link Presented by Philip Clinch to ATN 2001 Conference 19 September.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-80/PIA-1 Improved Airport Operations through Airport-CDM SIP/2012/ASBU/Nairobi.
FAA Controller Pilot Data Link Communications Program ATN ‘99 London, England James H. Williams September 22, 1999.
The ATN Avionics Vendors View. ATN2001 Sept 2001; p.2 PETAL-II Avionics.
ATN Subnetwork Implementation:
Presented by Philip Clinch on 27 September 2000 at ATN 2000 Aeronautical Telecommunications Services.
Direction générale de l’Aviation civile centre d’Études de la navigation aérienne First ASAS thematic network workshop The user’s expectations and concerns.
Page 1 FAA Future Air/Ground Communications System Architecture James Williams Integrated Product Team Lead Communications Systems ATN September.
Federal Aviation Administration Data Communications Program FAA Prototype & Validation Activities Presented to:Data Comm Implementation Team By:Craig Morris.
LINK EEC Test Facility - ATN 2003 London 1 LINK Test Facility Overview Located at EEC Bretigny - France In support to LINK EATMP project.
ESA Iris Programme: status
Workshop on preparations for ANConf/12 − ASBU methodology
ATN Air-Ground Subnetworks
Ground based ATN Router Requirements
Presented at ICAO ACP WG-I By Robin Hughes
ATN Subnetwork Implementation:
Presentation transcript:

1 C ENTRE D'ETUDES DE LA NAVIGATION AERIENNE PHARE Aeronautical Telecommunication Network: PATN By Gérard Mittaux-Biron PATN Project Leader CENA

2 What is PATN ? l PATN is an implementation of the ATN that supported data-link communications for the 3rd PHARE Demonstration l PATN is a collaborative work, carried out by: l CENA in France, l DERA/NATS in the United Kingdom, l DLR in Germany, l EEC for Eurocontrol, l NLR in the Netherlands.

3 PATN Infrastructure: Inter- connection of ATN routers SITA X.25 Network Transpac X.25 Network

4 SITA X.25 Network Transpac X.25 Network PATN Infrastructure: Inter- connection of ATN routers

5 PATN Infrastructure: The end-systems SITA X.25 Network Transpac X.25 Network

6 Data-Link Services supported by PATN l Downlinking of Aircraft Parameters (DAP) l Frequency Change (FC) l Position Reporting (PR) l Trajectory Negotiation (TN)

7 Main Phases of the PATN Project l PATN in stand-by during the external development of the ATN Router by the EURATN project l Development of ATN Upper-Layers l Development of PATN Application Service Elements l Deployment of the PATN infrastructure: l Routers l PATN end systems l Integration in the air and ground platforms of the partners

8 Technical Choices for PATN l Compliance with International Civil Aviation Organisation (ICAO) standards for the Aeronautical Telecommunication Network whenever applicable l Aeronautical Mobile Satellite Services (AMSS) retained as the mobile subnetwork for air- ground communications

9 PATN Approach to Developments l Use of the EURATN router l Use of commercial off-the-shelf industrial products l ATN Upper-Layers l ICAO Standard ATN application: l Controller-Pilot Data-Link Communications l PHARE-Specific applications: l Downlinking of Aircraft Parameters ; Position Reporting ; Trajectory Negotiation l Access to the mobile subnetwork: l Interface between AMSS avionics and PATN workstations

10 PATN Spin-Offs l ATN Validation l AATMS project with the involvment of DERA and NLR l CHARME project for CENA

11 ATN Validation l First prototype implementation of ATN upper-layers communication services l Agreement between PHARE and an industrial partner: l The PATN upper-layers were re-engineered as an industrial product l PATN partners are entitled free source and binary licences l Free maintenance on the ATN upper-layers product l First deployment of a full-stack ATN infrastructure with air and ground components l Kernel of an ATN infrastructure for the PATN partners

12 AATMS Project l Validation of advanced Flight Management Systems l Implementation of a data-link infrastructure: l Adapted ATN based on PATN l Connection of: l DERA BAC 1-11 experimental aircraft l NLR Cessna Citation experimental aircraft l AATMS ground infrastructure l Transparently « switchable » access to: l Aeronautical Mobile Satellite Services (AMSS) l VHF Digital Link (VDL) mode 2

13 CHARME Project l Experimental ATN platform of the French DGAC l Support of data-link experimentations, such as: l EOLIA (European pre-operational data-link application) l COCLICO (internal CENA project on the co-operation of collaborative tools and data-link for the control) l Contribution to the validation of the ICAO standards for the ATN: l Future data-link applications l ATN Security & System Management l Connectionless ATN services

14 Existing PATN Enhancements l For AATMS: l access to VDL mode 2 l Automatic Dependent Surveillance (ADS) application l For CHARME: l Automatic Dependent Surveillance (ADS) application and ADS Report Forwarding l Flight Information Services (FIS) application l Context Management application

15 Experimental Results l Requirements per aircraft for the PD/3 scenario: l 100 bytes every 10 seconds for Position Reporting l up to 3000 bytes for a Trajectory Negotiation l around 100 bytes per clearance Good behaviour of loopback configurations of upper-layers used for the simulated air-traffic l Good behaviour of loopback configurations of ATN upper- layers used for the simulated air-traffic l Problems with the reliability of the AMSS for data-link communications with the actual aircraft l Better performances were stated by AATMS with VDL mode 2

16 Conclusion l PATN provided the realistic data-link infrastructure required for PD/3 l PATN contributed to the validation of the ATN protocol suite l The quality of service provided by the mobile subnetwork is critical for the perceived quality of ATN services: AMSS did not perform as expected at the time of PD/3 l The PATN components and infrastructure can be successfully built-upon by the partners

17 C ENTRE D'ETUDES DE LA NAVIGATION AERIENNE PHARE Aeronautical Telecommunication Network: PATN By Gérard Mittaux-Biron PATN Project Leader CENA next