1 Airborne Programme by E. Bailey, Airborne Project Leader EUROCONTROL.

Slides:



Advertisements
Similar presentations
SIP/2012/ASBU/Nairobi-WP/19
Advertisements

Global ATM Operational Concept
A PERFORMANCE BASED GLOBAL AIR NAVIGATION SYSTEM: PART II
Jeffrey T. Williams Manager, RNAV & RNP Group Air Traffic Organization
Blocks 2 & 3 Overview Samuli Vuokila Air Navigation Commissioner
1 PHARE Achievements Dr. H. Schröter PHARE Programme Manager EUROCONTROL version 1.1,
1 Air-Ground Integration Ed Bailey, Airborne Project Leader & Ian Wilson, PATs Project Leader.
1 PHARE Operational Scenarios J-P. Nicolaon, Operational Task Force Chairman EUROCONTROL Experimental Centre.
1 PHARE Advanced Tools (PATs) by I. Wilson, PATs Project Leader EUROCONTROLby EUROCONTROL.
1 From PHARE to ATC A. Vink Domain Leader ATC, EUROCONTROL.
Ground Human Machine Interface (GHMI): trends and the future
1 PHARE Demonstrations Overview of Results Marc Bisiaux PD/3 Project Leader Eurocontrol Experimental Centre.
1 Common Modular Simulator (CMS) : a PHARE system integration environment by J-R. Velten, CMS Project Leader CENA - ESV
1 PHARE and Reality by Wolfgang Philipp Senior Director EATMP EUROCONTROL.
1 Measurements & Validation R G Stamp Head of Department of ATM Research National Air Traffic Services Ltd, UK.
1 The PHARE Concept and Scenarios by Job Brüggen Head Air Transport Division National Aerospace Laboratory, NLR.
1 Results - Experience of Participating Air Traffic Controller By T. Symmans EUROCONTROL.
1 Managed Airspace or Free Flight by Steve Zerkowitz Assistant Director Infrastructure Europe IATA.
7 tasks identified Flight Arrival Interaction Detection Resolution Planning Resolution Implementation Monitoring Other Trajectory Changes Co-ordination.
1 The role of human in ATM automation: a key issue Alain Printemps head of DNA/CENA.
1 C ENTRE D'ETUDES DE LA NAVIGATION AERIENNE PHARE Aeronautical Telecommunication Network: PATN By Gérard Mittaux-Biron PATN Project Leader CENA.
Total Airport Management CARE Innovative Study
Introduction ATMCP and Performance Dominique Colin de Verdière (CENA) Bernard Miaillier (Eurocontrol) TIM9 - ATMCP-RTSP May 2002.
Conflict Detection and Resolution
1 4th FAA - EUROCONTROL AP6 Technical Interchange Meeting (TIM -4) Ground-based Decision Support for Conflict Detection and Resolution.
CARE/ASAS Activity 2 Follow-up: Validation Framework Dissemination Forum Isdefe Ingeniería de Sistemas CARE/ASAS ACTIVITY 2 FOLLOW-UP: VALIDATION.
FAA/Eurocontrol TIM 9 on Performance Metrics – INTEGRA Rod Gingell 16 May 2002.
The EMERALD RTD Plan and the ASAS Validation Framework R P (Bill) Booth 10 October 2002.
One Sky for Europe EUROCONTROL © 2002 European Organisation for the Safety of Air Navigation (EUROCONTROL) Page 1 FAA/Eurocontrol Technical Interchange.
CARE-INO ANIMS: Animation and Sound in ATC Human Machine Interfaces December 6, 2005 Célin e Schlienger In t uiLab, t uilab.com t uilab.com.
Page 1 CARE/ASAS Activity 3: ASM workshop Brétigny, 19 December 2001 Autonomous Aircraft OSED CARE-ASAS Activity 3: ASM Autonomous Aircraft OSED.
TIM 8 and Action Plan 6 Colin Meckiff, Experimental Center Tom Proeschel, FAA Hdqtrs 30 October 2001.
Using CNS/ATM to Dramatically Improve Gate-to-Gate Operations Captain Bob Hilb UPS Advanced Flight Systems October 8, 2007.
PETAL A major step Towards Cooperative Air Traffic Services Patrice BEHIER Manager of the Air/ground Co operative ATS Programme Directorate Infrastructure,
Nationaal Lucht- en Ruimtevaartlaboratorium National Aerospace Laboratory NLR AI Planning, Waiting for the Results? H.H. Hesselink R.R.
Mission Trajectory Step 1 From planning to deployment.
PBN ICAO HQ Activities Overview
AIM Operational Concept
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-80/PIA-1 Improved Airport Operations through Airport-CDM SIP/ASBU/2012.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-20/PIA-4 Improved Flexibility and Efficiency in Departure Profiles.
Workshop on preparations for ANConf/12 − ASBU methodology
International Civil Aviation Organization Trajectory-Based Operations(TBO) Saulo Da Silva SIP/ASBU/Bangkok/2012-WP/25 Workshop on preparations for ANConf/12.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-15/PIA 1 Improve Traffic Flow Through Runway Sequencing (AMAN/DMAN)
Traffic Management and FUA integration
Presented to: REACT Workshop By: Jay Merkle Date:25 June 2008 Federal Aviation Administration High Density Airport Time- based RNAV/RNP NextGen/JPDO Demonstrations.
SC227 – SC214 ISRA – Datalink Interface. PBN Manual, Part A, Chapter On-board performance monitoring and alerting On-board performance.
The Next Generation Air Transportation System “The Near Term and Beyond” Presented by Charles Leader, Director Joint Planning and Development Office.
NexGen ATM System A Perspective National Workshop on Aviation Software Systems: Design for Certifiably Dependable Systems October 5-6, 2006 Presented by.
CIVIL AVIATION BUREAU OF JAPAN Long term vision for Air Traffic Systems CARATS (Collaborative Actions for Renovation of Air Traffic Systems) CP01 /Ipxx.
Gate-to-Gate Project: Implementing Sequencing, Merging, and Spacing Captain Bob Hilb September 11, 2006.
. Center TRACON Automation System (CTAS) Traffic Management Advisor (TMA) Transportation authorities around the globe are working to keep air traffic moving.
3 – 4 September 2015 Delhi, India Piyawut Tantimekabut (Toon)
Distributed Multi-Nodal ATFM Operational Trial
1 Call Identifier : FP TREN-3 Thematic Priority 1.4 Aeronautics and Space ERASMUS project Project overview Aeronautical Days - Vienna June 2006 En.
- Session 4: Interoperation José M. Roca Air/Ground Cooperative ATS Programme Eurocontrol.
Direction générale de l’Aviation civile centre d’Études de la navigation aérienne First ASAS thematic network workshop The user’s expectations and concerns.
EUROCONTROL European Organisation for the Safety of Air Navigation.
Guidance and Control Programs at Honeywell Sanjay Parthasarathy Honeywell Aerospace Advanced Technology October 11, 2006
DeSIRE Workshop, Pisa, 25-26/11/2002 1/7 A Case Study in Air Traffic Control Alberto Pasquini Deep Blue Srl.
Programme Status ECTL AAB February FACTS  A mature approach: 2500 contributors Release process organises the delivery cycle ATM Engineering:
1 EUROCONTROL S TRATEGIES FOR The ATM Strategy for the Years As from MATSE/6 decision (Jan. 2000): To cater for forecast increase in demand.
FF-ICE A CONCEPT TO SUPPORT THE ATM SYSTEM OF THE FUTURE
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
SIP/2012/ASBU/Nairobi-WP/19
Blocks 2 & 3 Overview Samuli Vuokila Air Navigation Commissioner
Ground System implication for ASAS implementation
Trajectory-Based Operations(TBO) Saulo Da Silva
Long term vision for Air Traffic Systems CARATS
Presentation transcript:

1 Airborne Programme by E. Bailey, Airborne Project Leader EUROCONTROL

2 Projects l Experimental 4D Flight Management System (EFMS) l Airborne Human Machine Interface (AHMI) l Air/Ground Integration via Data Link

3 EFMS & AHMI Functionality l EFMS l Prediction of 4D trajectories l Trajectory negotiation with ATC over data link l 4D Guidance l Support advanced Airborne HMI l AHMI l Interactive Navigation Display l Graphical editing of trajectories

4 Project History l Activities of the Research Establishments l Arrival Managers - CENA, DLR l 4D Descents - DERA l Automated ATC - EEC l Conflict Detection - NLR l Advanced Cockpit Displays - DERA, NLR l GARTEUR Concept l Requirement for Experimental 4D FMS l Birth of PHARE

5 Difficult points to be resolved 1. Generic FMS & AHMI

6 Difficult points to be resolved 2. Software Engineering Aeronautical engineers software engineers Aeronautical engineers software engineers l Dispersed development sites l Software development tools l Common programming language l Need for software integration team Software engineers aeronautical engineers Software engineers aeronautical engineers

7 Difficult points to be resolved 3. Integrated ATM ? l Lack of system design l Air, Ground and Comms. projects developed independently l Lack of understanding between players l Air, Ground and Comms. developers incognisant of each others operational requirements, procedures and capabilities

8 Difficult points to be resolved 4. Data Link l Requirement l Flexible, high bandwidth data link l Available l Rigid data structure and protocols + complex data structures for air and ground interfaces + low bandwidth data link = poor performance l Essential to minimise the amount of data transmitted

9 Success ! l Demonstrated concept of an Air/Ground Integrated ATM system l Demonstrated capability of aircraft to predict, negotiate and fly 4D trajectories l Demonstrated Advanced AHMI concepts l Spin-off to other programmes l FREER Flight l AFMS/AATMS l Avenue

10 Open issues for the future l Data Link Bandwidth l Current applications for D/L require low/medium bandwidth l Need to define user requirements for the longer term l Benefits of 4D Navigation ? l Time control : Air or Ground ? l Increased capacity and reduced delays ? l Cost? l Implementation Plans l 5 year development + 7 year notification l 2012 earliest

11 How further work will be undertaken. l Develop close links between Navigation, Communication and ATC domains l CBA l Fast time simulations l Real time simulations l Safety studies l Pre-operational Trials l Arrival & Departure Managers l RNAV procedures in TMA l ARINC 702A developments

12 Acknowledgements l Scientists/engineers of the R&D Establishments l In Particular l Ronald Verhoeven, NLR - AHMI Project Manager l Reg Harlow, DERA - Major contributor l Bob Maddock, Eurocontrol - EFMS Production Manager l Roland Rawlings, Eurocontrol - Father of the EFMS Project and Airborne Programme

13 Airborne Programme by E. Bailey, Airborne Project Leader EUROCONTROL next