2015 RTP – Study Scope of Short Circuit Analysis RPG Meeting May 19, 2015 1.

Slides:



Advertisements
Similar presentations
Summary of Second Draft of the NERC Standard PRC Disturbance Monitoring and Reporting JSIS Meeting August 10, 2010 Salt Lake City, UT.
Advertisements

NERC Footnote b / 12 – Load Loss
RPG: September 24, Approach for ERCOT Independent Review of the 2013 Houston Import Project Jeff Billo, Manager, Transmission Planning September.
STATUS OF BULK ELECTRIC SYSTEM DEFINITION PROJECT
New Energy Horizons Opportunities and Challenges Fault Current Contributions from Wind Plants Dean Miller PacifiCorp July 25,
Presented to PGDTF February 11, 2015
Project Definition of Bulk Electric System & Bulk Electric System Rules of Procedure Development Presenter: Peter Heidrich, FRCC – BES Drafting.
Recent NERC Standards Activities RSC – Jan. 5, 2011 NSRS Update Date Meeting Title (optional)
2015 RTP Update January, 2015.
KURTEN SWITCH PROJECT (BRYAN/ COLLEGE STATION AREA UPGRADES) Technical Advisory Committee December 1, 2005 Transmission Services.
Valley Import Overview Jeff Billo Regional Planning Group Meeting July 22, 2014 Preliminary1.
ERCOT PUBLIC 10/21/ RTP Scope and Process Review October 21, 2014.
RTP Update RPG Meeting July 21, RTP update  Reliability analysis for the contingencies where load shed is not allowed is complete.
PLWG Report to ROS July 9, PGRRs needing vote PGRR043 – FIS Scoping Amendment – PGRR043 moves the Subsynchronous Resonance (SSR) Study out of the.
FRCC Seasonal Transmission Assessment & Operational Seasonal Study Winter 2012.
ERCOT SOL Methodology for the Planning and Operations Horizons Stephen Solis 2014 OTS 1.
2006 Reliability Study Scope Name Date. DRAFT 2 Purpose of Study Assess the PEC and Duke transmission systems’ reliability Develop a single reliability.
December 7, 2012 ERCOT Planning Horizon SOL Methodology Update Jeff Billo RPG.
POWER SYSTEM PROTECTION
ECE 530 – Analysis Techniques for Large-Scale Electrical Systems
RPG Meeting Five Year Plan Extension Brad Schwarz.
1. 2 NERC Bulk Electric System (BES) Definition (NERC Glossary of Terms Used in Reliability Standards) FERC Order 693 FRCC Handbook Review Task Force.
SPS policy – Information Presentation Presentation to ROS June 16, 2004.
Project System Protection Coordination Requirement revisions to PRC (ii) Texas Reliability Entity NERC Standards Reliability Subcommittee.
ERCOT PUBLIC 5/20/ RTP Inputs and Assumptions May 20, 2014.
SPWG SHORT CIRCUIT CASE BUILDING AND DEVELOPMENT July 17, 2014 Qiuli Yu and Jay Teixeira ERCOT.
ERCOT PUBLIC 4/21/ RTP: Cascade Analysis April 21, 2015.
NERC Project S ystem Protection Coordination - PRC-027​ Presentation to the NSRS Conference Call August 17, 2015 Sam Francis Oncor Electric Delivery.
November 12, 2010 Regional Planning Group Long-Term System Assessment Project Update Warren Lasher Manager, Long-Term Planning and Policy Jonathan Rose.
– 1Texas Nodal Texas Nodal Electrical Buses – 2Texas Nodal Electrical Bus Definition as Proposed in NPRR 63 Electrical Bus A physical transmission element.
2008 Annual Five Year Plan Update 2 10/12/2007 Regional Planning: Jay Teixeira, Harry Liu, Brad Schwarz, Jeff Billo, Chris Ngai.
NERC Project S ystem Protection Coordination - PRC-027​ Presentation to the NSRS Conference Call April 20, 2015 Sam Francis Oncor Electric Delivery.
By Tony Hudson SSWG Chairman.  12DSA cases were recently completed per the procedures approved by ROS in March  The purpose of this presentation.
May 11, 2012 RPG meeting YTP Scope and Process – RPG Comments.
Lecture II Objective: Representation of sequence components
Operating Guide and Planning Guide Revision Requests Blake Williams, ROS Chair September 13, 2012.
Economic Analysis Proposed Scope ERCOT RPG Meeting September 17, 2010.
October 29, 2012 RARF Workshop 2 Introduction to ERCOT Modeling Process Jay Teixeira Manager, Model Administration.
ERCOT ROS Planning Working Group (PLWG) Scope Approved at ROS Meeting.
ERCOT PUBLIC November RPG Meeting RTP – Study Scope November 20, 2015.
RPG: September 24, Long-Term System Assessment Introduction Jeff Billo, Manager, Transmission Planning September 2013 Regional Planning Group.
OPSTF – Issue 7 Long-term unavailability of autotransformers.
PLWG Report to ROS September 4, PGRR039 PGRR requires Interconnecting Entities (IEs) to provide information for ERCOT’s resource adequacy reports,
POWER SYSTEM PLANNING CHARTER AND PROCESSES Presentation to TAC May 6, 2004 Transmission Services Ken Donohoo, Manager of System Planning Dan Woodfin,
ERCOT PUBLIC 3/25/ RTP Inputs and Assumptions March 25, 2014.
Transition Plan Network Operations Model Change Requests 5/26/2010.
Current Nodal OS Design 1.The NMMS database will have an OWNER and an OPERATOR designation for each piece of equipment in the model. The OWNER and OPERATOR.
2006 Reliability Study James Manning Bryan Guy May 12, 2006.
ERCOT PUBLIC LTSA Introduction. ERCOT PUBLIC 2 Outline  Background  2016 LTSA Process  2016 Scenario Development Process  2016 LTSA Schedule.
ELEN 3441 Fundamentals of Power Engineering Spring Instructor: Dr. Gleb V. Tcheslavski Contact: Office Hours:
DRAFT – FOR DISCUSSION PURPOSES ONLY © 2013 New York Independent System Operator, Inc. All Rights Reserved. EIPC Roll-Up Powerflow Model Zach Smith Director,
1 ERCOT 2015 West Texas Study November 18, 2014 Jeff Billo.
4/16/2010 Regional Planning Group Meeting Long-Term Planning Study of the ERCOT Interconnection Warren Lasher Manager, System Assessment.
1 NPCC – A-2 Dr. Mayer Sasson Transmission Planning Consolidated Edison of New York June 1, 2006 Presented to the NYSRC-RRS.
Power System Protective Relaying-Part One
Texas Nodal Electrical Buses and Outage Scheduling.
Nodal Planning Go Live Austin, TX February 3, 2011
Information Needed By All Market Participants To Facilitate Transmission Congestion Studies In ERCOT Presented to the ERCOT ROS by Shannon Caraway, P.E.
Reliability Must Run Workshop RMR Study Process May 24, 2016.
Freeport Area Master Plan Project -
Protection of Power Systems
Planning Geomagnetic Disturbance Task Force (PGDTF) Meeting Material
2016 RTP Update November, 2016 RPG Meeting.
Barrilla Junction Area Transmission Improvements Project
Status Update for Reliability/Market Power Mitigation Assessment
I-5 Corridor Reinforcement Project
POWER SYSTEM ANALYSIS INTRODUCTION.
Power System Protective Relaying-Part One
Excelsior Energy’s Mesaba Energy Project
Prepared by: Ismael K. Saeed
Presentation transcript:

2015 RTP – Study Scope of Short Circuit Analysis RPG Meeting May 19,

Outline  Introduction  Study Scope  Next Step 2

Introduction  Governing Standards  NERC Standard TPL (Transmission System Planning Performance Requirements)  Purpose of Short Circuit Analysis  Determine the magnitude of short circuit currents in the future systems within the near-term planning horizon  Identify circuit breakers that cannot interrupt short circuit currents  Develop corrective action plans 3

Study Scope  Study cases  ERCOT will conduct short circuit analysis using the 2015 RTP cases developed for the near-term planning horizon, i.e., 2018 and 2020 summer peak cases.  Methodology and Assumptions  Fault types to be tested at all BES buses (typically, 100 kV and above) including point of interconnection (POI) 3-phase to ground fault Single-line to ground fault  Transmission solutions developed in the 2015 RTP final cases including reliability and economic projects will be considered in the study  All generators in each case will be modeled in-service, except those determined in the 2015 RTP scope (e.g. mothballed units as documented in the CDR report) 4

Study Scope  Sequence impedances of facilities are needed to perform the short circuit analysis Transmission o Positive sequence data will be based on the RTP cases. Negative sequence data are identical to Positive sequence data o For zero sequence impedances, use the database of SPWG.  If zero sequence impedance of a transmission line is not available, ERCOT will use a default value (typically, 3 times greater than positive sequence impedance)  If zero sequence impedance of a transformer is not available, ERCOT will either use the data of similar transformer in the system, or contact TPs to obtain sequence impedances 5

Study Scope Generation o If the generator exists in both RTP and SPWG, sequence data from SPWG will be used o If the generator exists in RTP but NOT in SPWG, ERCOT will use either RARF database or data of a generator with the similar size and type Load level will be consistent with RTP cases  Tools to be used: PSS/E or Power World software  Consistent with SPWG methodology, the following options will be used to perform fault analysis. Flat, CL (Classical flat start) Shunt Elements: + Sequence 0 Tap ratios set to 1.0 Line charging set to 0 6

Study Scope 7  Deliverables  Results of the three-phase and single-line to ground fault current along with source impedance associated with each fault  Request TPs and GOs to review the results and to provide a list of over-dutied devices and corrective action plans  High level schedule  ERCOT plans to post study results on MIS around mid August 2015  ERCOT plans to request TPs and GOs to provide a list of over- dutied devices and corrective action plans by mid September 2015

Next Step  Seek comments and feedback from stakeholders regarding the study scope  Finalize the study scope for 2015 RTP 8