Dakar 17,18 Novembre 2003 EGNOS: Institutional aspects.

Slides:



Advertisements
Similar presentations
SAFETY MANAGEMENT WORKSHOP
Advertisements

© Integra A/S SAFETY MANAGEMENT WORKSHOP Karachi - January 2006 PRESENTERS: PETER THORSEN STEFAN REIB.
Integra Consult A/S November 2005Karachi, Pakistan Safety Assessment Projects Karachi, Pakistan Integra Consult A/S.
- 1 - EPP-ED Public Hearing : 12 June 2008 The importance of GNSS (Galileo/EGNOS) Views from the forthcoming Council Presidency By Raymond ROSSO French.
European Commission Enterprise and Industry European Commission Enterprise and Industry Working Party on Euro-Mediterranean Industrial Cooperation The.
Unmanned Aircraft Systems EUROCONTROL ATM Integration
ICAO Seminar on Aeronautical spectrum management (Cairo, 7 – 17 June 2006) SAFIRE Spectrum and Frequency Information Resource (presented by Eurocontrol)
EUROCONTROL Experimental Centre EUROCONTROL Navigation Domain The Data Collection Network: EGNOS revealed GNSS 2004 – Rotterdam, The Netherlands Santiago.
Phillipe Renaud and Nikos Fistas
1 THE POTENTIALS OF THE ATM STRATEGY FOR YEARS by Val Eggers.
CRDS Budapest First ATM R&D Workshop - 27 and One Sky for Europe EUROCONTROL CONCLUSIONS A momentum has been created A small step towards.
Service Technique de la Navigation Aérienne NexSAT: Institutional aspects 20 may, 2003 STNA/31 The EGNOS example: the issue The good example: The Tripartite.
8 June 04NexSAT Steering Group Fourth Meeting 1 SATELLITE DATA LINK SYSTEM (SDLS) TOWARDS A DEDICATED MOBILE SATELLITE COMMUNICATION SYSTEM FOR A/G SAFETY.
Service Technique de la Navigation Aérienne NexSAT: Mission Hypothesis 20 may, 2003 STNA/31 ATM issues at horizon 2015 over ECAC Capacity: - VHF spectrum.
17th February 2004: Slide 1 DG Transport and Energy OATA Workshop 17th February 2004 European Commission OATA and the Single European Sky.
One Sky for Europe EUROCONTROL © 2002 European Organisation for the Safety of Air Navigation (EUROCONTROL) Page 1 FAA/Eurocontrol Technical Interchange.
1 Performance indicators, targets, steering Technical Interchange meeting Toulouse, May 2002 Xavier FRON Head Performance Review Unit.
ACG Workshop, 17 Feb 2004 – OATA project The European ATM Strategy and the need for a Target Architecture ACG Workshop, 17 February 2004 Bernard.
Architecture and institutional issues for AeroMACS.
EGNOS: a satellite navigation system for Europe, and an opportunity for Africa! Michel Bosco Head, Galileo and EGNOS Applications and International Cooperation.
Global Air Navigation System ~ Planning Mechanisms ~ H.V. SUDARSHAN H.V. SUDARSHAN International Civil Aviation Organization International Civil Aviation.
Directorate-General for Energy and Transport Information and Communication A European Community Contribution to World Aviation Safety Improvement Singapore.
The European Organisation for the Safety of Air Navigation Civil-Military Workshop Operational requirements for ASM systems Giuseppe Acampora EUROCONTROL.
Single European Sky 1 CAeM Technical Conference Single European Sky and the Impacts for Aeronautical Met Services Geneva 21 November 2006.
Peter Davies Licensing Adviser. The Ending of the Individual Licensing Regime All individual telecommunications licenses cease on 25 July 2003 Replaced.
E-OCVM (Version 2) Explained Episode 3 - CAATS II Final Dissemination Event Alistair Jackson EUROCONTROL Episode 3 Brussels, 13 & 14 Oct 2009.
Transport Revised Performance and Charging Regulations Key changes.
F. Schubert / page 1 Functional Airspace Blocks - Can they inspire the ANS World? Air Transport, Air & Space Law and Regulation International.
Objective ATC 02.6 ESSIP Plan 2014 Ingrid FEIJT DSS/PEPR
Regional Cooperation Activity JOINT MEETING OF THE ADVISORY COMMITTEE AND THE EXECUTIVE BOARD Nicosia 17 Jan 2014.
Galileo: programme status and research activities
3 – 4 September 2015 Delhi, India Piyawut Tantimekabut (Toon)
Can our ATM systems cope?
SAFETY REGULATION COMMISSION SAFETY REGULATION COMMISSION Harmonisation of ATM Safety Regulation & ESARRs SAFETY REGULATION COMMISSION SAFETY REGULATION.
Objective ATC 02.7 ESSIP Plan 2014 Ingrid FEIJT DSS/PEPR
WORKSHOP, Nicosia 2-3rd July 2008 “Extension of SAFETY & QUALITY Common Requirements to the EMAC States” Item 3 : Regulatory Context Peter Stastny EUROCONTROL.
1 SBAS Implementation in the Regions of ACAC and ASECNA FP7-GALILEO / FP7-GALILEO Project with Community research funding WP2- Service.
1 SBAS Implementation in the Regions of ACAC and ASECNA FP7-GALILEO / FP7-GALILEO Project with Community research funding WP2- Service.
Nigel Makins EUROCONTROL
Annual Conference October 2011 Water Services Training Group 15 th Annual Conference Water Services in Ireland – Organisational modernisation and new challenges.
Safety Management in Europe European Organisation for the Safety of Air Navigation Dr. Erik Merckx EUROCONTROL Directorate ATM Programmes Head of Business.
ESARR 5 and language proficiency for ATCOs European Organisation for the Safety of Air Navigation ICAO – EUROCONTROL EUROPEAN SEMINAR ON LANGUAGE PROFICIENCY.
Requirements - background
Training Standards & Guidelines Moscow September 2004
Ensuring the Safety of Future Developments
Objective ITY-FMTP - Apply a common flight message transfer protocol (FMTP) ESSIP Plan 2015 Oscar ALFARO DPS/PEPR
1 From Planning to Implementation. 2 Aviation Needs ECIP Institutional Arrangements EATM Programmes Implementation & Operations Europe wide Planning LCIPs.
ATOS in Period 2 (WP4 leader) Technical Review Period 2 Michel van Adrichem, Mick Symonds, Josep Martrat This document produced by Members of the Helix.
1(17/04/2007) Maurici Lucena CDTI Director General Presentation by Spain IX European Interparliamentary Space Conference Presentation by Spain IX European.
1 Galileo / EGNOS Status GNSS Regional Plan Workshop July 12 th Casablanca Morocco Dr. Cedric Seynat Technical Department European GNSS Supervisory.
MAK – EUROCONTROL WORKSHOP Moscow 1 -2 July 2004 Kenneth Eideberg Stakeholder Implementation Service EUROCONTROL European Organisation for the Safety of.
WORKSHOP ON COMMON REQUIREMENTS FOR SERVICE PROVISION  Introduction to SESIS Guidance Material  Gerald Amar, SESIS Project Manager European Organisation.
Information day on EUROCONTROL Guidance Material on the application of Common Requirements for Service Provision  Aeronautical Information Services Provider.
Information day on EUROCONTROL Guidance Material on the application of Common Requirements for Service Provision OVERVIEW OF THE SINGLE EUROPEAN SKY Roderick.
1 EU funding for sustainable energy. 2 Standardisation Ivan Konaktchiev Certification Engineer.
Module 02 Essential Requirements for ATCOs. Training Objectives  Appreciate the content of the essential requirements for ATCOs as described within EASA.
PAN European Network Services (PENS)
CEATS Central European Air Traffic Services
ICAO Seminar on Aeronautical spectrum management (Cairo, 7 – 17 June 2006) SAFIRE Spectrum and Frequency Information Resource (presented by Eurocontrol)
Juan Vázquez Sanz EUROCONTROL SRU
Ensuring the Safety of Future Developments
PRESENTATION OF MONTENEGRO
Objective ATC 02.7 ESSIP Plan 2013 Ingrid FEIJT DSS/EIPR
EGNOS: Institutional aspects
London 14 October 2015 Freek De Witte Head of Stakeholder Relations
ICAO Seminar on Aeronautical spectrum management (Cairo, 7 – 17 June 2006) SAFIRE Spectrum and Frequency Information Resource (presented by Eurocontrol)
International Federation of Air Traffic Safety Electronics Associations IFATSEA European Regional Meeting 2016 Update ICB by Robert Schneebauer 17.
Marine Strategy Framework Directive Competence Centre
Objective ATC 02.7 ESSIP Plan 2015 Ingrid FEIJT DPS/PEPR
Feedback on European Legislative Framework on ‘Drones’
Presentation transcript:

Dakar 17,18 Novembre 2003 EGNOS: Institutional aspects

EGNOS contributors & investors (ESA, EC, ATSP…) System Development ESA EGNOS Signal and Data Provider European ATS Providers European airspace users Certification Industry Sub system (MCC, RIMS,..) Operations & maintenance EGNOS framework for Europe Select Control Sub contract Service & ATC interface CNS/ATM Service Pay Safety Case Pay

System Development ESA EGNOS and ISA Signal and Data Provider ( European & African share holders) European & African ATS Providers European & African airspace users Certification Industry Sub system (MCC, RIMS,..) including new sites in Africa Operations & maintenance. Potential EGNOS & ISA framework (Europe & Africa): option 1 EGNOS & ISA contributors & investors EuropeanAfrican Control Select Service & ATC interface Pay CNS/ATM Service

System Development ESA European ATS Providers European airspace users Industry Potential EGNOS & ISA framework (Europe & Africa): option2 ISA provider : operations & maintenance for African sites African ATS Providers African airspace users Agreement EGNOS & ISA contributors & investors EuropeanAfrican Certification Control Select Pay CNS/ATM Service Service & ATC interface EGNOS Signal and Data Provider Pay Service & ATC interface CNS/ATM Service

Certification: a 2 steps approach System Safety Case ATS Service Providers Coordination for ECAC: Eurocontrol National Certification Authorities Approval Prepare Design, development, technical verification, operations & maintenance. ATS Safety Cases Guidance material Prepared by Eurocontrol

Service Provision scheme and charging mechanisms. OBJECTIVE: Implementation of the Service Level Agreements and the charging mechanism between ESDP, ECAC ATS Providers and final users ESDP European ATS Providers Airspace Users SLA (e.g.via Eurocontrol CRCO) CNS/ATM service ( including EGNOS)