FANS 1/A over Iridium (FOI)

Slides:



Advertisements
Similar presentations
1 Introduction to Safety Management April Objective The objective of this presentation is to highlight some of the basic elements of Safety Management.
Advertisements

Global ATM Operational Concept
Federal Aviation Administration GOLD Amendment Program By:Tom Kraft Date:8 February 2012 Presented to:SOCM/2 Seminar.
Federal Aviation Administration GOLD Introduction By:Tom Kraft Date:8 February 2012 Presented to:SOCM/2 Seminar GOLD.
Federal Aviation Administration Required Communication Performance (RCP) Date:26-30 March 2007 Presented to:ICAO Worldwide Symposium on Performance of.
Introduction to Required Communication Performance (RCP) and Required Surveillance Performance (RSP) Read Slide. SOCM/2 Christine Falk 8-10 February.
1 Marinus C. F. Heijl Acting Director Air Navigation Bureau ICAO 30 March 2007 SYMPOSIUM OUTCOMES AND THE WAY FORWARD.
Foreign Air Operator Validation & Surveillance
ICAO Performance Based Communication and Surveillance Workshop -- Closing Remarks Feb 2013 Paris, France.
Foreign Air Operator Validation & Surveillance Part I ~~ History.
Federal Aviation Administration Agenda Item 2.2: Post-Implementation Analysis of Data Link Performance Following Release 15 (R15) Ground Earth Station.
FANS (Future Air Navigation System) Flight Crew Procedures
Performance based communication and surveillance
Introduction to Navigation Specifications
2017/3/28 Hong Kong PBN implmentation ICAO GNSS Implementation Seminar/Workshop 26 March 2012 ICAO FPP fdsagsdfgsdgsdgasdfsadf 1.
Planning and implementation
ICAO was created in 1944 to promote the safe and orderly development of civil aviation in the world. A specialized agency of the United Nations, it sets.
Phillipe Renaud and Nikos Fistas
Introduction ATMCP and Performance Dominique Colin de Verdière (CENA) Bernard Miaillier (Eurocontrol) TIM9 - ATMCP-RTSP May 2002.
The EMERALD RTD Plan and the ASAS Validation Framework R P (Bill) Booth 10 October 2002.
Federal Aviation Administration International Flight Inspection Symposium June 24, 2008 James H. Washington Vice President, Acquisition and Business Services.
Presentation of the proposed Annex 19 – Safety Management
Global Operational Data Link Document (GOLD)
International Civil Aviation Organization SATELLITE DATA-LINK COMMUNICATION REQUIREMENTS AND ISSUES ICAO APAC Office 8 February, 2012.
Federal Aviation Administration Presented By: Dennis Addison, FAA Date: February 8, 2012 SOCM-2 Seminar Data Link Operations.
SOCM-2 Seminar Data Link Benefits Presented By: Dennis Addison, FAA
U.S. Turbulence Program Update
Federal Aviation Administration Performance Based Communication and Surveillance (PBCS) Data Link Operational Authorization Process Date:13-14 May 2013.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-80/PIA-1 Improved Airport Operations through Airport-CDM SIP/ASBU/2012.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-20/PIA-4 Improved Flexibility and Efficiency in Departure Profiles.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-86/PIA-3 Improved Access to Optimum Flight Levels through Climb/Descent.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-101/PIA-3 ACAS Improvements Workshop on preparations for ANConf/12.
Workshop on preparations for ANConf/12 − ASBU methodology
ATN ‘99, London, 23 September 1999 David Russell ATS Market Manager, SITA AIRCOM SITA AIRCOM Data Link Service.
Pan regional ICD for AIDC structure and status (SP/09)
Presented to: By: Date: Federal Aviation Administration Air Traffic Management (ATM) Issues 30 Nautical Mile (NM) Lateral / Longitudinal Distance-based.
Data-link Elements and Role of Stakeholders – Reflections of an ANSP
Performance-based Operations Aviation Rulemaking Committee (PARC)
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-40/PIA-4 Improved Safety and Efficiency through the initial application.
Interpreting RCP/RSP and Monitoring Results
Federal Aviation Administration Presented To: IPACG/39 Presented By: Dennis Addison, FAA Date: February 5-6, 2014 WP02: Timing Errors in Oakland OCA.
Federal Aviation Administration Performance-Based Communication and Surveillance (PBCS) Introductory remarks Date:13-14 May 2013 Presented to:ICAO Asia-Pacific.
PBCS Workshop Bangkok, Thailand, May, 2013
Presented to: By: Date: Federal Aviation Administration Transition to RNP 4/10 (MNPS to PBN) OSWG Gordy Rother and Kevin Kelley 10/8/2014 North Atlantic.
ICAO SARPS and Guidance Material
CNS/ATM Overview Aramco 4/21/2017 1:46 AM
Data Link Communications
Federal Aviation Administration PARC CWG Update Date:8-10 February 2012 Presented to:SOCM/2 By:Tom Kraft Arnold Oldach.
Federal Aviation Administration Performance-Based Communication and Surveillance (PBCS) Closing remarks Date:13-14 May 2013 Presented to:ICAO Asia-Pacific.
International Civil Aviation Organization May 2013, Bangkok 1 PBCS Workshop May 2013, Bangkok Introduction 1.
PARC CWG Update Presented to: SOCM/2 By: Tom Kraft
PBCS Workshop May 2013, Bangkok
Workshop on preparations for ANConf/12 − ASBU methodology
Performance-Based Communication and Surveillance (PBCS)
Derivation of RCP/RSP specifications
Required Communication Performance (RCP)
Workshop on preparations for ANConf/12 − ASBU methodology
Performance Based Communication and Surveillance (PBCS)
Workshop on preparations for ANConf/12 − ASBU methodology
Global Operational Data Link Document (GOLD)
GOLD GOLD Introduction Presented to: SOCM/2 Seminar
ICAO Performance Based Communication and Surveillance Workshop -- Closing Remarks Feb 2013 Paris, France.
Performance-Based Communication and Surveillance (PBCS)
Workshop on preparations for ANConf/12 − ASBU methodology
Interpreting RCP/RSP and Monitoring Results
Workshop on preparations for ANConf/12 − ASBU methodology
FANS 1/A over Iridium (FOI)
Oceanic and International Operations
Workshop on preparations for ANConf/12 − ASBU methodology
Oceanic and International Operations
Presentation transcript:

FANS 1/A over Iridium (FOI) Status Presented to: SOCM/2 By: Tom Kraft tom.kraft@faa.gov Date: 8-10 February 2012

Introduction Mar 08 – FOI project plan May-Jul 2010 – FOI operational evaluation 17 Sep 2010 – PARC submits FOI and Performance Based Concept Recommendations to FAA In June 2011, the FAA responded to the PARC, agreeing with the recommendations in the report

Why the spotlight on Iridium? Iridium promotes FANS 1/A expansion Lower cost solution than other alternatives Draws less power Lighter in weight Global coverage, including the Polar Region FANS 1/A enables Reduced ADS‑C-based separations More efficient operations Reduced CO2 emissions minimizing environmental impact Reduced effects of operational errors/pilot deviations Iridium enables applications – Passenger (APC) Company (AAC, AOC) FANS 1/A (ATS) FANS 1/A enables ATM benefits

PARC FOI & PBC recommendations PARC submitted letter to FAA in Sep 2010 “ RECOMMENDATION 1. Expedite the steps necessary to remove restrictions on current FOI operations to realize immediate gains in efficiency and safety benefits.” “ RECOMMENDATION 2. In the near and mid terms, plan for and implement a performance-based framework for RCP and surveillance performance specifications.” (See PARC CWG presentation for PBC update)

FAA responded in June 2011 “ With proven benefits in operational efficiency, environmental impact, and safety, the FAA has identified FANS 1/A as an enabler for NextGen. … The FAA agrees FOI will promote FANS 1/A expansion, and accepts FOI as a viable means for air traffic service (ATS) communications, particularly in accordance with performance specifications for reduced oceanic separations based on automatic dependent surveillance – contract (ADS­C).”

FOI planning and implementation Remove airspace restrictions – to apply reduced ADS-C-based separations to eligible FOI aircraft In Oakland Flight Information Region (FIR) FAA will advocate removal of any restrictions imposed by other air navigation service providers FAA has been and will continue to approve FOI installations and operations Design approval of FOI installations per FAA Advisory Circular (AC) 20­140A Data link operational authorizations via A056 Ops Spec per FAA AC 120­70B & FAA Order N8900.66

Potential for FOI growth in the NAT Region (1 of 2) Approximately 1,400 flights daily in the NAT, 48% fleet currently equipped with FANS 1/A CPDLC & ADS-C All aircraft shall operate FANS 1/A CPDLC & ADS-C (outside VHF data link coverage) a) from 7 February 2013, on specified tracks and flight levels within the NAT organized track system (OTS); and b) from 5 February 2015, in specified portions of NAT minimum navigation specifications (MNPS) airspace. Current thinking, initially No more than 2 specified tracks in the OTS, FL360 to FL390, inclusive No exemptions in the applicable airspace Beyond 2015 to be determined

Potential for FOI growth in the NAT Region (2 of 2) Other operational improvements being investigated in the NAT for implementation 2015 and beyond Transition Minimum Navigation Performance Specification (MNPS) to Performance-Based Navigation (PBN) NAT Required Communication Performance (RCP) and Required Surveillance Performance (RSP) Operations Implementation Plan (for Feb 2015) – applies to FANS 1/A Reduced (5-min) Longitudinal Separation Minimum (RLongSM) (in trials March 2011) – will require FANS 1/A Reduced (25 NM) Lateral Separation Minimum (RLatSM) – will require FANS 1/A

Potential for FOI growth Elsewhere Polar Region – FOI provides “true” global coverage PACOTS – FOI can increase equipage rates Increasing the number to opportunities to apply reduced separations when more aircraft are FANS 1/A capable

FOI recognition NAT SPG planning to formally acknowledge FANS 1/A over Iridium Short Burst Data and Inmarsat I3 Classic Aero as eligible for NAT data link operations Based on PARC CWG FOI Project and Report Expected to occur in June 2012 (NAT SPG/48) At IPACG, JCAB still trialing FOI, need more time However, similar to FAA systems, JCAB systems have no operational means to determine the type of media the aircraft is using for FANS 1/A operations in the Fukuoka FIR Reduced separations can be applied (or mis-applied) to FOI aircraft that indicate RNP4 in their flight plan

FANS 1/A aircraft definition GOLD definition of FANS 1/A aircraft  an aircraft with a data link system that has been certified in accordance with the requirements specified in RTCA DO­258A/ EUROCAE ED­100A (FANS 1/A INTEROP Standard), or previous version DO‑258A/ED‑100A includes provisions for use of VHF, satellite and HF sub-networks that are compatible with the ACARS network. it does not require or specify any specific sub-network(s) that an aircraft must use for FANS 1/A operations

Current FANS 1/A configurations Throughout the world, operators with FANS 1/A aircraft use CPDLC and ADS‑C services over a variety of subnetworks, including VHF (Mode 0/A and Mode 2), Inmarsat Classic Aero over the I3 and I4 satellites, Iridium SBD, and HFDL

FAA means of compliance (1 of 2) The FAA certifies FANS 1/A aircraft in accordance with AC 20‑140A The FAA authorizes operational use of data link, i.e. CPDLC and ADS-C, in accordance with AC 120‑70B and FAA Order 8900.1 For FANS 1/A aircraft, these FAA documents recognize DO‑258A/ED‑100A or previous version, as acceptable means of compliance consistent with the GOLD definition

FAA means of compliance (2 of 2) Further, these FAA ACs recognize a number of sub-networks and associated standards as acceptable means of compliance for FANS 1/A aircraft Means of compliance for Iridium’s SBD services is RTCA DO‑262A, Normative Appendix, section 2 The FAA have certified and continue to certify FANS 1/A aircraft that use the Iridium SBD sub-network in accordance with applicable ACs and Orders Other appropriate authorities have also issued design approvals and authorized operational use of FOI aircraft

FOI aircraft – More than 100 by 2013 Operator September 2010 February 2012 Cargolux 13 Boeing 747‑400s to over 60 flight destinations worldwide 10 B747s worldwide (+3 Inmarsat) Continental 6 Boeing 737‑800s and 4 Boeing 737‑700s in and out of Guam 18 B757s in North Atlantic Hawaiian 8 B767s in the Pacific UPS participating in pre-FOI data collection and are planning to participate in FOI in the near future 4 B747s, 39 B767s active 42 B767s by October 2011, Crew training has begun, Significant use by May 2012 +17 B767s by November 2013 Delta 8 B757s and 15 B747s planned for significant use in 2012-2013. Currently, 23 B757s, 15 B747s and 3 B737s do Iridium voice/AOC data Qantas 1 B737 in the Tasman Totals 23 FOI aircraft 80 FOI aircraft

ICAO provisions Standards and Recommended Practices (Annex 10), PANS/ATM (Doc 4444) and Regional Supplementary Procedures (Doc 7030) and other ICAO guidance material (e.g., ICAO Doc 9925) FOI is a viable means for conducting ATS communications and FOI aircraft are eligible for CPDLC and ADS‑C operations anywhere in the world

Summary FANS 1/A over Iridium (FOI) is now being accepted as a means of compliance to CPDLC and ADS-C airspace requirements U.S. NAT Other States/regions may be pending further evaluation