Frequency Management In Europe Presented by John Mettrop

Slides:



Advertisements
Similar presentations
SAFETY MANAGEMENT WORKSHOP
Advertisements

© Integra A/S SAFETY MANAGEMENT WORKSHOP Karachi - January 2006 PRESENTERS: PETER THORSEN STEFAN REIB.
The Future Air Traffic Control System Presented by: Geoffrey BaileyKors van den BoogaardDon Willis EurocontrolInternational Air Transport AssociationU.S.
ICAO ACP Working Group C Meeting Toulouse October 2003 WGC6/WP29
Steve Zaidman, AAF-1 George Sakai, ASR-1 Federal Aviation Administration Washington, DC September 16, 2003 There are no benefits to compromising safety…only.
AERONAUTICAL COMMUNICATIONS PANEL (ACP) TWENTY THIRD MEETING OF WORKING GROUP F WACAF/ESAF BRIEF REPORT BY OMODELE AROWOLO Cairo, Egypt 21 – 27 September.
ICAO Seminar on Aeronautical spectrum management (Cairo, 7 – 17 June 2006) SAFIRE Spectrum and Frequency Information Resource (presented by Eurocontrol)
ICAO Radio Spectrum SeminarMID Office, Cairo, 4 – 6 June Frequency Assignment Planning Prepared by Torsten Jacob ICAO ANB/CNS.
Eurocontrol Software Tools for Frequency Management
International Civil Aviation Organisation Middle East Office Seminar on Aeronautical Spectrum Management Cairo 4-6 June 2006 Agenda Item 8: HF Planning.
ICAO Regional Spectrum Seminar, Cairo, Egypt June 2006 SPECIFICS ON FM BROADCAST INTERFERENCE presentation by Steve Mitchell, UK.
ACD A Interference From Non-Aeronautical Systems European Views Presented by John Mettrop UK CAA/FMG Chairman.
ACD A Ultra Wideband UK Test Results Presented by John Mettrop UK CAA.
GSM On-Board Aircraft John Mettrop Directorate of Airspace Policy
Antonio Astorino Eurocontrol
Don Willis Federal Aviation Administration Washington, DC March 30, 2004 There are no benefits to compromising safety…only dire consequences Assessment.
ACP WG B Work Program Frequency Planning Criteria
Frequency Management in the AFI Region Presented by A. Sene, RO/CNS, Nairobi Aeronautical Frequency Management Seminar (Nairobi, 17 – 19 February 2004)
The Cost Of Spectrum How Will Aviation Pay John Mettrop DAP.
Nav, Spectrum & Surveillance RPG for WRC-2007, ACP WGs B&F and NSP SSG, Bangkok Feb 2005 International Civil Aviation Organization Regional Preparatory.
ICAO was created in 1944 to promote the safe and orderly development of civil aviation in the world. A specialized agency of the United Nations, it sets.
Frequency Management Group Chairman
Air / Ground Communications in Europe
Nav, Spectrum & Surveillance Spectrum Management Seminar, Nairobi Feb 2004 SPECIFICS ON FM BROADCAST INTERFERENCE presentation by Steve Mitchell,
ACD A Frequency Management Activities in Europe PRESENTED BY: FMG Chairman John Mettrop From UK Civil Aviation Authority.
ACD A ITU Working Party 8B Activities Presented By John Mettrop UK Civil Aviation Authority.
European Organisation for the Safety of Air Navigation Helping AMHS Roll-out in Europe (HARE) SpeakerRichard Papior OrganisationEUROCONTROL Date and venueJuly.
Presentation by K. P. Rimal, Regional Officer of the ICAO ASIA-PACIFIC Office to the Seminar on implementation of data link and SATCOM Communications in.
1 C ENTRE D'ETUDES DE LA NAVIGATION AERIENNE PHARE Aeronautical Telecommunication Network: PATN By Gérard Mittaux-Biron PATN Project Leader CENA.
NexSAT SG#7 9 th March 2006 Future Communications Infrastructure Jacky Pouzet Communication Domain manager European Organisation for the Safety of Air.
Future Communications Roadmap
To consider additional spectrum allocations to the mobile service on a primary basis and identification of additional frequency bands for International.
Regional Preparatory Workshop for the ITU WRC-2015
To consider additional spectrum allocations to the mobile service on a primary basis and identification of additional frequency bands for International.
APPROVED TRAINING MANUAL’S LESSON PLANS AND COURSEWARE STAR MARIANAS AIR, INC. Recurrent – Flight Crew Part I – Basic Indoctrination Section 2 – Airman.
VHF Digital Link Mode 2 Deployment Strategy Vic Nagowski
ATN ‘99, London, 23 September 1999 David Russell ATS Market Manager, SITA AIRCOM SITA AIRCOM Data Link Service.
ATN/GNSS Seminar Varadero, Cuba 6 to 9 May 2002 GNSS spectrum and signal vulnerability issues Presentation 5.2 by V. Iatsouk, GNSS Panel Secretary ANB/ICAO.
European Organisation for the Safety of Air Navigation Presentation to ICAO Workshop Kiev 28 July – 1 July 2010 EUR Regional Implementation of Flight Plan.
International Air Transport Association 8.33 KHz Channel Spacing – Status, Lessons Learned and a Glimpse to the Future by Steve Zerkowitz Assistant Director.
North Atlantic Systems Planning Group (NAT SPG)
Doc.: IEEE /214r1 Submission May 2003 Bob Huang, Sony ElectronicsSlide 1 Project: IEEE P Working Group for Wireless Personal Area Networks.
NORTH ATLANTIC ADS WAYPOINT REPORTING TRIALS. John Coulson NATS Infrastructure Services.
Doc.: IEEE /214r0 Submission May 2003 Bob Huang, Sony ElectronicsSlide 1 Project: IEEE P Working Group for Wireless Personal Area Networks.
Page 1 European Region Air Navigation & Planning Group (EANPG) Chairman: Phil Roberts (UK CAA) PIRG-RASG Global Coordination Meeting, Montreal 19 March.
Why we need 8,33KHz below FL195? Regulation (EU) No 1079/2012 on VCS-8.33 kHz Bogdan Petricel / Jacky Pouzet Network Manager Luxembourg, March 2015.
International Civil Aviation Organization Middle East Office Seminar On Aeronautical Spectrum Management Cairo, June 2006 Agenda Item 6:- Frequency.
ICAO Regional Spectrum Seminar, Cairo, Egypt June 2006
GSM On-Board Aircraft John Mettrop Directorate of Airspace Policy
ICAO Seminar on Aeronautical spectrum management (Cairo, 7 – 17 June 2006) SAFIRE Spectrum and Frequency Information Resource (presented by Eurocontrol)
Interference From Non-Aeronautical Systems
ITU Working Party 8B Activities
SPECTRUM REQUIREMENTS FOR FUTURE AERONAUTICAL MOBILE (ROUTE) SYSTEM - AM (R )S ( Presented by Christian Pelmoine /Dale Stacey, Eurocontrol.
Frequency Management In Europe Presented by John Mettrop
Regional Preparatory Workshop for the ITU WRC-2015
Frequency Assignment Planning
Thailand, Bangkok, 18 – 21 October 2016
Interference From Non-Aeronautical Systems
SPECIFICS ON FM BROADCAST INTERFERENCE AND LATEST WORK
International Civil Aviation Organization Middle East Office Seminar On Aeronautical Spectrum Management Cairo, June 2006 Agenda Item 6:- Frequency.
Oceanic and International Operations
ICAO Seminar on Aeronautical spectrum management (Cairo, 7 – 17 June 2006) SAFIRE Spectrum and Frequency Information Resource (presented by Eurocontrol)
Oceanic and International Operations
Frequency Management In Europe Presented by John Mettrop
DATA LINK IMPLEMENTATION IN EUROPE
Frequency Assignment Planning
ATN/GNSS Seminar Varadero, Cuba 6 to 9 May 2002
ICAO Regional Spectrum Seminar, Cairo, Egypt June 2006
TWENTY THIRD MEETING OF WORKING GROUP F
Frequency Management Group Chairman
Presentation transcript:

Frequency Management In Europe Presented by John Mettrop UK CAA/FMG Chairman (Press)

Who Are The FMG? European State Aeronautical Frequency/Spectrum Managers 54 States within EANPG Area Neighbouring States Additional States/Organisation on Request (IATA, SITA, ARINC, IFALPA, US, Canada) Meets once a Year Representation from approximately 30-35 States 2 Sub-Groups Study Group Block Planning Group

Where Does the FMG fit Within ICAO

How Does the FMG fit with Other European Organisations EUROCONTROL ICAO SFCG Spectrum Frequency Consultation Group SMG Spectrum Management Group FMG Frequency Management Group

FMG Responsibilities European ICAO Spectrum Management Frequency Management Planning Criteria Co-ordination Procedures Planning and Co-ordination of the Following Systems:- NDB ILS VOR VHF Comms DME/TACAN MLS

FMG Tools/Databases Tools Databases MANIF (Day to Day Frequency Planning Programme) PLANIF(Batch Frequency Planning Programme) (SAFIRE) (Co-ordination Tool) Databases COM 2 VHF Comms (8.33 & 25 kHz, ACARS, VDL Modes 2&4) ≈ 12,000 Assignments COM 3 Nav Systems (ILS, VOR, DME, MLS) ≈ 3,700 Entries COM 4 NDB ≈ 1,500 Assignments

Frequency Co-ordination Requirement for a new assignment Requesting State sends proposal to all States concerned Requesting State negotiates details of the proposal Any objection(s) received ? Requesting State withdraws the proposal Yes Yes No Requesting State sends SUM to ICAO and all States concerned Requesting State starts implementation ICAO registers assignment

Block Planning Meeting STATES Send their requirements to ARB Secretariat States 1)Delete shift options which are noty acceptable 2)Delete proposals which cannot be implemented ARB Prioritise the list of requirements 4 weeks Block Planning Meeting 1) Review results of previous meeting 2) Delete rejected shift options out 2nd planning run 3) Investigate options for failed requirements Eurocontrol Prepare planning database 1 week Eurocontrol Carry out a planning run & send results to States States Co-ordinate and register proposals

Recent Issues MLS Spectrum Requirements Interference from Cordless Phones Mobile Phones on Aircraft Expansion of 8.33 kHz Introduction of VDL Prolonged loss of Communications DME Congestion etc

Further Information EUR Frequency Management Manual http://www.paris.icao.int/documents/pdf/eur_doc012_1ed_en.pdf ICAO Paris Office Robert Kruger (rkruger@paris.icao.int) Chairman John Mettrop (john.mettrop@dap.caa.co.uk)

Questions?