District and Subordinate Courts Application Software Standardization.

Slides:



Advertisements
Similar presentations
Online Construction Estimation Developed By:- Vatsal S. Shah ( ) Dilip K. Babariya ( ) Jimit V. Rajani ( ) Guided by:-
Advertisements

Test process essentials Riitta Viitamäki,
National Register of Social Housing (NROSH) Christine Whitehead, Daniel Banks and Fiona Lyall Grant.
Software by NIC, Secretariat, Port Blair Andaman & Nicobar Administration PROMISE ver 1.2 (PROjects Monitoring and Information System for Enterprise) Slide.
© Tally Solutions Pvt. Ltd. All Rights Reserved 1 Shoper 9 Implementation in Chain Store March 2010.
On implementation of RTI Act 2005: Government’s initiatives Department of Personnel and Training November 4, 2008, Delhi.
Network Design and Implementation
Service and Payroll Administrative Repository of Kerala
Panchayati Raj Institutions Accounting Software
Project Overview Enhancing Information and Communication system in GEFONT - Buddhi Acharya GEFONT.
Computerized Rural Information Systems Project (CRISP), NIC RuralSoft.
Modern Systems Analysis and Design Third Edition Chapter 11 Selecting the Best Alternative Design Strategy 11.1.
8 Systems Analysis and Design in a Changing World, Fifth Edition.
Systems Analysis and Design in a Changing World, 6th Edition
Lecture Nine Database Planning, Design, and Administration
Database System Development Lifecycle Transparencies
eFueloil information systems Applications Prof. Dr.Mohamed El-Azab
Electronic Delivery System of Property Registration Sri Vinay Thakur Sr. Technical Director, NIC HQ
CrackingSiebel.com Utility Siebel Repository Extract (SRE) Tool.
DB Audit Expert v1.1 for Oracle Copyright © SoftTree Technologies, Inc. This presentation is for DB Audit Expert for Oracle version 1.1 which.
Paper on Best implemented scientific concept for E-Governance Virtual Machine By Nitin V. Choudhari, DIO,NIC,Akola By Nitin V. Choudhari, DIO,NIC,Akola.
Computer Measurement Group, India CLOUD PERFORMANCE TESTING - KEY CONSIDERATIONS Abhijeet Padwal, Persistent Systems.
WELCOME TO EXPORT COMMODITY DATABASE (ECDB ) Presentation by DIRECTORATE GENERAL OF VALUATION.
Project Proposal: Academic Job Market and Application Tracker Website Project designed by: Cengiz Gunay Client: Cengiz Gunay Audience: PhD candidates and.
● Problem statement ● Proposed solution ● Proposed product ● Product Features ● Web Service ● Delegation ● Revocation ● Report Generation ● XACML 3.0.
Paper on Best implemented scientific concept for E-Governance projects Virtual Machine By Nitin V. Choudhari, DIO,NIC,Akola.
10/26/00Splitting Access Databases...1 Preparing for Access 2000 Windows 2000/Office 2000 Roll-out.
Chapter 9 Database Planning, Design, and Administration Sungchul Hong.
Database Planning, Design, and Administration Transparencies
Register of the execution case 1. Prehistory Development Executive register is elaborated in the framework of the project “Register of the execution cases”
" Ensuring Services, Empowering People “ Bihar Right To Public Services Act, Sandip Shekhar Priadarshi Admimistrative Officer BPSM General Administrative.
Maharashtra Knowledge Corporation Ltd.. ‘Libraries have a recognized social function in making knowledge publicly available to all. They serve as local.
Publish Calendars to the Web. CCUweb Presentation (10 Minutes) 1 Demonstration of published calendars (10 minutes) 2 Demonstration of importing calendar.
Service Computation 2010November 21-26, Lisbon.
How To Build a Testing Project 1 Onyx Gabriel Rodriguez.
A Brief Preview of Things to Come. PQAPA Program Quality Assurance Process Audit –2008/09 –Academic and Operational –Fall 2007 Launch –18 months to 2.
Database System Development Lifecycle 1.  Main components of the Infn System  What is Database System Development Life Cycle (DSDLC)  Phases of the.
1 Launch of Project for Information and Communication Technology Enablement of Indian Judiciary by Dr. Manmohan Singh Hon’ble Prime Minister of India October.
Presentation By R.M.Johri Principal Director ( InformationSystems) O/O CAG of India.
# e # Project Charter for e-Courts t. # e Utility of Project Charter Provide a common point of reference Define the roles of each of the stakeholders.
Integrating Asset Registers Richard Bramham Asset Co-ordinator Manningham City Council 2010 National Local Government Asset Management and Public Works.
A Brief Documentation.  Provides basic information about connection, server, and client.
Demonstrators and Pan-European Services Laboratory WP5 session.
INTRODUCTION TO DBS Database: a collection of data describing the activities of one or more related organizations DBMS: software designed to assist in.
Chapter 11 Working with Credit Card Methods of Processing Credit Cards Preparing for Cyber Cash Authoring a Credit card Transaction.
District and Subordinate Courts Application Software Standardization.
Modern Systems Analysis and Design Third Edition Chapter 11 Selecting the Best Alternative Design Strategy 11.1.
Common Deficiencies in Voucher Level Computerisation.
Avanade Confidential – Do Not Copy, Forward or Circulate © Copyright 2014 Avanade Inc. All Rights Reserved. For Internal Use Only SharePoint Insights (BETA)
TECHNOLOGY INTEGRATION Atul Kaushik Joint Secretary Department of Justice.
Presentation on Web based Workflow System Project Development Team, APTS Ltd. 1.
Selecting the Best Alternative Design Strategy. Two basic steps 1.Generate a comprehensive set of alternative design strategies 2.Select the one design.
10 August Inter-Regional Workshop on the Production of Gender Statistics New Delhi, India, 6-10 August 2007 Strengthening National Gender Statistics.
Copyright 2007, Information Builders. Slide 1 iWay Web Services and WebFOCUS Consumption Michael Florkowski Information Builders.
Overview PRINCE Hogeschool Rotterdam. 2 Project definition  A project is a temporary organization that is created for the purpose of delivering.
Eurostat Sharing data validation services Item 5.1 of the agenda.
Purchase Module Implementation 28/11/2002 Initiation & Briefing.
Chapter 9 Database Planning, Design, and Administration Transparencies © Pearson Education Limited 1995, 2005.
Chapter 25 – Configuration Management 1Chapter 25 Configuration management.
OIS Progress on Drupal pilot service ENTICE meeting, 30 th September 2010 Jarosław (Jarek) Polok IT-OIS Operating systems and Internet services.
Systems Analysis and Design in a Changing World, Fifth Edition
CMGT 410 aid Education Begins/cmgt410aid.com
Overview – SOE PatchTT November 2015.
Overview – SOE PatchTT December 2013.
CMGT 410 Education for Service-- snaptutorial.com.
CMGT 410 HOMEWORK Perfect Education/ cmgt410homework.com.
CMGT 410 Teaching Effectively-- snaptutorial.com.
Notification issued by Higher Education Department in November, 2014
WELCOME TO SECURE M.G.Prakash Reddy, SQCO, A.P..
An Introduction to Operating Systems
Presentation transcript:

District and Subordinate Courts Application Software Standardization

Why Standardization  Local Perception of states leading to varying:  software functionality  data schema and  output formats It is therefore required to evolve common application software for implementation in all the courts.

Application Software It has two components : 1. Data Definition 2. Processes

Data Definition Identify common minimum data to be captured in all courts across the country. Benefits are : 1. Integration of all the courts 2. Sharing of data among courts 3. Creation of national judicial grid

Data Definition (Contd.) Examples 1. Will help in smooth transfer of cases from one court to another one court to another 2. Lower court’s proceeding details of a case could be made available to the higher court could be made available to the higher court 3. Copy of judgments could be made available to judicial officers to judicial officers

Processes All processes to be included for computerization of the judicial system would require to follow definitions as laid in CPC and CrPC. It has also been observed that interpretation of processes are varying among High Courts.

Background NIC has been associated with the computerization of courts. There are presently six versions of software available which are implemented in different parts of country. These versions are implemented in multiple states, districts and subordinate courts. NIC has tried to address varying definitions among the courts, but was unable to standardize masters and report formats.

Project Strategy 1. The NIC will identify the various “district and subordinate court software versions”, hereafter referred to as application. 2. Identified applications will be compared in terms of – data structures, functionality, level and type of users. Continue in next slide

Project Strategy (Contd.) 1. While comparing software versions, the aim would be to identify :- a)Minimum common data definition. b)Mandatory processes and related data items to run court application. c)Additional processes as covered in functionality of present software versions along with their justification. d)Features & best practices of other applications. A report would then be prepared on above comparisons.

Project Strategy (Contd.) 2. A software committee will be constituted of experts from legal and academic side who would examine the prepared comparative report. 3. Software committee will decide one of the software versions as the base application to go ahead with the project. This base application would be the one which is most advanced in functionality, usage, data structures, and success in various parts of the country.

Project Strategy (Contd.) 4. Software committee will suggest changes/improvements in the comparative report those would be carried out in the base application. 5. Software will also include list of data items, functionalities and report requirements which is super set of all the software versions currently running. 6. The application so developed will be pilot tested. Department of Justice & e-Committee will organize acceptance testing of the application in one pilot location in each state.

Implementation Policy a) The implementation may start only after required setup is made ready with respect to site preparation requirement and required hardware and system software is installed and sufficient stock of consumables are made available at the proposed site. b) After acceptance report of application software is received from state for pilot project, roll-out of application could be allowed for the remaining sites in the state.

NIC’s Initiative 1.Internal discussion of respective software groups. 2.Comparative reports have been prepared showing processes been implemented and data which is being captured by these versions. 3.Identified list of data items, functionalities and report requirements which is super set of all the six software versions currently running. 4.Identified common minimum processes which are essential for day-to-day court functioning.

Common Minimum Modules 1. Caveat Filing 2. Case Filing (both Civil & Criminal) 3. Case Scrutiny 4. Case Registration 5. Case allocation 6. Court proceedings 7. Detail Entry 8. Case Disposal 9. Case Restoration 10. Case transfer 11. Connected Cases 12. Grouping of Cases 13. FIR Details 14. Cause List Generation 15. Institution Register

Additional Modules 1.Fee and Penalty 2.Documents 3.Change of address 4.Alternate Address 5.Property & EP Schedule (Attached Property) 6.Probate 7.Bail Cases 8.Sureity Management 9.MACT 10.Witness 11.Advocate Details 12.Other Reports

Software Versions Currently Available S/W Version States No. of Sites Technology Platform Backend Front end Delhi Oracle Oracle D2K Maharashtra MySQL PHP & PERL Andhra Pradesh 1 3 Oracle PSP Haryana 2 3 SQL Server ASP West Bengal 1 6 Oracle Oracle Gujarat1 2 MySQL PHP & PERL

Status Comparative reports have been prepared with Identified list of data items, functionalities and report requirements.

Status 1. Software committee has been constituted. 2.Software committee has seen the presentation of NIC software versions. 3.Software committee has studied the comparative reports prepared by NIC in order to decide base application software.

Status 4.Software committee has visited field sites to take user’s feedback who are operating identified s/w versions. - Pune and Delhi visit completed - Bangalore and Hyderabad is planned next month 5.Pune version of software has been selected as base version which is to be tested in few pilot locations. These are : MumbaiChennaiCochin GwaliorDehradunNorth-East

Status 6.NIC is to identify features present in other versions but not in selected versions. Idea is to improve selected base version as super set of all the versions. Status – It is completed. Identified additional modules not present in selected version :- 1. Alternate Address 2. Document Details 3. Property Details 4. Probate Details 5. Execution Details 6. Witness Details 7. Bail filing & Proceeding 8. Surety Management 9. Rent Control

Status 7.NIC is to customize selected base application software for features identified in step 6. - Partially completed (except Property, Rent Control, Surety Management type of modules). 8. NIC is to demonstrate base application software to the users of identified pilot sites. S/W can be installed for test feedback if some hardware arrangements are made. Software has been installed at Mumbai, Chennai and Nainital (in Uttaranchal). Reports is awaited from these locations.

Status 9.Respective High Courts have been requested to get the site ready with required hardware as pilot testing is to be completed by 31 st October NIC representatives at each High Court have also been requested to demonstrate selected version of application software to District & Subordinate Courts official so that acceptance level could be understood.