OUCC 2015 Inspiring Innovation Presentation: We think it was time: The rehabilitation of infrastructure at Waterloo Presenter: Jason Gorrie Date: Monday,

Slides:



Advertisements
Similar presentations
The Good, the Bad, the Ugly of Migrating to 2008 Platforms Jeff Middleton.
Advertisements

NetApp Confidential - Limited Use
Implementing vSphere David J Young. Implementing vSphere Agenda Virtualization vSphere ESXi vSphere Client vCenter Storage Implementation Benefits Lessons.
Veeam Roadshow - Better together: Veeam Backup & Replication & NetApp – full Performance with Snapshots Andreas Neufert, Solutions Architect Central EMEA.
Technical Update Jonathan Wood – SIMS Product Manager (Technical and Releases)
Tag line, tag line SnapDrive for Windows 6.2 Customer Technical Presentation November 2009.
MUNIS Platform Migration Project WELCOME. Agenda Introductions Tyler Cloud Overview Munis New Features Questions.
1 Colocation Datacenter – Tenant Portal - Kolding IBA - the E-Designer line 3. November 2014 Morten Moeller.
Fast Path Data Center Relocation Presented by: AFCOM & Independence Blue Cross April 8, 2011.
Technology Steering Group January 31, 2007 Academic Affairs Technology Steering Group February 13, 2008.
1 Northwestern University Information Technology Data Center Elements Research and Administrative Computing Committee Presented October 8, 2007.
Agenda Survey service transition and retirement Examining your survey needs Evaluating application features Service providers.
02/24/09 Green Data Center project Alan Crosswell.
CCC/WNUG Exchange Update May 5, 2005 Nate Wilken Web and Messaging Applications Information Technology Arizona State University.
1 CMS PROJECT Fall 2005 Open Forum October 26, 2005.
Technology Steering Group January 31, 2007 Academic Affairs Technology Steering Group February 13, 2008.
University of Michigan Administrative Information Services MAIS/MCIT Arbor Lakes Parallel Data Center Mark Linsenman Manager Computer Operations MAIS Joint.
VIRTUALIZATION AND YOUR BUSINESS November 18, 2010 | Worksighted.
What is a Computer Network? Two or more computers which are connected together.
VMWare Clusters Basics, Pros, Cons, Possible RADICL implementation By: Nathan Krussel.
Storwize V7000 IP Replication solution explained
Campus Network Infrastructure Bangladesh University of Professionals(BUP) Prepared By: Mazharul Islam Tuhin.
CougarNet Dennis Fouty, Ph.D. Associate Vice Chancellor, University of Houston System Associate Vice President, University of Houston Mary Dickerson, MCSE.
Tier1 Site Report HEPSysMan, RAL June 2010 Martin Bly, STFC-RAL.
COR1000 Telecoms Project UK Link Committee Update September 2012.
ENAM ENAM - INFRA Project 2013.
Transition to Managed Services 0 Microsoft E-Learning IT Infrastructure Partnership Team August 26, 2008.
Socket Swapping for efficient distributed communication between migrating processes MS Final Defense Praveen Ramanan 12 th Dec 2002.
The University of Texas at San Antonio The Office of Information Technology Network Upgrade Overview.
CD FY09 Tactical Plan Status FY09 Tactical Plan Status Report for Site Networking Anna Jordan April 28, 2009.
New Data Center Update Brian Shannon & Anne Silvester.
Follow us on: TAMU Jobs Online System Upgrade Presented to HR Liaison Network Fall Meeting 2012 October 31, 2012.
Progress Energy Corporate Data Center Rob Robertson February 17, 2010 of North Carolina.
Microsoft Virtual Academy Module 8 Managing the Infrastructure with VMM.
CHARUSAT CLOUD PROJECT. Phases 1.Hardware Commissioning 2.Implementing Cluster 3.Implementing VMware 4.Migration of campus servers to cloud…..
Panoptic Capacity Planning Presented by. "Scotty, I need warp speed in 3 minutes or we're all dead!” (William Shatner - Star Trek II ‘The Wrath of Khan’)
Iftekhar Hussain Partner Technology Advisor Microsoft Corporation SESSION CODE: VIR309.
© 2007 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.1 Planning a Network Upgrade Working at a Small-to-Medium Business or ISP – Chapter.
Road to Virtualisation Australian Catholic University Tuan Trinh.
20409A 7: Installing and Configuring System Center 2012 R2 Virtual Machine Manager Module 7 Installing and Configuring System Center 2012 R2 Virtual.
UKI-SouthGrid Overview and Oxford Status Report Pete Gronbech SouthGrid Technical Coordinator HEPSYSMAN – RAL 10 th June 2010.
Take Confident Steps Towards Virtualization Phil Utschig Solutions Architect September 15, 2008 Springfield, IL.
Drupal Service: Infrastructure Update 2 Marek Salwerowicz Sergio Fernandez ENTICE Meeting
Backups Discussion document. Backup – End State Utilize Netapp -SnapManager for Virtual Infrastructure (SMVI) – currently deployed -All VMDKs will be.
Wireless Network Security Virtual Lab Team sdDec11-10 Shishir Gupta, Anthony Lobono, Mike Steffen Client Dr. George Amariucai Advisor Dr. Doug Jacobson.
Computer Centre Upgrade Status & Plans Post-C5, October 11 th 2002 CERN.ch.
Oracle eBusiness Financials R12 Oracle Receivables Functional Overview TCS Oracle Practice.
NetApp Private Storage for SoftLayer ​ Customer Technical Presentation ​ Presenter’s Name ​ Presenter’s Title ​ Presentation Date © 2014 NetApp, Inc. All.
CD-doc-650 Fermilab Computing Division Physical Infrastructure Requirements for Computers FY04 – 07 (1/4/05)
Cold Jet VMWare Consolidation Ben Snowden. Agenda Problems Project Description and Use Deliverables Demonstration Conclusion.
Analysis and Forming of Energy Efficiency and Green IT Metrics Framework for Sonera Helsinki Data Center HDC Matti Pärssinen Thesis supervisor: Prof. Jukka.
© ExplorNet’s Centers for Quality Teaching and Learning 1 Explain the purpose of Microsoft virtualization. Objective Course Weight 2%
InfraStruXure Systems Alex Tavakalov
GDT Automated Scheduling and Operations with C2O.
Australian Institute of Marine Science Jukka Pirhonen.
West Cambridge Data Centre Ian Tasker Information Services.
CD-doc-650 Fermilab Computing Division Physical Infrastructure Requirements for Computers FY04 – 07 (1/4/05)
CANOVATE MOBILE (CONTAINER) DATA CENTER SOLUTIONS
Data Center Stabilization
Flex System Enterprise Chassis
PowerValue 11 RT Sales Presentation
ORACLE OPEN WORLD – 2018 Session ID: CAS5977 OCTOBER 22, 2018
Virtualization Meetup Discussion
20409A 7: Installing and Configuring System Center 2012 R2 Virtual Machine Manager Module 7 Installing and Configuring System Center 2012 R2 Virtual.
Planning a Network Upgrade
Iowa College Aid Processing System (ICAPS)
Storage & Backup Solution Update
Xoserve IX Refresh Customer Update 03/01/2019.
Architecture Overview
Brown County General Hospital Virtualization Project
Presentation transcript:

OUCC 2015 Inspiring Innovation Presentation: We think it was time: The rehabilitation of infrastructure at Waterloo Presenter: Jason Gorrie Date: Monday, May 4, : :35

Agenda EC2 Data Centre Netapp 7mode -> CDOT -History -Timeline -Implementation -Future

DC - History On-campus Co-lo Planning Blackberry Purchase

EC2 DC - Room Specifics Size: 2,000 ft^2 Generation: 3 x 300 kVA bifuel with ATS UPS: 160kVA, 300kVA online UPS with 60+ min battery Cooling: 4 x 30T Direct Expansion CRAC

EC2 EC - What Changed & Why Upgrade CRAC units Remove “legacy” PDU Electrical Distribution – Re-fed a PDU Networking Cold Isle containment

EC2 DC – Cost $805, Cable$199, Containment$49, CRAC$15, Electrical$44, Fire$7, ** General$12, Netapp$75, ** Networking$364, Security$21, Servers $16,726.18

EC2 DC - Transition October 2014: Room “complete” December 2014: Netapp logical move February/March 2015: Emptied Co-lo March 2015: Group moved buildings

EC2 DC - Future Migrate servers from Primary Complete fire suppression / detection EC5

NetApp – Historical perspective Important Dates /

Netapp – CDOT Cluster system created by HA pairs Nodes communicate with 10G switched links “Single” management of common options Virtual placement of network interfaces No more 7-mode

NetApp - Current Environment Main FAS3270HA115TUser Data, Vmware, iSCSI for MS SQL FAS322030TVmware for dev machines FAS327088TDR Oracle TRMAN

NetApp - “New” Environment Clusters 2x FAS8040HA270TUser data, VMware, MS SQL 2x FAS8040HA260TOracle,Research,VMware FAS8020HA040TSecurity Cameras FAS8020HA040TRMAN FAS2552HA020TPCI FAS TOff-campus Valut

NetApp - Migration Phases 1: User home, profiles, spool 2: Departmental data 3: VMs from DR site 4: VMs from primary site 5: MS SQL (iSCSI)

NetApp - Planning 2013: Investigated 2014: Testing & Trial December 2014: Go-live – Phase 1 February 2015: Go-live – Phase 2 March 2015: Go-live – Phase 3 && double down May 2015: Go-live – Phase 4 June 2015: Go-live – Phase 5

Pre-conversion Planning & Testing First one to move Simulator Verification Process Unstable Feature set Swing Space Cabling

NetApp – Design HA Pair SnapMirror

Conversion Issues 32-bit vs. 64 bit Apple + MS Office SNMP

NetApp - Future Have 95% of “everything” virtual by Jan 01, 2017 Finally do SnapVault Use Snap Products to replace MS DPM

OUCC 2015 Inspiring Innovation Questions & Answers