T HE W ORLD B ANK C ARBON F INANCE U NIT Programme of Activities for Cities and suitability of current framework and rules P RESENTATION AT UNFCCC P O.

Slides:



Advertisements
Similar presentations
All data in this presentation is drawn from public or commercial sources; no client-proprietary data has been used. The analyses and conclusions contained.
Advertisements

UNFCCC Complexities in demonstration of additionality of a POA: Perspective of a Project Developer 8 th May 2011 Gareth Phillips Chairman, Project Developer.
The Integration of PoA and NAMA; how can one support the other Ingo Puhl South Pole Carbon Asset Management Ltd. Bonn, 8. May 2011 Prepared by South Pole.
CONOR BARRY, Team Lead OSD UNFCCC Secretariat SDM programme Setting expectations of the workshop Bonn, 7- 8 May 2011 Workshop on Programme of Activities.
1 Egypt Vehicle Scrapping and Recycling Programme 7-8 May 2011 Bonn, Germany Challenges and the Road Ahead.
PoA Challenges & Opportunities
T HE W ORLD B ANK C ARBON F INANCE U NIT I MPROVING SMALL SCALE TRANSPORTATION METHODOLOGIES : L ESSONS FROM E GYPTIAN VEHICLE SCRAPPING P O A. P RESENTATION.
BASELINE STANDARD UNFCCC secretariat workshop
T HE W ORLD B ANK C ARBON F INANCE U NIT UNFCCC W ORKSHOP : S TANDARDS FOR BASELINE SCENARIO IDENTIFICATION AND BASELINE EMISSION CALCULATIONS M ARCH 2011.
SDM programme, UNFCCC secretariat Kishor Rajhansa, Programme Officer STATUS AND WAY FORWARD ON STANDARDIZED BASELINES UNFCCC Joint coordination Workshop.
UNFCCC secretariat, Sustainable Development Mechanisms Verónica Colerio, Standard Setting Unit Standardized Baselines in the CDM: Decisions and Way Forward.
T HE W ORLD B ANK C ARBON F INANCE U NIT J OINT C OORDINATION W ORKSHOP B REAKOUT S ESSION 1.1. P O A M ARCH 2011 P RESENTATION BY F ELICITY S PORS (F.
A Project Developers view on lessons learned and challenges with PoAs (module 2.2) 24 March 2012 Mischa Classen Executive Committee, Project Developer.
PoA AFTER Cancun - READY TO TAKE OFF NOW
UNFCCC secretariat, Sustainable Development Mechanisms Programme Conor BARRY Improving and demonstrating efficiency in CDM processes 7 th Joint Coordination.
Defining Standardized Baseline: The role of DNAs Malin Ahlberg Co-Chair of the DNA Forum 13 March 2011, Bonn.
SDM programme, UNFCCC secretariat Wenxin Li, Programme Officer Overview of PoA Standards SDM JOINT COORDINATION WORKSHOP Bonn, Germany, March 2012.
Implementation of the Suppressed Demand Guidelines in New and Existing SSC Methodologies Carolyn Luce, Small Scale Working Group Member FIRST SDM JOINT.
The Committee and Research – Where are we and where might we be going?
T HE W ORLD B ANK C ARBON F INANCE U NIT Standardised Baselines Framework March 24-25, Bonn.
Grenada Sustainable Energy Plan Stakeholders Meeting April 5, 2002.
Delivering a real CDM Project The BP PRODEEM Rural Solar Project.
Validation and Verification of CDM Projects Climate Change Kiosk on CDM/DNA, COP9 December 6, 2003 Marco van der Linden SGS Climate Change Programme.
Structure of DNA and Proposed Sustainable Development Criteria for CDM Projects In Bangladesh CDM Designated National Authority (DNA) Durbar Conference.
1 Rajesh Kumar Sethi Chair of the CDM Executive Board Clean Development Mechanism 1-3 April 2008 Bangkok, Thailand AWG-KP 5 In-session workshop on means.
Presentation title Session 3: The Concept of Programme of Activities (PoA) PoA Registration and CPA inclusion Training-Workshop to support the “Uganda.
CDM PoA CPA. What is a Programme of Activities? Definition: A programme of activities (PoA) is a voluntary coordinated action by a private or public.
A city-wide approach to carbon finance
T HE W ORLD B ANK C ARBON F INANCE U NIT PoAs and liability – the issue P RESENTATION AT UNFCCC P O A WORKSHOP M AY 2011 BY F ELICITY S PORS (F
UNFCCC Secretariat Status of negociations on CDM Perumal Arumugam Regional Workshop on CDM and NAMAs for Latin America and the Caribbean,Bogota, (31 –
Joint Implementation & Gas Flaring Reduction Projects Alexandrina Platonova-Oquab Carbon Finance Unit, World Bank.
HIGHLIGHTS OF GHANA’S ENVIRONMENTAL FISCAL REFORM POLICY (WIP) Presented by: Ebenezer Nortey (Ministry of Finance) at UNEP Regional Workshop on Inclusive.
6.1 Module 6 Reporting of Mitigation Assessments in National Communications Ms. Emily Ojoo-Massawa CGE Chair.
T HE W ORLD B ANK C ARBON F INANCE U NIT Extension of simplified modalities for demonstration of additionality to EE and RE projects.
Opportunities and Challenges in Promoting Energy Efficiency Under the Clean Development Mechanism by Lando Velasco E xperts Group Meeting on Industrial.
T HE W ORLD B ANK C ARBON F INANCE U NIT Experiences and challenges implementing PoAs from the perspective of a Stakeholder P RESENTATION AT UNFCCC P O.
UNITED NATIONS INDUSTRIAL DEVELOPMENT ORGANIZATION Reducing poverty through sustainable industrial growth Power-Gen PAK rd International Conference.
Technical aspects of NAMAs: Options and methodologies for developing baselines for different categories of NAMAs* Neha Pahuja Associate.
SESSION 3: Climate Change Financing Opportunities.
Common Carbon Metric for Measuring Energy Use & Reporting Greenhouse Gas Emissions from Building Operations A tool developed by GHG Protocol and UNEP-SBCI.
JOINT IMPLEMENTATION MECHANISM IN BULGARIA J I MINISTRY OF ENVIRONMENT AND WATER 26 May 2004 Daniela Stoycheva – National Focal Point on CC, BULGARIA.
Batyr Ballyev, Head, Environment Protection Department, the Ministry of Nature Protection of Turkmenistan Climate Change-Related Priorities & Needs.
The African CDM Training Workshop and Preparatory UNFCCC COP9 Meeting Addis Ababa, Ethiopia, October 20 – 21, 2003 INSTITUTIONAL SET-UP FOR CDM Dr Youba.
EU Climate Action EU – Central Asia Working Group on
Welcome. The legal framework of CDM - UNFCCC, at Rio de Janeiro Earth Summit, Kyoto protocol, CDM, Parties and Benefits Basic requirements.
Implementation of the Kyoto Protocol: what does it mean for bioenergy and C sequestration? Implementation of the Kyoto Protocol: what does it mean for.
The GEF Experience in Financing Technology Transfer: Overview Sub-regional Workshop for GEF Focal Points Europe and CIS Dubrovnik, Croatia, February.
OVERVIEW OF CDM GUIDELINES ON UNEP CDM Guidebook/E7 Guide Dr. Bahaa Mansour TIMS Dr. Mohamed Elewa TIMS Presented by: CDM Guidelines Cairo, January 12-13,
ENABLING ACTIVITIES FOR THE PREPARATION OF THE KINGDOM OF CAMBODIA’S SECOND NATIONAL COMMUNCIATION TO THE UNFCCC (SNC Project) Presented by Long Rithirak.
Programmatic CDM: Eligibility, Methodological Requirements and Implementation Development Dividend Side Event December 5, 2005 Christiana Figueres Team.
CDM Project Cycle & Project Design Document Project Design Document First Extended & Regional Workshops CD4CDM Project Siem Reap, Cambodia March.
T HE W ORLD B ANK C ARBON F INANCE U NIT CDM Programmes of Activities : O PPORTUNITIES TO IMPROVE IMPLEMENTATION P RESENTATION AT HCC M EETING, M AY 31,
1 PDD and PIN preparation Technical Workshop on CDM Paramaribo, 18 June 2008 Adriaan Korthuis.
E:\The Carbon Market and Small Producers.ppt The Carbon Market and Small Producers 18 July, 2007 STRICTLY PRIVATE & CONFIDENTIAL.
0 National Inter-Ministerial Dialogue on Climate Change Cape Hotel Monrovia, Liberia June 25, 2009 Assessing and Developing Policy Options for Addressing.
TÜV SÜD Industrie Service GmbH CDM JCW Bonn 12 March 2011 Module 1.2 „existing barriers within the current PoA rules” An analysis from a DOEs perspective.“
TECHNOLOGY TRANSFER AND NATIONAL COMMUNICATIONS UNFCCC /UNDP EXPERT MEETING ON METHODOLOGIES FOR TECHONOLGY NEEDS ASSESSMENTS SEOUL, KOREA April.
UNFCCC secretariat From CDM to NAMAs – Synergies between CDM and NAMAs Perumal Arumugam Latin American Carbon Forum, Bogota (03 – 05 Sep 2014)
Ann Gordon Ministry of Natural Resources and the Environment Belmopan Nationally Appropriate Mitigation Actions in the post 2012.
KfW Carbon Fund From PoA to NAMA Barcelona 31th of May 2011.
NAMA potential of Vietnam Vuong Xuan Hoa Institute of Meteorology, Hydrology and Environment Ministry of Natural Resources and Environment Climate Change.
Visit of the S. Korean delegation UNEP Risø Centre, 1 September 2005 Jørgen Fenhann Analysis of the CDM project pipeline Content of the presentation: What.
Mitigation Targets and Actions under Sierra Leone’s NDC
OVERVIEW OF CDM GUIDELINES ON UNEP CDM Guidebook/E7 Guide
IMPLEMENTATION ISSUES FOR THE CREATION OF OFFSETS IN THE AGRICULTURE AND FORESTRY SECTORS FOR USE IN A POTENTIAL CANADIAN DOMESTIC EMISSION TRADING.
Current Status of Carbon Market in Thailand
Focal Area and Cross Cutting Strategies – Climate Change
REReP regional meeting on “Energy and climate” in South Eastern Europe
Q&A sessions at UNFCCC SB26
Prepared by: Maha Abu Mowais 31 October 2018
Presentation transcript:

T HE W ORLD B ANK C ARBON F INANCE U NIT Programme of Activities for Cities and suitability of current framework and rules P RESENTATION AT UNFCCC P O A WORKSHOP M AY 2011 BY F ELICITY S PORS (F WORLDBANK. ORG ) & M ONALI R ANADE (M WORLDBANK. ORG )F WORLDBANK. ORGM WORLDBANK. ORG

T HE W ORLD B ANK C ARBON F INANCE U NIT Contents Why do we need a city-wide PoA ? How does a city-wide PoA work in practice? Regulations needed to support city-wide PoAs. PoA regulatory barriers also impact city-wide PoAs.

T HE W ORLD B ANK C ARBON F INANCE U NIT Globally, cities emit up to 70% of all GHGs but occupy only 2% of the worlds land Source: UN Habitat Transportation of Waste WasteTransport Urban Forestry Water Grey water reuse Sludge treatment Pedestrian comfort Energy Traffic management systems Biogas-to- energy Efficient water pumping Heat island effect Sources of emissions: 1. Transport 2. Solid waste 3. Water 4. Energy usage Emission sink: Urban forestry

T HE W ORLD B ANK C ARBON F INANCE U NIT Current options for cities to access carbon finance* City A City B City C Waste Transport water Options 3: PoA across many cities (e.g., Transport CPAs in City A, B and C ) Option 1: Stand-alone project in one large city (e.g., LFG project in City A) Option 2: Bundle of two or more projects in one city or across multiple cities (e.g., EE in water pumping in City B and City C) water * Under CDM

T HE W ORLD B ANK C ARBON F INANCE U NIT Small individual projects - Average size of stand alone medium sized projects in cities result in approx CERs/yr. Bundling or PoAs across cities is administratively complex - Repeated clearances from the same city council for different projects created problems. Lack of support for strategic planning by the city – City authorities are not encouraged by current CDM to take a holistic view of their city. Direct benefits of city participation are hard to quantify – The direct local benefits CDM projects may be difficult to quantify, making it difficult for city authorities to justify expenditures on these projects Key challenges for cities accessing current CDM Solution proposed – city wide PoAs: The idea is to better align CDM project planning with normal urban planning and management processes, which are focused on provision of urban services. E.g. Eco-city Tianjin, Amman city PoA.

T HE W ORLD B ANK C ARBON F INANCE U NIT Structure of city-wide PoAs Management, Implementation, monitoring & reporting Implementation over time

T HE W ORLD B ANK C ARBON F INANCE U NIT Sectoral scope included in city-wide PoA Sectoral ScopeExamples of project activities (CPA)Methodology 1. Energy industries (RE / non-renewable) Solar water heatersAMS I.C Wind powerACM Energy distributionLoss reductionAMS II.A 3. Energy demandCFLAMS II.J Street-lighting, water pumpingAMS II.C or AMS II.L Building energy efficiencyAMS II.E or AMS III.A.E. 6. ConstructionRecycling of building materialWhen available 7. TransportBus Rapid TransitAM0031 or ACM0016 RetrofitAMS III.AA Electric vehicles and fuel-switching AMS III.C, AMS III.S 13. Waste handling and disposal Landfill gasACM0001, AMS III.G Municipal waste management, incl. recycling and waste water treatment AMS type III methodologies 14. Afforestation and reforestation Creation of green areas, in and around the city AR-AMS AgricultureManure management systemAMS III.D or ACM0010

Environmental integrity of city-wide PoAs Clear attribution of emissions: Emission Reductions can be traced to the exact and unique technology/measure implemented by each CPA Transparency and conservativeness: Calculation of ERs using approved (large/small/consolidated) methodology Baseline Scenario: Identified for each CPA Additionality: Established for the entire PoA (as financing guidelines for the PoA) or for each CPA (as IRR or EIRR benchmark) Monitoring: Integrated with the existing administrative system and undertaken for each CPA as per the approved methodology Avoidance of double-accounting: Ensured by maintaining central database of unique combinations of location and technology for individual CPAs, within the geographical boundary of the municipality. De-bundling: PoA will be a large-scale activity, though depending on project size and availability of methodology, appropriate methodology (large/small/consolidated) will be used for each CPA Contd.

T HE W ORLD B ANK C ARBON F INANCE U NIT Paragraph 4(b) of the CMP.6 decision: Requests the Executive Board to reassess its existing regulations related to programmes of activities in order to: [] (b). simplify the application of programmes of activities to activities applying multiple methods and technologies, including for possible city-wide programmes, while ensuring environmental integrity to the extent required by the Kyoto Protocol and decisions of the Conference of the Parties serving as the meeting of the Parties to the Kyoto Protocol Decision of CMP6, December 2010 regarding the city- wide programmes

T HE W ORLD B ANK C ARBON F INANCE U NIT Allow use of multiple methodologies under a PoA Modify the PoA-DD format and remove requirement for generic CPA-DD To begin with, use of multiple methodologies can be restricted to PoAs that – Are implemented by a legally distinct entity (e.g., a municipal authority) – Use approved CDM methodologies – Allow for unique identification of each project activity (technology, location) – Develop a centralized database system to avoid double-counting – Each CPA has distinct and clear linkage with the municipal authority, i.e., the project is implemented by the municipal authority directly (e.g., Bus Rapid Transit system) or through a sub-contractor (e.g., solar water heater for households) or by a private investor (e.g., wastewater treatment for the city) Rules required to allow city wide PoA

T HE W ORLD B ANK C ARBON F INANCE U NIT These are common to all PoAs and therefore will also affect the City-wide PoA. Lack of appropriate methodologies for some sectors – energy efficiency in buildings, transportation, etc. Liability for DOEs – erroneous inclusion issue needs to be addressed. No clear guidance on impact of mandatory law on baseline emissions. i.e. how to treat a program that is helping to achieve the greater compliance of the mandatory law should be treated especially for calculating the baseline emissions. Addressing uncertainty to ensure integrity of CERs - Need for greater clarity on sampling and appropriate discounts in the light of uncertainty to increase. General challenges with PoA

T HE W ORLD B ANK C ARBON F INANCE U NIT Thanks for listening

Transportation of Waste WasteTransport Urban ForestryWater Grey water reuse Sludge treatment Pedestrian comfort Energy Traffic mgt Biogas-to- energy Efficient water pumping Heat island effect City-wide program Carbon markets Climate finance National/local government Bi-lateral agencies Private investors Local jobs Pollution reduction Air quality Energy saving Quality of life GHG mitigation 1.Define structure 2.Define boundary 3.Prepare inventory 4.Identify agencies 5.Define incentives 6.Identify activities 7.Establish database 8. Implement activities 9.Quantify GHG ER 10.Validate/verify

How to validate and verify city-wide PoA Validation of PoA and 1 st CPA CME prepares PoA-DD and 1 st CPA-DD DOE team with PoA experience and sectoral scope of 1 st CPA DOE validates the CME structure and central database. The DOE also validates all other PoA requirements, eligibility, additionality, stakeholder consultation, Environmental Assessment, etc. Inclusion of CPA in registered PoA CME prepares CPA-DD(s) DOE team with sectoral scope of the relevant CPA (2 nd, 3 rd,…, n th ) Site-visit, if required Verification CME prepares monitoring report DOE with sectoral scope of the CPA(s) to be verified Site-visits, as required, verification of database and CDM requirements

Amman Green Growth ProgramA B C A A – GAM implemented activities B B – Activities within GAM boundary, implemented by other public or private sector agencies (e.g., BRT) C C – GAM supported activities, outside GAM area (e.g., wind farm)

T HE W ORLD B ANK C ARBON F INANCE U NIT Examples of sector specific regulatory challenges for transport and housing in city wide PoA.