Matthew Udenenwu Waste Permits Division 2015 TCEQ Environmental Trade Fair.

Slides:



Advertisements
Similar presentations
Metro Muncipal Agreement Program
Advertisements

Local Agency Bridge (LABP) Program Overview Informational Presentation – January 7, 2011 Carol Olsen, ODOT LGS Bridge Program Manager Local.
GEORGETOWN COUNTY STORMWATER DIVISION Breakfast Series #3 How to Prepare a Stormwater Pollution Prevention Plan January 14, 2009.
Field Orders on Construction Contracts Guidance Document CLC-8 May 13, 2013.
SW101 The NPDES Industrial Storm Water Program. What Does the Industrial Program Cover? F Storm Water Discharges Associated with Industrial Activity l.
Quality Assurance/Quality Control Plan Evaluation February 16, 2005.
Certification of Compliance By Evita Lagard
NCHRP Task 254 Project Vehicle Size & Weight Management Technology Transfer/Best Practices.
MODULE B - PROCESS B1. ASME Organizational Structure B2. Standards Development: Staff and Volunteer Roles and Responsibilities B3. Conformity Assessment:
DREDGING YOUR DOCKS 2013 Supported by: USACE Galveston District U. S. Coast Guard Sabine Neches Navigation District.
DREDGING YOUR DOCKS 2012 Organized By CRA Hydrographic Surveyors Orion Marine Group.
Community Facility Loans/Grants Architect Flow Chart Owner has need for project. RD Area Office is contacted. RD visits project site and discusses project.
Panel Discussion Oil and Gas Waste Management in Texas Chance Goodin and Diane Goss Texas Commission on Environmental Quality (TCEQ) Grant Chambless, P.G.
Title V Site Operating Permits (SOPs)
January Goals: Streamline permitting process for certain solid waste facilities and activities Expand use of 3 rd party inspectors to allow MassDEP.
SPDES General Permit for Stormwater Discharges During Construction Activity GP Mike Jurkowski, CPESC, NYSDOT - Summary of Changes From GP
Road Map to a Green Tag Paperwork=Time=Money. Questionnaire If you could change any one major thing inside the Fire Community Services process what would.
Module 7: Construction Phase
COMPLIANCE WITH GRANT IMPLEMENTATION PROCEDURES TxDot Grant Fund Project.
By: Carol Martineau, Acting Assistant Manager, Aircraft Maintenance Division, AFS-301 Date: June 7, 2015 Federal Aviation Administration ASA Conference.
After the Sanitary Survey
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
Unit 8:COOP Plan and Procedures  Explain purpose of a COOP plan  Propose an outline for a COOP plan  Identify procedures that can effectively support.
Mn/DOT AUDIT COUNTY HIGHWAY ACCOUNTANTS SINGLE AUDIT DISCUSSION.
Landfill. ESSENTIAL COMPONENTS 7 essential components are: (a) A liner system at the base and sides of the landfill which prevents migration.
PUBLIC PROCUREMENT OPERATIONS Dr. Fred Mugambi Mwirigi JKUAT 1.
Medical Waste Management Rulemaking Open Participation Meeting Texas Commission on Environmental Quality Waste Permits Division August 18, 2015, Austin.
Water Supply Planning Initiative State Water Commission November 22, 2004.
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Pacific Air Forces 1 Preconstruction Orientation HQ PACAF/LGC.
How to prepare for an Authorized Agent Compliance Review Ronald Hebert Water Section Manager Region 10/ Beaumont (409)
Idaho Solid Waste Facility Record Keeping June 20, 2006 Idaho Department of Environmental Quality.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Superstructure and Bridge Replacements in Regions 2 & 9 Design-Build Project (PIN , D900022) Herkimer,
Local Government Section Welcome Marty Andersen ODOT Local Government Section 355 Capitol Street NE, Rm. 326 Salem, Oregon Ph:
October Mary Louise Hendrickson Solid Waste Section – Technical Lead
Long-Term Postclosure Maintenance and Corrective Action Cost Estimates and Financial Assurance Demonstrations for Landfills General Overview of Regulatory.
VI. Developing a VSMP Program General Stormwater Training Workshop.
Michigan Department of Licensing and Regulatory Affairs Bureau of Construction Codes.
 Storm Water Pollution Prevention Plan (SWPPP)  All dischargers over 1-acre must develop a SWPPP  6 major portions of every SWPPP Site Evaluation and.
1 Permit Implementation Regulations Defines the phrase “significant change in the design or operation of a solid waste facility that is not authorized.
General Operating Permits
Responsibilities of Lead Agency Pages 7-8 of Training Guide 1. Preliminary review a) Determine if activity is a project as described by CEQA b) May require.
May 11-13, 2005CIWMB/LEA Conference1 Closure & Postclosure Maintenance Plans What You Need To Know or Secrets Revealed.
3 CDBG Disaster Recovery Program InformationWorkshop Tuesday, January 13, 2009.
KYTC Change Order (Contract Modifications).
Local Assistance Section GUIDANCE FOR PREPARING THE AREA SOLID WASTE MANAGEMENT PLAN 5-Year Update Solid Waste Coordinator Training FEBRUARY.
PAC Meeting July 2, Agenda  Introductions and thanks  Project to date  Next steps  Questions.
Gulay Aki, P.E. Mario Perez Municipal Solid Waste Permits Section Texas Commission on Environmental Quality Trade Fair 2016 Medical Waste Management in.
PRE-PROPOSAL CONFERENCE Welcome! American Air Power Museum 1230 New Highway, East Farmingdale, New York November 14, 2012 Management, Business Development.
HB 2031 and HB 4097: Marine Seawater Desalination Rulemaking Trade Fair / May 2016 Office of Water Water Availability Division Water Quality Division.
MnDOT AUDIT 2016 COUNTY HIGHWAY ACCOUNTANTS CONFERENCE ANNUAL FEDERAL CITY COUNTY AUDIT DISCUSSION.
N.O.T. Paperwork and Recorder of Deed Requirements NPDES & PCSM Permitting Workshop May 24, 2016.
ADA/504 Technical Assistance Tool Ken Woodruff, Civil Rights Program Manager, FHWA.
Proven Management – Proven Gold Districts – Safe Jurisdictions Symbol:PG Exchange:TSX Hardrock Project Environmental.
Municipal Solid Waste Program Update TCEQ Environmental Trade Fair
Industrial & Hazardous Waste Updates and Emerging Issues
TCEQ Environmental Trade Fair
Low-Level Radioactive Waste Forum
Class I Injection Well Application Issues
Industrial and Hazardous Waste Easier, Better, Faster Permitting
MPO School Transportation Working Group
TCEQ Environmental Trade Fair Austin Convention Center May 3, 2016
Alexander Hinz & Kasy Stinson Water Supply Division
Cupa violation Review BAESG Meeting May 20, 2019 Matthew Burge
Institutional Controls At Voluntary Cleanup Sites
PUBLIC WATER SYSTEM PLAN and EXCEPTION REVIEW
Closure and Post-Closure
TOOLS FOR HIGH QUALITY APPLICATIONS (AKA “Streamlining”)
Kasy Stinson Water Supply Division
Diversity management system (DMS)
Presentation transcript:

Matthew Udenenwu Waste Permits Division 2015 TCEQ Environmental Trade Fair

Introduction Closure Plan Closure Plan Closure Cost Estimate Closure Cost Estimate Transportation Data and Coordination Transportation Data and Coordination Post Closure Care Plan Post Closure Care Plan Post Closure Care Cost Estimate Post Closure Care Cost Estimate

Background Identify Permit Application Process Challenges. Variability in Submittals. Application Deficiency Issues Find Solutions to Process Challenges Develop Checklists Develop Forms

Variability in Submittals

Permit Application Deficiencies

Application Review Times

Perform Problem Analysis

Steps to Forms 1. Technical Review Elements 2. Technical Review 2. Technical Review Sub-Elements 3. Technical Review Items 4. Criteria for Determining that a Review Item has been Adequately Addressed 5. Technical Review Adequacy Criteria Document 6. Forms

The Forms Ready Closure Plan Closure Plan Post-Closure Care Plan Post-Closure Care Plan Closure Cost Estimate Closure Cost Estimate Post-Closure Care Cost Estimate Post-Closure Care Cost Estimate Transportation Data and Coordination Reports Transportation Data and Coordination Reports In Development General Facility Design General Facility Design Threatened and Endangered Species Threatened and Endangered Species Location Restrictions Location Restrictions Waste Acceptance Plan Waste Acceptance Plan

Closure Form Page 1 Section I Section I General Information General Information Section II Section II Part A -Description of Landfill Units Part A -Description of Landfill Units Part B – Description of Storage or Processing Units Part B – Description of Storage or Processing Units Part C – Maximum Waste Inventory Part C – Maximum Waste Inventory Part D – Locations of Unit Drawings Part D – Locations of Unit Drawings

Closure Form Page 3 Section III – Final Cover Section III – Final Cover Part A - Types and Description Part A - Types and Description Part B – Design Features (top and side slopes) Part B – Design Features (top and side slopes) Part C – Drainage Features Part C – Drainage Features Part D – Vegetation or other ground cover material Part D – Vegetation or other ground cover material Part E – Final Contour Map Part E – Final Contour Map

Closure Form Page 6 Section IV – Final Cover System Instillation Section IV – Final Cover System Instillation Part A – Mode of Instillation Part A – Mode of Instillation Part B – Drawings showing Sequence of Installation of Final Cover Part B – Drawings showing Sequence of Installation of Final Cover Part C – Final Cover Quality Control Plan (FCQCP) Part C – Final Cover Quality Control Plan (FCQCP) Part D – Final Cover System Evaluation Report (FCSER Part D – Final Cover System Evaluation Report (FCSER

Closure Form Page 8 Section V - Closure Activities and Schedules Section V - Closure Activities and Schedules Part A – Closure of Landfill Unit Part A – Closure of Landfill Unit Closure Notification Closure Notification Submit Final Cover System Evaluation Report Submit Final Cover System Evaluation Report Submit Engineer’s Certification of Closure Submit Engineer’s Certification of Closure TCEQ’s Acknowledges Closure TCEQ’s Acknowledges Closure

Closure Form Page 12 Section V - Closure Activities and Schedules Section V - Closure Activities and Schedules Part C – Final Facility Closure Criteria Part C – Final Facility Closure Criteria Publish Final Closure Notice and Place Closure Plan in Public Place Publish Final Closure Notice and Place Closure Plan in Public Place Submit Written Notice to TCEQ Executive Director Submit Written Notice to TCEQ Executive Director Post Signs and Install Barriers Post Signs and Install Barriers File “Affidavit to the Public” and Performance of the Final Deed Recording File “Affidavit to the Public” and Performance of the Final Deed Recording

Closure Form Page 14 Section V: Part C – Final Facility Closure Criteria (cont.) Section V: Part C – Final Facility Closure Criteria (cont.) Submit Copy of “Affidavit to the Public” and “Modified Deed” to the TCEQ Executive Director Submit Copy of “Affidavit to the Public” and “Modified Deed” to the TCEQ Executive Director Certification of Final Facility Closure by 3 RD Party P.E. Certification of Final Facility Closure by 3 RD Party P.E.

Closure Form Section V: Part C – Final Facility Closure Criteria (cont.) Section V: Part C – Final Facility Closure Criteria (cont.) TCEQ Accepts Termination of Operation and Closure of a Landfill Facility TCEQ Accepts Termination of Operation and Closure of a Landfill Facility Closure Schedule Closure Schedule Section VI: Attachments Section VI: Attachments Page 15

Closure Form Page 17 Section VII - Engineer’s Seal and Signature Section VII - Engineer’s Seal and Signature

Closure Cost Estimate Page 1 Section I – Engineer’s Statement Seal and Signature Section I – Engineer’s Statement Seal and Signature

Section II Section II Site Operator’s Acknowledgment to Perform Annual Reviews and Updates Site Operator’s Acknowledgment to Perform Annual Reviews and Updates Closure Cost Estimate Page 2

Closure Cost Estimate Section III Section III Descriptions of Cost Estimate Worksheet Items Descriptions of Cost Estimate Worksheet Items Engineering Costs Engineering Costs Construction Costs Construction Costs Storage and Processing Units Storage and Processing Units Contingency Contingency Contract Performance Bond Contract Performance Bond Page 3

Closure Cost Estimate Section IV Section IV Closure Cost Estimate Worksheet Closure Cost Estimate Worksheet Page 8

Closure Cost Estimate Section IV – Closure Cost Estimate Worksheet (cont’d) Section IV – Closure Cost Estimate Worksheet (cont’d) Page 11

Transportation Data Page 1 General Information General Information

Transportation Data Page 2 Section I Section I Documentation of Coordination with TxDOT Documentation of Coordination with TxDOT Section II Section II TxDOT Recommended Roadway or Intersection Improvements TxDOT Recommended Roadway or Intersection Improvements Section III Section III Documentation of Coordination of Public Roadway Improvement with the Agency that has Jurisdiction Documentation of Coordination of Public Roadway Improvement with the Agency that has Jurisdiction

Transportation Data Section V – Facility Daily Traffic Volume Data Section V – Facility Daily Traffic Volume Data Page 5

Transportation Data Section VI – Availability and Adequacy of Roads Section VI – Availability and Adequacy of Roads Section VII – Conclusion on availability and adequacy of roads Section VII – Conclusion on availability and adequacy of roads Section VIII – Highway Beautification Section VIII – Highway Beautification Section IX – Analysis of Impact upon Airports Section IX – Analysis of Impact upon Airports Page 6

Transportation Data Page 8 Section X – Documentation of Coordination with Airport Location Restrictions Section X – Documentation of Coordination with Airport Location Restrictions Section XI – FAA Recommended Changes (as applicable ) Section XI – FAA Recommended Changes (as applicable )

Post-Closure Care Plan Page 1 Section I Section I General Information General Information Section II Section II Party Responsible for Overseeing and Conducting Post-Closure Care Activities Party Responsible for Overseeing and Conducting Post-Closure Care Activities Section III Section III Post Closure Care Status of Landfill Units Post Closure Care Status of Landfill Units

Post-Closure Care Plan Page 3 Section IV – Post Closure Care Maintenance Requirements and Activities Section IV – Post Closure Care Maintenance Requirements and Activities Section IV: Part B Section IV: Part B Post Closure Care Maintenance Requirements and Activities for Facilities that Stopped Receiving Waste Prior to October 9, 1993 Post Closure Care Maintenance Requirements and Activities for Facilities that Stopped Receiving Waste Prior to October 9, 1993

Post-Closure Care Plan Section IV: Part C- Post Closure Care Requirements and Activities for Landfill Units that Received Waste on or After October 9, 1993 Section IV: Part C- Post Closure Care Requirements and Activities for Landfill Units that Received Waste on or After October 9, 1993 Commencement of post-closure care Commencement of post-closure care Period of post-closure care Period of post-closure care Inspection Activities Inspection Activities Documentations of Corrective Actions Documentations of Corrective Actions Page 7

Post-Closure Care Plan Page 9 Section IV Section IV Table 5 – Inspection Activities Schedule – Final Cover Table 5 – Inspection Activities Schedule – Final Cover

Post-Closure Care Plan Page 14 Section IV Section IV 9. Continuation of Monitoring Systems Operation and Maintenance 9. Continuation of Monitoring Systems Operation and Maintenance

Post-Closure Care Plan Page 15 Section IV Section IV Table 8 – Landfill Gas Management System Inspection Table 8 – Landfill Gas Management System Inspection

Post-Closure Care Plan Page 18 Section V - Recordkeeping Section V - Recordkeeping Section VI – Planned Use of the Land during and after the Post-Closure Period Section VI – Planned Use of the Land during and after the Post-Closure Period Section VII – Post- Closure Care and Corrective Action Cost Estimates Section VII – Post- Closure Care and Corrective Action Cost Estimates

Post-Closure Care Plan Section VIII – Certification of Completion of Post Closure Care Section VIII – Certification of Completion of Post Closure Care Page 19

Post-Closure Care Plan Section IX – Voluntary Revocation Request Section IX – Voluntary Revocation Request Section X – Attachments Section X – Attachments Section XI – Engineer’s Seal and Signature Section XI – Engineer’s Seal and Signature Page 20

Post-Closure Care Costs Page 1 Section I – Professional Engineer’s Statement, Seal, and Signature Section I – Professional Engineer’s Statement, Seal, and Signature

Post-Closure Care Costs Section II – Annual Review Section II – Annual Review Page 2

Post-Closure Care Costs Page 3 Section III – Description of Worksheet Items of the Post-Closure Care Cost Estimates Section III – Description of Worksheet Items of the Post-Closure Care Cost Estimates Engineering Costs Engineering Costs Construction Costs Construction Costs Leachate Management Costs Leachate Management Costs Contingency Contingency

Post-Closure Care Costs Page 6 Section IV – Post- Closure Cost Estimates Worksheet Section IV – Post- Closure Cost Estimates Worksheet

Post-Closure Care Costs Section IV - Post-Closure Cost Estimates Worksheet Section IV - Post-Closure Cost Estimates Worksheet Page 7

What’s Next? Release the Forms for Use Release the Forms for Use Continue Work on the other Pending Forms Continue Work on the other Pending Forms Finalize the TRAC Documents for Internal Use Finalize the TRAC Documents for Internal Use

Q & A The TCEQ appreciates the organizations and individuals that provided comments on these draft forms. How to Contact Us TCEQ - MSW Permits Section P.O. Box MC-124 Austin, TX Phone: (512) Fax: (512)