Working Group #10: 911 Prioritization September, 2012 Jeanna Green, Network Development 911, Sprint, Co-Chair Thera Bradshaw, CEO, TKC Consulting, Co-Chair.

Slides:



Advertisements
Similar presentations
The U.S. Department of Transportation and the Next Generation Jenny Hansen, Contractor – NG9-1-1 Project Coordinator USDOT/NHTSA.
Advertisements

Working Group 8 – E9-1-1 Best Practices March 22, 2012 Robin Howard Chair WG 8 – E911 Best Practices.
Working Group #1: NG9-1-1 September 23, 2011 Laurie Flaherty, Co-Chair Brian Fontes, Co-Chair Patrick Donovan, FCC Liaison.
NANC Report Future of Numbering (FoN) Working Group FoN Tri-Chairs Suzanne Addington, Sprint Kathy Bakke, Wisconsin PSC Mark Lancaster, AT&T September.
Working Group # Prioritization March, 2013 Jeanna Green, Network Development 911, Sprint, Co-Chair Thera Bradshaw, CEO, TKC Consulting, Co-Chair.
Working Group 2: Next Generation Alerting December 16, 2011 Co-Chairs: Damon Penn, Asst. Administrator, Nat’l Continuity Programs, DHS-FEMA Scott Tollefsen,
Working Group 2: Next Generation Alerting September 23, 2011 Co-Chairs: Damon Penn, Asst. Administrator, National Continuity Programs, DHS-FEMA Scott Tollefsen,
Working Group #3 E9-1-1 Location Accuracy December 16, 2011 Craig Frost, Verizon Wireless, Co-Chair Stephen J. Wisely, APCO International, Co-Chair.
3G.IP/ R1 3G.IP 2002 Charter. 3G.IP/ R1 2 3G.IP Mission Statement u Actively promote a common IP based wireless system for third generation.
Working Group 2: Next Generation Alerting March 6, 2013 Co-Chairs: Damon Penn, Assistant Administrator, National Continuity Programs, DHS-FEMA Scott Tollefsen,
Working Group 2: Next Generation Alerting September 12, 2012 Co-Chairs: Damon Penn, Assistant Administrator, National Continuity Programs, DHS-FEMA Scott.
Suggestions for Parlay 4.0 Requirements on Emergency Telecom Services (ETS) An SAIC Company Ravi Jain September 10, 2001 Copyright.
Federal Communications Commission Communications Security, Reliability and Interoperability Council Working Group 6 – Best Practice Implementation Stacy.
Network Reliability Steering Committee (NRSC) Overview and NRSC CAMA Trunk Throughput Optimization Analysis Stacy Hartman – CenturyLink Robin Howard.
WORKING GROUP 4A BEST PRACTICES FOR RELIABLE AND E9-1-1 FINAL REPORT CRAIG W. DONALDSON, SENIOR VICE PRESIDENT REGULATORY AND GOVERNMENT AFFAIRS,
GOMC Organizational Assessment Progress to Date Joan LeBlanc GOMC Council Coordinator.
Working Group #10: 911 Prioritization June 6, 2012 Jeanna Green, Network Development 911, Sprint, Co-Chair Thera Bradshaw, CEO, TKC Consulting, Co-Chair.
Steering Committee Working Group 6 Best Practice Implementation October 7, 2010 Stacy Hartman Steve Malphrus Co-Chairs.
GAC-GNSO Consultation Group On GAC Early Engagement in GNSO PDP London Progress Report 22/06/2014.
Working Group #9 CAP Implementation June 6, 2012 Co-Chair Chris Homer Co-Chair Ed Czarnecki.
Working Group 2: Next Generation Alerting March 22, 2012 Co-Chairs: Damon Penn, Asst. Administrator, Nat’l Continuity Programs, DHS-FEMA Scott Tollefsen,
 Working Group 2: Optimal Approach to NG9-1-1 Architecture Implementation by PSAPs Status Report September 29, 2015.
Working Group 8 – E9-1-1 Best Practices March 6, 2013 Robin Howard Chair WG 8 – E9-1-1 Best Practices.
1 NIIF Summary Report Activities since the NIIF #53 meeting June 28, 2006 Cathie CapitaRobert Schafer NIIF Co Chair.
NANC Report Future of Numbering (FoN) Working Group FoN Tri-Chairs Carolee Hall, Idaho PUC Dawn Lawrence, XO Communications Suzanne Addington, Sprint June.
1 ESIF Task Force 34 Overview/Status* February, 2006 Mike Fargano, Co-Chair Christian Militeau, Co-Chair
MPARWG Business & Disposition of Action Items from MPARWG October 2009 H. K. (Rama) Ramapriyan NASA/GSFC Metrics Planning and Reporting (MPAR) WG 9 th.
Citizen to Government Communications ATIS’ Emergency Services Interconnection Forum (ESIF) Maureen Napolitano ESIF 1 st Vice Chair ANSI-HSSP Workshop Schaumburg,
WG #3 E9-1-1 Location Accuracy September 23, 2011 Craig Frost, Verizon Wireless, Co-Chair Stephen J. Wisely, APCO International, Co-Chair.
ATIS Critical Communications Activities since GSC-18
Fees and Services John Curran President and CEO. Situation Fee Structure Review Panel completed and discharged – Final Fee Structure Review Report released.
Working Group 1: NG9-1-1 December 16, 2011 Laurie Flaherty Brian Fontes WG 1 Co-Chairs.
Communications Technology Group (CTG) Status Report to the Commercial Mobile Service Alert Advisory Committee March 12, 2007 Brian K. Daly, CTG Leader.
1 NIIF Summary Report Activities since the NIIF #61 meeting February 8, 2008 Todd Rodgers Robert Schafer NIIF Co Chair.
Welcome to the NENA Development Conference. Thank You to Our Sponsors!
Work Group 4C Steering Committee Technical Options for E9-1-1 LOCATION ACCURACY October 7, 2010.
1 NIIF Summary Report Activities since the NIIF #48 meeting June 28, 2005 Stu GoldmanRobert Schafer NIIF Co Chair.
Working Group 8 – E9-1-1 Best Practices June 6, 2012 Robin Howard Chair WG 8 – E9-1-1 Best Practices.
Cybersecurity : Optimal Approach for PSAPs
Query Health Distributed Population Queries Implementation Group Meeting October 11, 2011.
Working Group 8 – E9-1-1 Best Practices September 23, 2011 Robin Howard Chair WG 8 – E911 Best Practices.
Working Group 4B: Network Timing Single Source Risk Reduction Status Update September 21, 2015 Jennifer A. Manner, Chair.
Working Group 4A: Submarine Cable Resiliency Status Update
WG 2 Progress Report at TP#9 Group Name: oneM2M TP #9 Source: WG2 leadership Meeting Date: /21 Agenda Item: WG Reports.
Working Group 5: Cybersecurity Information Sharing Status Update December 3, 2015 Christopher Boyer, Co-Chair (AT&T) Rod Rasmussen, Co-Chair (IID) Brian.
Working Group 1: Evolving 911 Services Status Update September 21, 2015 Jeff Cohen, Co-Chair (APCO International) Susan Sherwood, Co-Chair (Verizon)
Working Group 1: Evolving 911 Services Status Update December 3, 2015 Jeff Cohen, Co-Chair (APCO International) Susan Sherwood, Co-Chair (Verizon)
Working Group 8 – E9-1-1 Best Practices December 16, 2011 Robin Howard Chair WG 8 – E911 Best Practices.
Committee on Earth Observation Satellites Brent Smith, CEOS rep to Ministerial WG Plenary Agenda Item #13 29 th CEOS Plenary Kyoto International Conference.
1 Presented by Jim Nixon, Breakout Session Moderator December 15, 2005 Report from Breakout Session #2 Individuals/Organizations to Government.
NANC Report Future of Numbering (FoN) Working Group FoN Tri-Chairs Carolee Hall, Idaho PUC Dawn Lawrence, XO Communications Suzanne Addington, Sprint December.
Working Group 6: Secure Hardware and Software – Security by Design Status Update September 21, 2015 Joel Molinoff, Co-Chair (CBS) Brian Scarpelli, Co-Chair.
Working Group 6: Secure Hardware and Software – Security by Design Status Update December 3, 2015 Joel Molinoff, Co-Chair (CBS) Brian Scarpelli, Co-Chair.
Alert Gateway Group (AGG) Status Report to the Commercial Mobile Service Alert Advisory Committee May 16, 2007 Anthony Melone, AGG Leader.
2 Gordon Barber March 14, 2003 Focus Group Committee Chairs F Cable: John Thrower (Cox Communications) F CLECs: Robert Smith (McLeod USA) F Equipment.
Working Group #10: 911 Prioritization March, 2012 Jeanna Green, Network Development 911, Sprint, Co-Chair Thera Bradshaw, CEO, TKC Consulting, Co-Chair.
Working Group 2: Emergency Alerting Platforms Status Update September 21, 2015 Farrokh Khatibi, Co-Chair (Qualcomm) Francisco Sánchez, Jr., Co-Chair (Harris.
Working Group 8: Priority Services CSRIC V Meeting March 16, 2016 Thomas Anderson, Co-Chair (Cisco) Bill Reidway, Co-Chair (Neustar)
1 First Responder Broadband Communication Technical Gap Analysis Cuong Luu Program Manager Office for Interoperability & Compatibility (OIC) First Responders.
Working Group 1: Evolving 911 Services Status Update March 16, 2016 Jeff Cohen, Co-Chair (APCO International) Susan Sherwood, Co-Chair (Verizon)
National Emergency Communications Plan Update National Association of Regulatory Utility Commissioners Winter Committee Meeting February 16, 2015 Ron Hewitt.
CGMS-43-NOAA-WP-04 Coordination Group for Meteorological Satellites - CGMS Status report of the CGMS Socioeconomic Benefits Tiger Team (SETT) Presented.
ESIF Emergency Services Interconnection Forum (ESIF) Bob Montgomery ESIF 1 st Vice Chair.
1 NIIF Summary Report Activities since the NIIF #55 meeting October 30, 2006 Cathie CapitaRobert Schafer NIIF Co Chair.
Working Group II Terms of Reference Presented to CGMS Plenary and Working Group II CGMS-44 CGMS-WP-30.
Jeju, 13 – 16 May 2013Standards for Shared ICT ATIS Emergency Communications (EC) Standards Development Dr. Farrokh Khatibi Director of Engineering Qualcomm.
Working Group 1: Evolving 911 Services Status Update June 22, 2016 Jeff Cohen, Co-Chair (APCO International) Susan Sherwood, Co-Chair (Verizon)
NANC Report Future of Numbering (FoN) Working Group FoN Tri-Chairs Carolee Hall, Idaho PUC Dawn Lawrence, XO Communications Suzanne Addington, Sprint June.
Focus Group Committee Chairs
ATIS Emergency Communications (EC) Standards Development
Presentation transcript:

Working Group #10: 911 Prioritization September, 2012 Jeanna Green, Network Development 911, Sprint, Co-Chair Thera Bradshaw, CEO, TKC Consulting, Co-Chair

2 Working Group #10: 911 Prioritization  Description:  The working group shall explore ways to ensure the is available when emergencies or disasters cause a surge in mobile network use.  The work will include considerations of how traffic might be prioritized in such situations.  It also includes related operational issues, including ways for PSAPs to address operational issues.  The working group may consider ways to reduce traffic load during emergencies.  such as encouragement of use of 911 text as a lower throughput alternative to 911 voice.

3 Working Group #10: 911 Prioritization  Description Continued:  If the WG pursues arrangements that give 911 calls higher priority than most consumer wireless calls:  the WG may consider how to coordinate 911 priority with other priority calling arrangements, including Wireless Priority Service (WPS), and other arrangements that may provide priority for calls for emergency and first responders.  The WG will address implementations in 4G and earlier generation wireless networks; and will consider both E911 and NG911 implementations

Working Group #10 – Participants  Working Group #10 Members and Organization Charles Cullen, Palo Alto 911 Communication Center Chris Fisher, William Hinkle, Intrado Carl Klein, CenturyLink Kathryn Martin, Access Partnership Joseph Marx, AT&T Ron Mathis, Intrado Peter Musgrove, ATIS Lawrence Rybar, Verizon Jack Shurtz, Cricket Communications Ray Singh, Applied Communication Sciences (formerly Telcordia Technologies) Jim Winegarden, CenturyLink 4

Working Group #10 - Objectives  High level bulleted summary of Objectives  Scope Topics and status – The Working Group will define/categorize different types of emergency & disaster calls. completed – Public Safety Operational Impacts and Considerations, reviewed – Report what is being utilized with the network architectures for prioritization today. completed initial review – Reliability & Resiliency within today’s networks and the varying congestion points within the call flows. completed initial review – Technological advancements and impacts of Long Term Evolution (LTE) and Next Generation (NG911). pending – Consumer education. Completed initial review 5

Working Group #10 - Current Work Activity  WG has held 8 conference calls  Various members have presented contribution for discussion on the following topics  Define disaster categories  PSAP Observations  Network Diagram;  Priority Services Utilized today  for Non-emergency Governmental use  Crafted Draft report outline 6

Working Group #10 - Next Steps  Provide a high level bulleted summary of the next steps,  Continue our Bi-weekly conference calls  Continue to work thru open Action Item list  Working to incorporate current contributions from WG into draft report format  Identify gaps in draft versus overall objectives 7

Working Group # - Project Timeline  Include a project timeline that highlights pertinent dates (e.g., due dates, meetings, etc.)  Completed Draft Review by WG #10: 01/15/2013  Report to Steering Committee: 02/06/2013  Final report to CSRIC members: 02/20/2013  Vote by full CSRIC: 03/06/2013 8