6-1 Goldratt’s Critical Chain  In 1997, Goldratt introduced the Critical Chain Project Management (CCPM) methodology to apply the theory of constraints.
Network Diagramming Network Analysis  The common term for network analysis is PERT  PERT stands for Program Evaluation and Review Technique  The word.
Defining activities – Activity list containing activity name, identifier, attributes, and brief description Sequencing activities – determining the dependencies.
Critical Path and Gantt
Project Time Management
11-1 Critical Chain Project Scheduling Chapter 11 © 2007 Pearson Education.
11-1 ELC 347 project management Week Agenda Integrative Project –4 th part due –Outline of deliverables (posted in WebCT)Outline of deliverables.
Critical Chain Project Scheduling. Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall11-2 Theory of Constraints (ToC) A constraint limits.
Critical Chain Project Scheduling
Copyright © 2013 Pearson Education, Inc. Publishing as Prentice Hall o P.I.I.M.T o American University of Leadership Ahmed Hanane, MBA, Eng, CMA, Partner.
Copyright © 2013 Pearson Education, Inc. Publishing as Prentice Hall Day 21.
2 Project Management  Management of work to develop and implement an innovation or change in an existing organization Examples: –New buildings –Weapon.
Project Management Workshop By Jonathan W. Powell, CGFM, PMP.
Importance of Project Schedules
4.0 CRITICAL CHANGE IN PROJECT MANAGEMENT 4.1 Why should there be need other methods for Project Management to replace or change? Given the level of project.
Project Management Outline of Chapters 1-6. Chapter 1 – Project Management Concepts Definition of a project and its attributes Key constraints within.
Chapter 18 Synchronous Manufacturing and the Theory of Constraints
MANAGING PROJECT RESOURCES
Time Management Week 7 - Learning Objectives You should be able to: n List and describe the processes, activities, inputs, and outputs in time management.
Lesson №2. is the unique activity that has a beginning and an end time, aimed at achieving a predetermined result/goal, the creation of a specific, unique.
Allocating Resources to the Project
Dependent Events and Statistical Fluctuations
4 th European Project Management Conference, London, 6-7 June 2001 Resource Critical Path Approach to Project Schedule Management Vladimir Liberzon, PMP.
Scheduling Sequence & Time.
Introduction to the Theory of Constraints (TOC) & Critical Chain Project Management (CCPM) Major Mark McNabb.
Management Control of Projects Management Control Systems Chapter 16 September 2014Iwan Pudjanegara SE., MM.1.
Critical Chain A Novel by Eliyahu Goldratt Product lifetimes are diminishing fast u Projects to create new products must be shortened drastically u Consider.
Information Technology Project Management, Seventh Edition Note: See the text itself for full citations.
Quick Recap.
Chapter 8 Scheduling © 2012 John Wiley & Sons Inc.
File:CCPGS05 CC present Page: 1 ETXPGS
IS 556 Enterprise Project Management 1IS 556 -Spring 2008 Lecture 2 Apr 7, 2008 //48.
Network Planning Techniques Program Evaluation & Review Technique (PERT): Developed to manage the Polaris missile project Many tasks pushed the boundaries.
More on Scheduling. Recap of Last Class Activity dependencies are shown through CPM/PERT Chart. Critical path Completion date Slack time in non-critical.
Objectives 4 Understand the basic concepts of project planning and control 4 Explain PERT and Timeline (Gantt) charts.
TOC 1 Theory Of Constraints. TOC 2 Theory of Constraints How does TOC differ from the conventional shop control theory? Throughput definition * Emphasis.
SE503 Advanced Project Management Dr. Ahmed Sameh, Ph.D. Professor, CS & IS Introduction.
Chapter 8 Scheduling © 2012 John Wiley & Sons Inc.
VMcG 2/11/02 Critical Chain as an Extension to CPM Vincent McGevna, PMP February 11, 2002
Collecting requirements – Different methods Defining scope – Estimates for all resources Creating the WBS – Different approaches Verifying scope – Formal.
PROJECT PLANNING AND SCHEDULLING
Prepared by Scott M. Shafer, Updated by William E. Matthews and Thomas G. Roberts, William Patterson University Copyright 2007 John Wiley & Sons, Inc.5-1.
Project Time Management
Critical Chain Project Management. Outline Overview of Theory of Constraints Revisit conventional project management (Critical Path Management) Overview.
1 Allocating Resources to the Project Expediting a Project Fast-Tracking a Project Resource Loading Allocating Scare Resources.
Critical Chain A Novel by Eliyahu Goldratt Copyright 1997.
Critical Chain A Novel by Eliyahu Goldratt Copyright 1997.
MARCH 1 Project Management Problem statement l no hurdles, no problem just a goal l open-ended … no single correct answer l closed-ended … single answer.
SE503 Advanced Project Management Dr. Ahmed Sameh, Ph.D. Professor, CS & IS Critical Chain Project Management.
11-1 Critical Chain Project Scheduling Chapter 11 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall.
1 Critical Chain Project Management  A modern approach to dealing with uncertainty in project management (an alternative to PERT)  Developed by Goldratt.
Orlando Critical Chain as an Extension to C P M Orlando A. Moreno, PMP February,
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
Chapter 16 – Project Management
Introduction to the Theory of Constraints (TOC) & Critical Chain Project Management (CCPM) Major Mark McNabb.
McGraw-Hill/Irwin ©2009 The McGraw-Hill Companies, All Rights Reserved
SE503 Advanced Project Management
Critical Chain Project Scheduling
Class 27: Project Management Part II
CHAPTER 6 PROJECT TIME MANAGEMENT
Critical Chain Project Scheduling
SE503 Advanced Project Management
Managing Service Projects
A Novel by Eliyahu Goldratt
CHAPTER 6 PROJECT TIME MANAGEMENT
Synchronous Manufacturing and Theory of Constraints
Presentation transcript:

Midterm Review SE503 Advanced Project Management

Exam Content Closed book, no notes Target time 2 hours Total points 200 Multiple choice 25 x 2 points = 50 points Short answer and problems 90 points Discussion questions 60 points – Compare traditional project management and Critical Chain

Closed book, no notes-Target time 2 hours-Total points 200 Multiple choice 25 x 2 points = 50 points -Planned Task duration always add safty-time within (T/F) -PERT uses three-point-estimates (T/F) Short answer and problems 90 points -What is the relationship between Critical Path and Critical Chain? Discussion questions 60 points – -Compare traditional project management and Critical Chain

Project Management PM history What is a project? – Project types Project elements – Scope, budget, schedule, resources, environment Project life cycle What is project success? Project terminology

Project Justification Project types – Sacred cow – Market driven – Necessary – Economic Project value – Economic return on investment – Kano value model

Traditional Project Management Organize Effort Plan Work (Scope, Budget, Schedule) Obtain and Manage Resources Resolve Conflicts and Problems Control Technical Quality Control Budget Control Schedule

Critical Path Method Tasks Milestones Logical relationships between tasks Project network Critical path Slack

Contracting Single contractor – Fixed bid – Time and material – Incentive fee – Which is best? Multiple contractors – Work for the common good – Incentive fee pool contract

PM Issues Most projects “fail” – Scope (quantity or quality) of work – Budget overruns – Schedule delays Finishing on-time (or early) is a big advantage – Return on investment – Market entry – Resource usage

Uncertainty Difficult estimates/padding/safety Hard to make a firm plan Triggers behavior response – Student’s syndrome – Parkinson’s law Uncertainty modeling – Normal distribution, Beta, triangle, PERT – Assumption of independence

Traditional approach Firm plan Focus on cost often leads to bad decisions Focus on schedule leads to early start Percent complete progress reporting No global focus on return on investment

Theory of Constraints Measurements T, I, and OE Statistical fluctuations, dependent events Synchronize and balance flow Optimize globally – Identify, Exploit, Subordinate, Elevate, Repeat Nelson Wood Shims

Critical Chain Two-point estimates Project and feeder buffers (collected safety) Resource buffers (more feeder buffers and wake-up call) Monitor and manage buffers Progress report work remaining Use TOC on bottleneck resources Reduces Parkinson’s, Students syndrome