July 24, 2015 Board Meeting.

Slides:



Advertisements
Similar presentations
July 15, 2008 – GB Work Session Discussion of Mayor Thomas E. Swisstack’s Priority List Recommendations.
Advertisements

2012 State Board of Directors Orientation “Its good business to do business with an AGC member”
Transportation Border Working Group
Silicon Valley Leadership Group – Transportation Policy Committee (March 5, 2014) David B. Kutrosky, Managing Director Capitol Corridor (Sacramento-Oakland/San.
FTA’s Small Starts Program Charlotte, North Carolina October 11, 2007.
CALIFORNIA HIGH-SPEED RAIL: GETTING ON TRACK Silicon Valley Leadership Group Transportation Committee January 9, 2013.
Developing leaders through service since K E Y C L U B Service Leadership Program Founded in 1925 in Sacramento, California.
CTAA Expo 2009 CTAA Expo 2009 State DOT Roundtable Kimberly A. Gayle, Office Chief Federal Transit Grants Programs Division of Mass Transportation June.
California Transportation Commission Glendale, California July 25-26, 2007 Business Plan 2008 Capitol Corridor Joint Powers Authority (CCJPA)
APTA 2013 MARKETING & COMMUNICATIONS WORKSHOP CRISIS COMMUNICATIONS Capitol Corridor Joint Powers Authority Luna Salaver Public Information Officer CCJPA’s.
OCBC Infrastructure Committee April 8, 2014 LOSSAN Rail Corridor Update Jennifer Bergener – Managing Director, LOSSAN JPA.
Overview CMAA May 29, What is Metro Regional Rail >Manage more than 165 miles of R/W in L.A. County >Develop capital improvement projects and.
ACEforward The new regional initiative to improve our connection between the Central Valley and the Bay Area.
ACEforward ACEforward Stacey Mortensen Executive Director
Port of Oakland. Northern California’s ‘Capitol Corridor’ on Union Pacific Railroad The busiest intercity passenger route in the country outside the NEC.
2015 Interregional Transportation Strategic Plan Active Transportation and Livable Communities August 21, 2014 Scott Sauer.
California Passenger Rail Summit April 29, 2015 LOSSAN Pacific Surfliner Rail Service Update.
October  AB 32 (2006)  Target: Greenhouse Gas (GHG) emissions at 1990 levels by 2020 and maintain reductions  Authorized the Cap and Trade Program.
VIRGINIA RAILWAY EXPRESS SYSTEM PLAN 2040
California State Rail Plan Overview Presentation Tribal Informational Meeting – March 1,
CALIFORNIA HIGH-SPEED RAIL: GETTING ON TRACK Silicon Valley Leadership Group Transportation Committee January 9, 2013.
Anaheim – Los Angeles Project EIR/EIS California High-Speed Rail Authority HIGH-SPEED TRAINS IN SOUTHERN CALIFORNIA Orange County Business Council- Infrastructure.
Minnesota Department of Transportation ARRA, Greater Minnesota Transit, Airport Program Status, & Local Bridge Bonding Update House Transportation Finance.
Anaheim Regional Transportation Intermodal Center Project Update.
Program Update Baltimore MPO November 25, Internal Draft AGENDA  Program Overview  Alternatives Development  Stakeholder and Public Outreach.
PASSENGER RAIL PROGRAM DEVELOPMENT PEER SESSION ______________________ CAPITOL CORRIDOR: A RECIPE FOR SUCCESS 2011 AASHTO SCORT Meeting David B. Kutrosky.
October 27, 2005 Contra Costa Operational Area Homeland Security Strategic and Tactical Planning and Hazardous Materials Response Assessment Project Overview.
Michigan’s Roads Crisis: Study Findings, Conclusions and Where Do We Go From Here? Best Practices Conference Rick Olson, State Representative, 55 th District.
Intercity Rail Background/ Statewide Freight and Passenger Rail Plan Update Met Council TAC Meeting November 5, 2008.
March 27, 2015 Board Meeting. San Joaquin Joint Powers Authority Item 1 Call to Order Pledge of Allegiance Roll Call.
December 12-13, 2007 Item 4.4 Tab 31 California State Rail Plan to
CCJPA Sacramento to Roseville 3 rd Track Project Sacramento Stakeholder Advisory Committee (SAC) Meeting #1 HDR Office Tuesday, May 20, :00 - 9:00.
September 26, 2014 Board Meeting. San Joaquin Joint Powers Authority Item 1 Call to Order Pledge of Allegiance Roll Call.
September 19 & 20, 2007 Items 4.11a,b, & c Tabs 15, 16, & 17 Proposition 1B Intercity Rail Bond Program.
2009 State Board of Directors Orientation. Organizational Overview Mission Statement Staff Mission Statement Principals Membership Service Area Offices.
Briefing on the Washington Metropolitan Area Transportation Operations Coordination (MATOC) Program Presentation to the Transportation Planning Board Michael.
Capitol Corridor: A Performance-Based Management Model FRA Best Practices - State IPR Corridor Management AASHTO – SCORT Annual Meeting, Washington DC.
California’s Intercity Passenger Rail Network National Model Highest Ridership of Any State VMT Reduction of 355 M Annually $175 M in Annual Wages $4 B.
California High-Speed Train Project California High-Speed Rail Metro Bus Operations Subcommittee January 2010.
1 Round One Public Outreach Workshops Fall 2005 DRAFT Bay Area Regional Rail Plan August 2007 Workshops.
The Life of a Policy Council Member
Workshops on Discussion Draft of Guidelines December 2014.
May 15, 2015 Board Meeting. San Joaquin Joint Powers Authority Item 1 Call to Order Pledge of Allegiance Roll Call Oath of Office.
Managing Travel for Planned Special Events: What, Why, & Benefits Walt Dunn, P.E. Dunn Engineering Associates, P.C. Talking Operations Seminar January.
Rebecca Nickleson, MS, CRA Assistant Director Office of Research & Sponsored Programs.
Rebecca Ramirez, J.D., M.H.A. Associate Director for Operations SPCAA Head Start and Early Head Start October 2, 2010.
March 28, 2014 Board Meeting. San Joaquin Joint Powers Authority Item 1 Call to Order Pledge of Allegiance Roll Call.
1 High-Speed Rail Evaluation October 12, 2007 Planning Committee.
TIFIA Credit Program Overview Updated October 2012 T ransportation I nfrastructure F inance and I nnovation A ct (TIFIA)
Oregon Passenger Rail Leadership Council Meeting June 6, 2012.
FRYSC Advisory Councils Partners in Progress
1 Presented to the Transportation Planning Board October 15, 2008 Item 9 Metrobus Priority Corridor Network.
PRESENTED BY PRISCILLA MARTINEZ-VELEZ CALIFORNIA DEPARTMENT OF TRANSPORTATION DIVISION OF TRANSPORTATION PLANNING SACRAMENTO, CA (916)
11 Cap-and-Trade Auction Proceeds Funding Guidelines for Agencies that Administer California Climate Investments September
THE EL MONTE HOV / BUSWAY: A Policy Driven Experiment in Congestion Management Frank Quon Division of Operations Deputy District Director HOV LANES IN.
CHSRA SMALL AND DISADVANTAGED BUSINESS ENTERPRISE PROGRAM Society of American Military Engineers (SAME) Thursday, November 8, 2012.
School Site Council (SSC) Essentials in brief An overview of SSC roles and responsibilities Prepared and Presented by Wanda Chang Shironaka San Juan Unified.
INVESTMENT IN MENTAL HEALTH WELLNESS GRANT PROGRAM INVESTMENT IN MENTAL HEALTH WELLNESS GRANT PROGRAM CALIFORNIA HEALTH FACILITIES FINANCING AUTHORITY.
Nathan Smith Co-Project Manager California State Rail Plan March 7, 2012.
Guide to Greenhouse Gas Reduction Fund Program Designs, Expenditures, and Benefits December 2, 2015 Kelsey Jessup Project Manager.
California Intercity Passenger Rail Service Governance: Local Authority American Public Transportation Association December 2, 2015.
Freight Mobility Strategic Investment Board. Making the Case… – Freight community educated legislators - developed champions Creation of.
Caltrans Transportation Planning Grant Programs: Partnership Planning & 5304 (formerly 5305) Transit Planning Presented by Priscilla Martinez-Velez California.
For Presentation at 28 th APEC Transportation Working Group Meeting Vancouver, Canada Walter Kulyk Director, Office of Mobility Innovation Federal Transit.
Commuter Rail Studies Summary of MAG High Capacity Transit Study June 2003 Commuter Rail Summary.
GOODS MOVEMENT COLLABORATIVE AND GOODS MOVEMENT PLAN 1 Goods Movement Collaborative and Goods Movement Plan Final Plan Alameda County Transportation Commission.
New Director Orientation Child Support Directors Association CSDA.
Los Angeles – San Diego – San Luis Obispo Rail Corridor Update
FEBRUARY 2017 BOARD MEETING RECAP.
Presentation transcript:

July 24, 2015 Board Meeting

San Joaquin Joint Powers Authority Item 1 Call to Order Pledge of Allegiance Roll Call Oath of Office

San Joaquin Joint Powers Authority Item 2 June 29 Signing of Interagency Transfer Agreement Chair Pedrozo & Dan Leavitt

June 29 Signing of ITA

June 29 Signing of ITA

June 29 Signing of ITA On June 29, 2015 Caltrans Director Malcolm Dougherty and SJJPA Chairperson John Pedrozo signed the Interagency Transfer Agreement (ITA). Management of the San Joaquin intercity passenger rail service to SJJPA became effective on July 1, 2015. Caltrans and the LOSSAN agency concurrently signed the ITA to transfer management of the Pacific Surfliner intercity passenger rail service to the LOSSAN agency.

June 29 Signing of ITA The full signed SJJPA ITA is available on the SJJPA webpage at: www.acerail.com/sjjpa The completion of the ITA is a substantial achievement (over 500 pages in length with Appendices). The ITA could not have been completed without the efforts and commitment from CalSTA and Caltrans. Chad Edison, Deputy Secretary of Transportation for CalSTA, and Bruce Roberts, Chief of Caltrans Division of Rail and Mass Transportation

June 29 Signing of ITA Special Recognition for: Kristina Assouri, Deputy Attorney with Caltrans Legal Division and Crystal Ortiz, Rail Transportation Manager with Caltrans, Division of Rail and Mass Transportation They were brought on late in the process by Caltrans to get the two ITAs completed. SJJPA Letter to the Director of Caltrans regarding the SJJPA’s appreciation of Kristina’s and Crystal’s exceptional work in getting the SJJPA ITA completed and signed prior to the deadline.

San Joaquin Joint Powers Authority Item 3 Presentation by City of Sacramento Council Member Steve Hansen

San Joaquin Joint Powers Authority Item 4 Consent Calendar 4.1 Approve Minutes from May 15, 2015 Board Meeting 4.2 Approve Next SJJPA Board Meeting Location and Start Time September 18, 2015: Merced at 1:30 pm

San Joaquin Joint Powers Authority Item 5 Public Comments

San Joaquin Joint Powers Authority Item 6 Presentation by BNSF: San Joaquin Performance, Projects, & PTC Rick Depler

San Joaquin Joint Powers Authority Board Meeting BNSF Passenger Operations Friday, July 24, 2015 Rick Depler BNSF Assistant Director Passenger Operations

Passenger Operations Vision Statement “To be the best Passenger Operations Team in the industry - measured by safety, on-time and incentive earned – composed of highly trained, highly motivated personnel, committed to continuous improvement and capable of fully realizing the potential of the passenger operator agreements while protecting the BNSF freight franchise.”

BNSF Yearly Contractual OTP 2005 through July 22, 2015

BNSF Yearly Contractual OTP 2015 Jan-Jul 22

(05” basic tolerance,16” recovery) Passenger Train Speed Restrictions – daily average per week – July 2014 – July 2015 Tie gang Heat Restrictions 21” total (05” basic tolerance,16” recovery) 13” total (05” basic tolerance, 08” BNSF ½ recovery time)

(05” basic tolerance,16” recovery) Passenger Train Speed Restrictions – daily average per week – July 2014 – July 2015 Tie gang Heat Restrictions 21” total (05” basic tolerance,16” recovery) 13” total (05” basic tolerance, 08” BNSF ½ recovery time)

BNSF Contractual OTP Per train for - July 1-22, 2015

(05” basic tolerance,16” recovery) Passenger Speed Restrictions – daily average per week – May – July 2015 Heat Restrictions 21” total (05” basic tolerance,16” recovery) 13” total (05” basic tolerance, 08” BNSF ½ recovery time)

(05” basic tolerance,16” recovery) Passenger Speed Restrictions – daily average per week – May – July 2015 Heat Restrictions 21” total (05” basic tolerance,16” recovery) 13” total (05” basic tolerance, 08” BNSF ½ recovery time)

(05” basic tolerance,16” recovery) Passenger Speed Restrictions – daily average per week – May – July 2015 Heat Restrictions 21” total (05” basic tolerance,16” recovery) 13” total (05” basic tolerance, 08” BNSF ½ recovery time)

Operating Challenges MOW overstay Train Volumes MOW Production On-line congestion Yard congestion Major MOW windows MOW overstay Train Volumes MOW Production 4/23/2017

Operating Challenges continued… Mudslides Heat/Cold restrictions Blizzards High Winds/Flash flooding Weather Derailments Track/signal issues Trespasser incidents Service Interruptions 4/23/2017

Operating Challenges continued… Amtrak crew issues on line Amtrak locomotive failure Amtrak equipment failure Slow Orders Permanent speed restrictions Temporary Temporary speed restrictions Amtrak failure 4/23/2017

Summary Challenges On-going new dispatcher training/development. MoW planning Signal issues Schedule

Network Operations Center 4/23/2017

San Joaquin Joint Powers Authority Item 7 Ratify State-Amtrak Intercity Passenger Rail Committee Representative & Alternate Brian Schmidt

Ratify State-Amtrak Committee Reps. SJJPA was invited to participate in the “State- Amtrak Intercity Passenger Committee” The Committee will be comprised of participating representatives and members of each state and public entity that sponsors a state-supported intercity service, and representatives from Amtrak and the Federal Railroad Administration.

Ratify State-Amtrak Committee Reps. This Committee will aid in negotiations, decision- making and planning for the benefit of the state- supported intercity services and will address issues related to the cost methodologies of the services provided by Amtrak. As the Managing Agency for the San Joaquin rail service, the SJJPA could designate one State Representative and one Alternate.

Ratify State-Amtrak Committee Reps. On July 6, 2015, Chairperson Pedrozo appointed Stacey Mortensen, Managing Director as the Representative for SJJPA and Brian Schmidt, Director of Operations for SJJPA as the Alternate. The Committee held its first meeting on July 9, 2015 and SJJPA was represented by Stacey Mortensen and was appointed to the Reports Sub-Working Group and the 514 Equipment Capital Group.  

Ratify State-Amtrak Committee Reps. Fiscal Impact: There is no fiscal impact.   Recommendation: Ratify the Chairperson’s appointment of Stacey Mortensen as SJJPA representative to the Committee and Brian Schmidt as the Alternate to the Committee.

San Joaquin Joint Powers Authority Item 8 San Joaquin Operations Update Brian Schmidt

San Joaquin Update State Working Group - Working on the New Generation Locomotive Procurement with Caltrans, CCJPA and Amtrak. Delivery of the first of 6 locomotives to Northern California is scheduled for July 2016. The working group has three (3) sub-committees for the project: Production/Schedule Delivery & Testing, and Operations and Servicing. Participating with the time checks between stations on the San Joaquin Corridor to create a revised and reduced schedule for the train service. This is scheduled to be completed in August.

San Joaquin Update Working on identifying Minor Capital Projects at Stations on the corridor in coordination with Caltrans and Amtrak. Participate on the daily morning calls for the San Joaquin Service. Beginning to receive text and email alerts regarding San Joaquin and Capitol Corridor Service trains. Working with Caltrans and Capitol Corridor to develop a plan defining Equipment Maintenance responsibilities in the Oakland Facility and at outlying locations in Bakersfield and Sacramento

San Joaquin Rolling Stock Update Train Delays for October through June Near Miss Incidents - 41 Average Delay 6 minutes Vehicle on Tracks - 56 Average Delay 37 minutes San Joaquin Incidents - 13 Average Delay 76 minutes (24 trains delayed due to the 13 incidents) Other Train Incidents - 17 Average Delay 82 minutes (BNSF, UPRR & CCJPA)

San Joaquin On Time Performance

San Joaquin On Time Performance San Joaquin OTP Oct. 1 thru July 12, 2015 Trains Operated - 3,458 Trains On-Time - 484 Trains Late - 974 FY Year OTP - 71.8% July OTP - 81.3%

FY 2015 Ridership Ridership Year-to-date vs. Projected % FY15 Projected Diff San Joaquin 873,007 916,700 -4.8 Capitol Corridor 1,099,296 1,059,100 +3.7 Pacific Surfliner 2,030,858 1,968,200 +6.0

San Joaquin Joint Powers Authority Item 9 Amtrak 2015-16 Operations Contract Brian Schmidt

San Joaquin Joint Powers Authority Item 10 SJJPA Marketing and Outreach Update Karlha Davies

San Joaquin Joint Powers Authority Marketing goals by next Board Meeting Hire staff (1 full time position) Partner with Caltrans Division of Rail and Mass Transportation to ensure a smooth transition plan from Amtrak California and discuss TMD Marketing Contract Develop strategic deliverables for Marketing & Outreach goals in business plan and focus on 2 corridor communities

San Joaquin Joint Powers Authority 3 Month Goals Develop RFP for SJJPA.com website development Develop RFP for graphic designer Develop RFP for outreach community representatives Transition social media from Amtrak California to San Joaquin JPA

San Joaquin Joint Powers Authority Item 11 San Joaquin Valley Rail Committee Dan Leavitt

San Joaquin Valley Rail Committee The purpose of the SJVRC is to discuss and formulate plans, suggestions, and ideas for changes and improvements to passenger trains service in the San Joaquin Rail Corridor and then pass these on to SJJPA. Per the May 15, 2015 SJJPA Board action, before the SJVRC can report to the SJJPA, the SJVRC will need to convene and take action to change their By Laws.

Recommended Edits to SJVRC Bylaws “Regular Members must be a resident of the county they represent and cannot be an elected official. Regular Members cannot be staff of SJJPA Member Agencies or SJJPA staff.” “The SJJPA may select up to four (4) additional Regular Members who reside in counties outside of the those counties listed above that are served by San Joaquin Thruway bus services and/or represent areas that could be served by future extensions of the San Joaquin (as indentified in the latest SJJPA Business Plan).”

Recommended Edits to SJVRC Bylaws There will be no “Associate Members” or “Agency Associate Members”. Regular Members and their respective Alternates shall be appointed by the SJJPA. The Committee shall meet 2-4 times a year, at the time and place designated by prior minute order of the Committee. Special Meetings may be called by the Chairperson or upon the request of any six (6) Regular Members if approved by the Chairperson of SJJPA.

San Joaquin Valley Rail Committee There are a number of vacancies currently with the SJVRC. A number of Members have left their service with the SJVRC (including several SJJPA Board Members and Alternates) and have not been replaced. With the recommended changes to the By Laws, there will be many more openings available on the SJVRC.

San Joaquin Valley Rail Committee  Alameda County: 1 open; 2 after By Laws changed Contra Costa County: 1 appointment open Fresno County: 0 open; 1 after By Laws changed Kern County: 0 open; 1 after By Laws changed Kings County: 1 open; 2 after By Laws changed Los Angeles County: No appointments open

San Joaquin Valley Rail Committee Madera County: 0 open; 2 after By Laws changed Mariposa County: 1 open; 2 after By Laws changed Merced County: 2 appointments open Sacramento County: 1 open; 2 after By Laws changed San Joaquin County: 0 open; 2 after By Laws changed Stanislaus County: 0 open; 1 after By Laws changed Tulare County: 0 open; 1 after By Laws changed 

San Joaquin Valley Rail Committee Fiscal Impact: There will be some staff hours needed to provide staffing for the SJVRC. However, this is an anticipated activity of SJJPA staff and is not expected to impact the proposed budget of the SJJPA.

San Joaquin Valley Rail Committee Recommendation: Approve the suggested changes to the San Joaquin Valley Rail Committee By Laws. Direct staff to work with SJJPA Member Agencies to provide recommendations to the SJJPA for new SJVRC Members & Alternates.

San Joaquin Joint Powers Authority Item 12 Northern California Mega-Region Study Dan Leavitt

Northern California Mega-Region Study The Bay Area Council Economic Institute is planning on doing a study focused on “The expansion of the Northern California Mega Region and the role of the Sacramento Area’s growing innovation ecosystem”. The Institute is a partnership of business with labor, government, higher education, and philanthropy.

Northern California Mega-Region Study A key question guiding the study: As the Northern California Mega Region continues to grow, what new infrastructure needs are emerging to support the growing economic activity?

Northern California Mega-Region Study The work will examine the growing housing crisis in the Bay Area and how the Northern San Joaquin Valley is providing housing for people who live and work in the Bay Area and Sacramento. A focus of the work will be the increased pressure on key roadways such as I-5, I-580, I-680, I-880 and I-80 and the role that the expansion of the Capitol Corridor and ACE can play in supporting the Mega Region.

Northern California Mega-Region Study The scope of their work initially focused predominately on the 1-80 corridor (Sacramento – Bay Area) the Capitol Corridor Joint Powers Authority is helping to fund the study. ACE is expecting to be a participant in the study and the scope has been revised to include the ACE service and ACE expansion program.

Northern California Mega-Region Study Staff is under discussion with the Bay Area Council Economic Institute regarding the potential for the study to include the San Joaquin Service. Additional focus on the connection between the Northern San Joaquin Valley and Sacramento, and the Northern San Joaquin Valley to the Bay Area via San Joaquin Corridor.

Northern California Mega-Region Study This study should investigate the potential economic impacts of the San Joaquin improvements proposed in the SJJPA 2015 Business Plan Update including: More frequent San Joaquin service, San Joaquin service that arrives in the Bay Area and Sacramento in the early morning (utilizing mid-corridor starts), The extension of the San Joaquin service to Oakland Coliseum/BART (Oakland Airport).

San Joaquin Joint Powers Authority Item 13 CIPR Leadership Coalition Update Dan Leavitt

CA Intercity Passenger Rail Leadership Coalition

CIPR Leadership Coalition Update 17 California State Senators (including Senator Galgiani, Senator Cannella, and Senator Pan from the San Joaquin Corridor) are advocating for at least $500 million annually in funding from the Greenhouse Gas Reduction Fund to the TIRCP or increase the funding percentage from 10% of ongoing Cap & Trade funds to 20% to support the expansion of transit and intercity rail services throughout California.

CIPR Leadership Coalition Update The Assembly Select Committee on Rail will be holding a hearing on August 21, 2015 at 10:00 am in Modesto (1010 10th Street, Modesto City Hall/Stanislaus County Chambers): This hearing will focus on the improvement and expansion of the San Joaquin and Altamont Corridor Express rail services. The members of the Senate Select Committee on Passenger Rail and other member of the Legislature from the San Joaquin Valley will be invited.

San Joaquin Joint Powers Authority Item 14 Administrative Matters or Announcements Correspondence Dan Leavitt

Correspondence On June 30, 2015 CalSTA announced the recipients of the first round of the Transit and Intercity Rail Capital Program (TIRCP) for Cap & Trade. The Capitol Corridor JPA was awarded $4.62 million for a travel time reduction/track improvement program in the Bay Area. This program will result in a 3-minute travel time savings for San Joaquin passengers traveling to Oakland.

Correspondence CalSTA informed the SJJPA that the $21.5 million “Stockton-Escalon Double Track Segment 4” project (SJJPA’s major application) did not receive Cap & Trade funding since it will be fully funded through the State Transportation Improvement Program (STIP).

San Joaquin Joint Powers Authority Item 15 Board Members Comments

San Joaquin Joint Powers Authority Item 16 Adjournment

July 24, 2015 Board Meeting