Www.eulis.eu Latvian Presidency PCC conference 2015 EULIS: Update on the Interconnection of Land Registers and Cadastres 12-13 May, 2015, Riga Rik Wouters.

Slides:



Advertisements
Similar presentations
The e-Justice Portal and the interconnection of land registers – state of play ELRA General Assembly 16 May Barcelona Dick Heimans Deputy Head of Unit.
Advertisements

The e-Justice Portal and the interconnection of land registers – state of play Dick Heimans Deputy Head of Unit B2 – DG JUST.
1 Making legislation work better for citizens and business The IMI NETWORK Bucharest, 23 rd June 2008 Presentation.
The merger of Cadastre and Land Registration in a wider perspective Rik Wouters Member of the Bureau WPLA Managing Director EULIS.
We’re here for you. “European Exchange of Best Practice in Arson Investigation and Prevention” European exchange of best practice in arson investigation.
Ministry of Justice of North Rhine-Westphalia Weaving the Network of Registers – e-Justice Budapest, June 14th 2010.
AGRI-MIGRATION WEBSITE A webpage for Migrant Workers inside
1 Survey Data in ECA : Frequency, Coverage, Consistency and Access By Victor Sulla ECS-PE.
Decentralised and Remote Access to Confidential Data in the ESS (ESSnet DARA) Overview and State of the Art Maurice Brandt Destatis FIRST EUROPEAN DATA.
CONNECTING YOU TO THE AUTHORITATIVE GEO-INFORMATION FRAMEWORK FOR EUROPE Copyright ©2013 EuroGeographics Challenges for Cadastre.
INTEROPERABILITY IN LAND REGISTERS Jorge López Fernández Secretary General of ELRA Dublin 21th of June of 2013.
Vision for EULIS’ future and the part Land Registry organisations play Alasdair Lewis.
Developments in EULIS PCC conference June 21 th 2013, Dublin Rik Wouters Managing Director EULIS EEIG.
European integration 1www.ecb.europa.eu © Progress of European integration 1952ECSC European Coal and Steel Community 1958 EEC and EURATOM European Economic.
European Union The Gay Perspective SCOREBOARD V 2.0.
European e-Justice « Justice at a click »
Directive 95/50/EC TDG Checks Application of Annexes Erkki Laakso EUROPEAN COMMISSION DG ENERGY & TRANSPORT TDG Checks Riga June 2006.
E-SENS Electronic Simple European Networked Services WP2 kick off Berlin, Germany Apr 10th 2013.
1 The Internal Market Information System (IMI) A tool enabling more mobility for health professionals AER Breakfast Briefing Brussels, 12 November 2009.
SUMMARY UNDER THE LATVIAN PRESIDENCY OF THE PCC 1st Semester 2015 Elita Baklane – Ansberga Director General The State Land Service PCC Plenary Meeting.
WPLA workshop Interconnection of Land Registers in Europe: a threat or an opportunity for EULIS? Vienna, Austria October 2014 Rik Wouters.
Seminar CEJA – 20 th September 2010 Michael Gregory EN RD Contact Point State of play of CAP measure “Setting up of Young Farmers” in the European Union.
EIPA CAF Resource Centre CAF CAF activities – state of affairs Patrick Staes & Ann Stoffels EIPA CAF Resource Centre Berlin, 8-9 February 2007.
STATE OF PLAY : ESF FINANCIAL EXECUTION. 2 Overall 2012 ESF Budget Execution on 20/11/2012 Programmin g period 2012 Payment appropriation s mil.€ 2012.
1 Conference and Plenary Meeting of the PCC Paphos 30 st November 2012.
© World Energy Council 2014 Energy Security in Focus: from Local to Global The Baltic States as the testing ground for more balanced energy policy Einari.
State of play of OP negotiations and OP implementation ESF Technical Working Group Luxembourg, 2 December
Learning Network: Looking forward Maarten Smorenburg Acting Director NSIR, Chairman Learning Network Towards a Digital Platform Hans van Ek Senior Advisor.
EIE- Surveyor 1 Financial aspects ► 40 % amount 45 days after initial contract (about December2005) ► 40 % 45 days after approval of the progress report.
Report from COEN CAMD Krakow 27 – 28 October 2011 Lars Johansson.
European Commission / Taxation and Customs Union June 2009 UNECE REGIONAL CONFERENCE ON TRADE FACILITATION 1 Single Window European Commission.
European Business Register Seminar European e-Justice en e-Codex Ministerie van Veiligheid en Justitie Den Haag, 12 maart 2012 Ricco Dun, Kamer van Koophandel.
M O N T E N E G R O Negotiating Team for the Accession of Montenegro to the European Union Working Group for Chapter 2– Freedom Movement for Workers Bilateral.
Land Register Interconnection portal: a bridge to Europe EULIS-PCC conference May 2017 Rik Wouters MD EULIS Valetta, Malta May 5th 2016.
TRADE CONTACT GROUP Brussels 9th June 2009 Agenda item 3a) State of play of IT systems: Import Control System (ICS); Export Control System (ECS); New.
2010, European Year for combating poverty and social exclusion
EULIS (European Land Information Service)
15-16 November 2017 Valenciennes, Cité des Congrès
ESF transnational calls – Member State plans
Working Group on Data, information and knowledge exchange
4th meeting of the MIG permanent policy sub-group (MIG-P)
Kristina Dourmashkin Eurostat Unit E4
ESF FINANCIAL EXECUTION PART 1 STATE OF PLAY END 2016
Marine Strategy Framework Directive:
The merger of Cadastre and Land Registration in a wider perspective
CAF Activities.
Adult Education Survey
Presentation of the EHS project
Marine Strategy Framework Directive: Transposition and Implementation
ESF FINANCIAL EXECUTION ESF Technical Working Group Meeting June 2018
Governance, Information & Reporting (DG ENV D4)
Marine Strategy Framework Directive: Transposition and Implementation
Marine Strategy Framework Directive: Status of reporting
Overall 2011 ESF Budget Execution
ESF FINANCIAL EXECUTION ESF Technical Working Group Meeting June 2018
European Insolvency Regulation
Marine Strategy Framework Directive: Status of reporting
Marine Environment and Water Industry Unit
ETS Working Group meeting 24-25/9/2007 Agenda point 7 CVTS3 brief update /09/ 2007 ETS working group.
Marine Strategy Framework Directive: Status of reporting Art. 8/9/10
Marine Strategy Framework Directive: Transposition and Implementation
Agenda item 6.1 MID-TERM REPORT OF THE EU 2020 BIODIVERSITY STRATEGY
DG Environment, Unit D.2 Marine Environment and Water Industry
ESF FINANCIAL EXECUTION ESF Technical Working Group Meeting June 2018
Legal and implementation issues update
European Statistical Training Programme (ESTP)
Marine Strategy Framework Directive: Status of reporting
Project objectives and benefits
DG Environment, Unit C.2 Marine Environment and Water Industry
Daniel Suranyi, Krassimir Ivanov
Presentation transcript:

Latvian Presidency PCC conference 2015 EULIS: Update on the Interconnection of Land Registers and Cadastres May, 2015, Riga Rik Wouters Managing Director EULIS

Registration Authority

Agenda Interconnection program Progress of work Commission EULIS’ view on interconnection project

Interconnection Program The goals of DG Justice to interconnect all land registers and cadastre to build a service-portal in the e-Justice web-site Feasibility study into interconnection LR’s Overview of situation in 28 member states presents 3 alternatives solutions for portal: 1.Complete rebuild 2.Hybrid solution 3.EULIS as basis Analysis of required functionality of the portal

Interconnection Program WP for e-Justice: January 2015 meeting 18 countries support initiative for interconnection 12 countries interested to connect Majority agree EULIS as basis for solution Commission decided to start a project To migrate and upgrade EULIS To connect 12 countries Status: Dick Heijmans (Director of the program) asked for approval and budget. Decision expected by June 2015

Progress on the connections 12 Member States willing to participate in the EU- connection project: –Existing connections: AT, IE, LT, ES, SE, NL –New connections: FI, EE, BG, LU (cadastre), PT and N- Ireland NB: –England & Wales: will soon decide on reconnection –Macedonia: in process of connection And 18 countries are supporting the initiative –Malta, Latvia, Hungary, Cyprus, Croatia and Romania have indicated interest: connection possibly in the future

Overview members and connections + Luxembourg, Bulgaria, Portugal, N-Ireland  Total 14 New connections Existing connections

Connect the countries Commission decided to carry out Pilot –No clear communication about pilot, but plan is to connect MS’s to EULIS  this was not clear to all participants –Not well defined scope (including new portal?) –Approval Director General –Budget more than 500K€  approval DG ECFIN 3 groups for connection: –already connected countries--> “reconnection” –new connections: full live connections –parallel connections E&W and MK Challenge: new countries have different conditions –payed service free of charge; –Authorised access open access

Migration of the portal When? -Before or after upgrade of the EULIS-functionality -Before or after the connection of countries Under what conditions? -All maintenance and exploitation of portal by COM -Content reference info and glossary: member organisations -Ownership website EEIG Technical architecture of solution? -Very similar to present situation?! -Open access for non-member states and users

Interconnection project: EULIS view Define project: goal, scope, result, (fin) resource, communication Scope: –Migration and upgrading EULIS –Connection of countries –Arrange ownership incl technical and functional maintenance Basic questions: –In what order to migrate and connect?  First to connect –How to upgrade the functionality of the portal  Keep it simple –What is role of EULIS EEIG during and after the project? Prepare detailed plan for implementation (activities, resources, timing)

Strategy for connection Make it as simple as possible –Only technical connection –A-synchronic connection if required: like Spain –Payment module makes it complex How to avoid the payment module: –No payment for information –EU take cares for payment: budget financing –Credit card payment: appears a good alternative Later in time further upgrade of functionality

Connection of countries 3 phases: Preparatory activities –Overall plan –Answer the questions (order of work, functionality) –Check situation of connecting countries –Analyse result and requirements –Communication Central level activities –Prepare detail plan for EULIS upgrade –Implement upgraded portal Country level –Prepare connection plan –Upgrade IT solution MS and other provisions –Connect the country to the portal

Migration of EULIS Design architecture of the new portal Decision of the WP e-Justice: EULIS+ Nb: feasibility report gives no details about design Nb: assumption that new portal has no (major) consequences for the existing connections Determine the functionality of the portal –2 steps: simple upgrade to accommodate new connections Develop more functionality based on need analysis

Portal architecture (schematic) website National portal User

EULIS EEIG position EU-CommissionEULIS-EEIG What relation? EU-countries via Working Party Wishes Non EU-countries Wishes Users Connected Members What is the role of EULIS during and after the project? Service providers

Thank you for listening!! More info: or