Bidders’ conference IT-4123 Supply, Replacement and Repair of Crane Rails Introduction to CERN and rails consolidation program Handling Engineering Group.

Slides:



Advertisements
Similar presentations
Accelerating Science and Innovation Welcome to CERN.
Advertisements

CERN an (unusual) introduction Rolf-Dieter Heuer Director-General, CERN India and CERN – Visions for Future Collaboration Mumbai 28 February 2011.
Directorate General for Energy and Transport European Commission Directorate General for Energy and Transport Progress in the Electricity and Gas Single.
Welcome to CERN Accelerating Science and Innovation 2 nd March 2015 – Bidders Conference – DO-29161/EN.
Research Training Opportunities at CERN Paula Eerola Helsinki Institute of Physics and Dept of Physics
Welcome to CERN Research Technology Training Collaborating.
Knowledge Management LXV International Council Meeting Qawra, Malta 16 th - 23 rd of March 2014.
Accelerating Science and Innovation. Science for Peace CERN was founded in 1954 as a Science for Peace Initiative by 12 European States Member States:
European Federation of Engineering Consultancy Associations.
From Open Science to (Open) Innovation Markus Nordberg, Marzio Nessi (CERN) About CERN, Open Physics, Innovation and IdeaSquare.
CERN Enrico CHIAVERI Head, Human Resources Department 22 June 2009.
Welcome – Benvenuti Carlo Verdone to Accelerating Science and Innovation to Accelerating Science and Innovation.
Rackspace Analyst Event Tim Bell
THE EUROPEAN UNION. HISTORY 28 European states after the second world war in 1951 head office: Brussels 24 different languages Austria joined 1995.
UEMS ORL TREASURY REPORT October 2012 M. de la Mota, F. Marchal.
Organization, Projects and Activity Forecast 2012 Oliver Böttcher, 29 th of March 2012 EN-HE-HM Handling Maintenance Section at CERN.
3rd Libera Users Meeting
April 23rd-24th 2013Handling Engineering Group. Introduction to CERN April 23rd-24th 2013Handling Engineering Group2  CERN: European Organization for.
Natural gas, and oil sectors in Europe Vaidotas Levickis Fort Worth, Texas 2015.
WelcomeWelcome CSEM – CERN Day 23 rd May 2013 CSEM – CERN Day 23 rd May 2013 to Accelerating Science and Innovation to Accelerating Science and Innovation.
CERN as a World Laboratory: From a European Organization to a global facility CERN openlab Board of Sponsors July 2, 2010 Rüdiger Voss CERN Physics Department.
European Molecular Biology Laboratory: An overview
EN-HE Group meeting 19 th June 2015 I. Rühl / EN-HE.
CERN openlab Overview CERN openlab Introduction Alberto Di Meglio.
Brocade Flow Optimizer CERN openlab
CERN IT Department CH-1211 Genève 23 Switzerland 3 rd Meeting of the GEANT Experts group Brussels, 10 March 2011 Frédéric Hemmer CERN IT.
SFT News 16 th June CERN/FC/5806/RA2 Return Coefficient Industrial return Austria Belgium Bulgaria Switzerland.
Where? Who? When? What? Why? (How?) Ray Barrett X-ray Optics Group
Stakeholder Relations at Large-Scale Infrastructures The CERN Model Rolf Heuer 7 th Canadian Science Policy Conference, Ottawa, 26 November 2015.
BUDGET 2012 EN-HE 29/03/ EN-HE CONTRACT LIST - OPERATION7’190 KCHF - PROJECT1’738 KCHF - CONSOLIDATION 4’239 KCHF JMS.
Country EPS-12 Total (with ICPS) Hungary7979 Germany5559 Romania3841 Ukraine2527 United Kingdom1930 Finland1842 France1616 Italy1616 Poland1313 Switzerland1314.
BIDDERS’ CONFERENCE IT-3981 Dismantling, Refurbishment, Replacement and Supply of Electrical Overhead Travelling Cranes Over 10 Tons Capacity January.
BIDDERS’ CONFERENCE IT-3976 Provision of Specialized EOT Crane Maintenance Services on the CERN Site May 5 th 2014 Handling Engineering Group2 Introduction.
CERN openlab Overview CERN openlab Summer Students 2015 Fons Rademakers.
The Mission of CERN  Push back  Push back the frontiers of knowledge E.g. the secrets of the Big Bang …what was the matter like within the first moments.
IT-4014/EN/NA62 Technical Specification Dismantling, Design, Supply and Installation of a Ventilation and Air Conditioning System for ECN3, TCC8 and GHN300.
25-September-2005 Manjit Dosanjh Welcome to CERN International Workshop on African Research & Education Networking September ITU, UNU and CERN.
BIDDERS’ CONFERENCE IT-3972 Provision of Maintenance Services on the Industrial Trucks at CERN April 24th 2014 Handling Engineering Group2 Introduction.
Germany and CERN / June 2009Germany and CERN | May Welcome - Willkommen CERN: to CERN: Accelerating Science and Innovation Professor Wolfgang A.
Logo area Handling Engineering Requirements EN-HE Group Bruno Feral – EN/HE EDMS HL-LHC CE Consultant Kick-Off Meeting – 31/05/2016.
CONFIDENTIAL 1 EPC, European Union and unitary patent/UPC EPC: yes EEA: no EU: no (*) (*) Also means no unitary patent Albania, Macedonia, Monaco, San.
INTERNATIONAL BUSINESS Unit 2 Business Development GCSE Business Studies.
Best Sustainable Development Practices for Food Security UV-B radiation: A Specific Regulator of Plant Growth and Food Quality in a Changing Climate The.
Bidders’ Conference IT-4130/EN Replacement of Personnel Lifts (up to 2 t Capacity) I. Rühl / EN-HE.
CERN August 2013CERN Teacher Programmes1 Designing Effective Outreach Programmes for Teachers at CERN Inspiring the next generation of scientists and engineers.
5-minutes tour of CERN (based on official CERN slides) 5-minutes tour of CERN (based on official CERN slides) Christian Joram / CERN EIROfrum Topical Workshop.
CERN Procurement Procedures for the HL-LHC project Civil Engineering work London, 24 June 2016 Lisa Bellini-Devictor, CERN/IPT-PI.
EUDET Transnational Access: some administrative aspects
I. Bergevoet - Training preparation
European Organization for Nuclear Research
The 5 minutes tour of CERN The 5 minutes race of CERN
EN-Handling Engineering Group
European Union Duy Trinh.
EN-HE Group meeting 4th December 2015
The 5 minutes tour of CERN The 5 minutes race of CERN
First beam impact report
ALIGNMENT RULE PROCEDURE
CERN Teacher Programmes
CERN The world’s largest Particle Physics Research Center in Geneva
The European Parliament – voice of the people
The European Parliament – voice of the people
EU: First- & Second-Generation Immigrants
European Union Membership
ALIGNMENT RULE PROCEDURE
European representation of respiratory critical care HERMES participants. European representation of respiratory critical care HERMES participants. Countries.
Perspective of an International Research Center
Where in the world is the European Union?
CERN: from fundamental sciences to daily applications
Prodcom Statistics in Focus
Presentation transcript:

Bidders’ conference IT-4123 Supply, Replacement and Repair of Crane Rails Introduction to CERN and rails consolidation program Handling Engineering Group

01/09/2015IT-4123 Technical Specification CERN is a Global Lab Peace Initiative CERN was founded in 1954 as a Peace Initiative by 12 European States Today it counts 21 Member States : Austria, Belgium, Bulgaria, the Czech Republic, Denmark, Finland, France, Germany, Greece, Hungary, Israel, Italy, the Netherlands, Norway, Poland, Portugal, Slovakia, Spain, Sweden, Switzerland and the United Kingdom 2300 staff physicists, engineers, technicians, administrative personnel 1000 personnel on contract users who represent more than half of the living particle physicists originating from 500 universities and institutes and of more than 80 nationalities

01/09/2015IT-4123 Technical Specification The Missions of CERN  Push forward the frontiers of knowledge e.g. the secrets of the Big Bang … what was the matter like within the first moments of the Universe’s existence?  Develop new technologies for accelerators and detectors Information technology - the Web and the GRID Medicine - diagnosis and therapy  Train the scientists and the engineers of tomorrow  Unite people from different countries and cultures

01/09/2015IT-4123 Technical Specification CERN Accelerator Complex

01/09/2015IT-4123 Technical Specification The LHC A collider situated in an underground 27 km in an almost circular tunnel designed to accelerate two proton beams to 7 TeV 1982 : First studies 1994 : Project Approved by the CERN Council 1996 : Final Decision and start of the construction 2004 : Installation Starts 2006 : Hardware Commissioning Starts 2008 : End of Hardware Commissioning : Physics 10 GJ = 55 km/h

01/09/2015IT-4123 Technical Specification The structure of CERN

01/09/2015IT-4123 Technical Specification EN Department Head of Department’s Office (EN-HDO) R. Saban Cooling & Ventilation (EN-CV) M. Nonis Electrical Engineering (EN-EL) S. Baird Handlling Engineering (EN-HE) I. Rühl Machines & Experimental Facilities (EN-MEF) K. Foraz Sources, Targets & Interactions (EN-STI) R. Losito General Management & Secretariats (EN-GMS) S. Prodon Industrial Controls & Engineering (EN-ICE) Ph. Gayet Mechanical & Materials Engineering (EN-MME) F. Bertinelli  Operation  Infrastructure  Accelerators  Experimental Areas  Projects  Consolidation  Upgrades  New facilities  Design & Manufacturing  Studies Department Head: R. Saban Deputy: S. Baird

01/09/2015IT-4123 Technical Specification Handling Engineering Group The mandate : The mandate : provide transport and handling services for the technical infrastructure of CERN, accelerators and experiments. This includes the design, the tendering/procurement, the installation, the commissioning, the operation, the maintenance and decommissioning of standard industrial and custom built transport and handling equipment. Group Leader Ingo Rühl

01/09/2015IT-4123 Technical Specification Handling Maintenance Section HM - Handling Maintenance Section leader: Helder LOURENÇO EOT cranes Gilles Roche Jean-Pierre Granchelli Oliver Böttcher Roberto Rinaldesi Industrial trucks Bruno Feral Jean-Maurice Chevalley Documentation Cathelijne Hazelaar-Bal

01/09/2015IT-4123 Technical Specification 01/09/2015 EN-HE Transport and Handling Equipment 350 Cranes / 800 Hoists 2000 Lifting Beams 80 Working Platforms 400 Lifting Equipment 100 Tractors 50 Special Vehicles About 4000 assets in Total

01/09/2015IT-4123 Technical Specification Introduction to Rails Consolidation Program Long-term program which concerns the renovation of old and worn crane rails Some rails are 50 years old Inventory under preparation (~ 250 buildings) Most critical cases already identified rails will be subject to intervention in the next 5 years Program priorities as following CERN operations requirements

01/09/2015IT-4123 Technical Specification Introduction to Rails Consolidation Program