CES Status J.Osborne 6 November 2009 Status Report from Civil Engineering and Services Working Group J.Osborne GS/SEM for CES Working Group.

Slides:



Advertisements
Similar presentations
SiD Surface assembly Marco Oriunno (SLAC) MDI-CFS Meeting Sep. 4-6, 2014, Ichinoseki (Japan)
Advertisements

CERN TS Department / Civil Engineering Group 8 February 2008 Civil Engineering Layouts & Tunnel Cross Section 1 CLIC/ILC Collaboration Meeting 8 Feb 2008.
CFS challenges for a linear collider J.Osborne CERN ILC-GDE Dubna - 4 June 2008 OUTLINE : Introduction Civil Engineering -Geology (water, stability issues.
MPE Workshop 14/12/2010 Building 107- project Raphaël Berberat
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
Construction and Installation of the CLIC Experimental Area
19/10/2010 GS-SEM J Osborne N Baddams A Kosmicki EN-CV M Nonis EN-MEF M Gastal PH-CMX A Gaddi H Gerwig A Herve N Siegrist DGS-SC.
Global Design Effort 1 Conventional Facilities and Siting Overview A. Enomoto, J-L. Baldy, V. Kuchler GDE.
Global Design Effort - CFS CLIC 09 Workshop - WG 5 Technical Systems 1 CLIC 09 WORKSHOP Working Group 5 - Technical Systems ILC REBASELINE ILC.
ILC CFS / CLIC CES Studies for the Interaction Region : - An action was given at the Geneva Linear Collider Meeting for CFS to develop a more in-depth.
LCC Linear Collider Collaboratio ILC - CFS 12 November 2013 LCWS13 Tokyo University 1 Site-specific CF design from TDR LCWS13, 12 November 2013 Atsushi.
Experimental hall in Japanese mountain site Y. Sugimoto 1.
TS Department / Civil Engineering Group 17 October 2007 Civil Engineering Layouts & Tunnel Cross Section 1 CLIC workshop – Working group: Two beam hardware.
1. Civil Engineering works for Linear Colliders* : -Brief introduction on the overall machine layout (just for CLIC at this stage) -Experimental Area.
Global Design Effort - CFS SiD Collaboration Meeting - SLAC 1 VERTICAL ACCESS ILC IR LAYOUT for SiD and ILD CONVENTIONAL FACILITIES AND SITING.
LCWS14 - Belgrade October 6-10, 2014 Conventional Facilities & Siting Working Group Summary V Kuchler, M Miyahara, J Osborne.
ILC experimental area - How to ‘develop’ CFS details for TDP (cavern size, number of shafts, HVAC, EL spec etc) ? - KEK site specific issues CFS V.Kuchler.
LINEAR COLLIDER COLLABORATION Designing the world’s next great particle accelerator Detector Hall Configuration Overview New baseline (Hybrid A’) proposed.
IR location for the shallow site near Dubna A. Dudarev JINR IWLC 2010, October 20.
November 17, st XFEL / ILC Meeting 1 ILC GLOBAL Design Effort The Current ILC Twin Tunnel Design Wilhelm Bialowons and Nicholas Walker · MPY.
LHC scheduling applied to CLIC and ILC TILC09 & GDE AAP review – Tsukuba April 2009 K. Foraz K. Foraz - CERN TILC09 & GDE AAP review – Tsukuba April 2009.
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
1 CLIC / ILC Collaboration for CES issues JOHN OSBORNE – CES 8 April 2009.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
1 Global Design Effort TILC08 - WG1 Summary WG-1: Cost Reduction Studies J. Carwardine, T. Shidara, N. Walker (For WG-1 participants)
TILC08 - WG1 Summary Global Design Effort 1 TILC08 仙台 GDE 会議 WG-1 活動報告 GDE 活動報告会 3月11日10:00- 3号館7階会議室 設楽
Agenda : CLIC Civil Engineering and Services (CES) WG.
John Osborne : GS-SEM Civil Engineering 19 May 2009 Report on behalf of CLIC Civil Engineering and Services (CES) WG CTC 19 May 2009 Tunnel Cross Section.
TDR Status of Asian CFS Team Part II: The ILC Baseline Reference Ch.SectionSubsectionsAuthor1 st draft 112: Asian Region Siting Studies Overview Location.
10/2010 IWLC2010 Global Design Effort 1 Brief Overview of Interaction Region Conventional Facilities in RDR Times Presenter Tom Lackowski.
Civil Engineering and Services - drawings for CDR - CDR chapter J.Osborne and M.Gastal for CES WG 1.
Global Design Effort - CFS ILC10 Beijing, March, Single-Tunnel Accelerator Configuration Of Asian Region Atsushi Enomoto (KEK)
1 J.Osborne (CERN)
A. Hervé - 17 Oct CLIC-Workshop CLIC Workshop: 17 Oct. 07 Interaction Region Engineering at ILC Push-Pull Option A. Hervé/CERN.
Global Design Effort - CFS GDE Plenary Session 1 LCWS10 GDE Plenary Session SB 2009 ILC CONVENTIONAL FACILITIES AND SITING GROUP A. Enomoto, V.
Global Design Effort - CFS 1 DRAFT CFS Global Meeting 29 July 2009 CONVENTIONAL FACILITIES AND SITING GROUP : Safety documents Safety documents 3d modeling.
CLIC Workshop, CERN 1 CLIC/ILC Collaboration Report: Marc Ross (Fermilab); for Nick Walker, Akira Yamamoto Project Managers International Linear.
MDI Meeting 13 th MDI: Latest news on civil engineering and services First draft concept for the ventilation system in the CLIC experimental area 11/06/2010.
John Osborne : GS-SEM Civil Engineering 18 May 2009 CES 9 June News from ILC Japan CFS review 1-3 June 2010 :
Experimental Areas Studies Lessons learnt at CMS M Gastal & CMS Technical Coordination (A Ball, W Zeuner)
A. Hervé - 17 Sept ILC-IRENG IRENG07 Workshop: 17 Sept. 07 Various Possibilities for disposition of Experimental Area A. Hervé/CERN.
3/20/11 ALCPG11 Global Design Effort 1 CFS Detector Hall Considerations Tom Lackowski.
Global Design Effort - CFS AD & I Meeting - DESY AD & I Meeting - DESY 1 AD&I Meeting CONVENTIONAL FACILITIES AND SITING GROUP Main Linac Tunnel.
Global Design Effort - CFS ILC Global Systems Meeting 1 ILC GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP STATUS REPORT V. Kuchler,
ILC D RAFT P ROJECT S CHEDULE K LYCLUSTER 500GeV K Foraz & M Gastal ILC Mechanical & Electrical Review and CFS Baseline Technical Review Many thanks to.
Global Design Effort - CFS DESY Accelerator Design and Integration Meeting 1 ACCELERATOR INTEGRATION AND DESIGN MEETING CONVENTIONAL FACILITIES.
Europe / CERN studies for SB2009 ILC Re-Baseling J.Osborne CERN (CFS & CES) 2009 Linear Collider Workshop of the Americas 28 September - 4 October 2009.
FCC-hh MDI 5 th Meeting Friday 13 th March 2015 Civil Engineering Layouts for Experimental Caverns – First Draft Charlie Cook (GS), John Osborne (GS)
Survey Meeting John Osborne, CERN 8 February 2016
MDI Meeting 13 th MDI: Latest news on civil engineering and services First draft concept for the ventilation system in the CLIC experimental area 11/06/2010.
Experimental hall in Japanese mountain site 2011/11/30 Yasuhiro CFS Webex meeting 1.
CES Studies at CERN for the Interaction Region : -Summary of Linear Collider IR meeting at CERN held on 16 February Design Brief for external design.
Global Design Effort - CFS ILC CFS & Global Systems Meeting 1 ILC CFS & GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS Status.
SECONDARY BEAM HANDLING AND INFRASTRUCTURE DESIGN STATUS BRUNO FERAL (CERN/EN) DIAMANTO SMARGIANAKI (CERN/EN) Project Leader: I.Efthymiopoulos (Cern/EN)
ILC CONVENTIONAL FACILITIES A. Enomoto, V. Kuchler, J. Osborne
ILC CONVENTIONAL FACILITIES A. Enomoto, V. Kuchler, J. Osborne
Experimental Hall in Mountain Regions
Detector Hall Design and Cost Information CONVENTIONAL FACILITIES
CLIC Civil Engineering Update
Yasuhiro Sugimoto 2012/2/1 ILD integration meeting
Marco Oriunno (SLAC), March 12, 2014 MDI WG
CLIC Civil Engineering & Infrastructure
Tunnel Cross Section Studies
CLIC / ILC Collaboration for CFS works
Interaction Region Alternative Layouts
Status of Cryogenics Facilities Design
Detector Hall Tom Lackowski ILD Workshop 2011 LAL, Paris
CLIC Civil Engineering Update
RDR Baseline Layouts for Interaction Region
FCC Week 2019 Civil Engineering Summary
Presentation transcript:

CES Status J.Osborne 6 November 2009 Status Report from Civil Engineering and Services Working Group J.Osborne GS/SEM for CES Working Group

CES Status Civil engineering and services Develop a layout for the interaction region. This includes civil engineering and technical infrastructure. Work with ILC wherever synergies exist. Planning and cost estimates for the construction of the experimental area, including surface buildings. This includes civil engineering, cooling an ventilation, electrical installations, survey, access control, transport and handling, etc. Collaborate closely with the Detector Working Group. Follow up the evolution of the detector and MDI layout, starting from existing preliminary layouts.

CES Status CES Working Group Representatives : Civil Engineering and ChairmanJ.Osborne(GS) Technical SecretaryM.Gastal(EN) EN Co-ordinatorC.Hauviller(EN) CLIC Link persons (from other WG’s)P.Lebrun / G.Riddone…(DG&BE) Cooling and Ventilation CVJ.Inigo-Golfin / M.Nonis / C.Martel(EN) Electricity ELC.Jach(EN/DG) Survey SUH.Mainaud Durand(BE) Controls, Safety ASET.Pettersson(GS) Horizontal Handling HEK.Kershaw(EN) Vertical HandlingHEI.Ruehl(EN) CE Layouts, 3d modelsA.Kosmicki (GS) SC Link PersonR.Trant / F.Corsanego(DG) Experimental Area DesignM.Gastal(EN) ILC membersV.Kuchler (FNAL), A.Enomoto (KEK) Civil Engineering and Services (CES) WG

CES Status J.Osborne 5 November Design

CES Status J.Osborne 5 November Design

CES Status 4.5m tunnel used as baseline for 2007 costing exercise

CES Status 7 4.5m tunnel for CDR

CES Status 8

9 CDR Long profile as per ILC

CES Status 10 20mrad To be modified !

CES Status 11 To be modified !

CES Status ILC RDR Baseline Layouts for Interaction Region

CES Status 400t 400 ton gantry crane is the cost driver large steel columns down to floor level would be needed Lot of lost space ILC RDR Baseline for IR cavern

CES Status Possible layout for ILC Interaction Region for Deep Tunnel Solution using CMS concept A.Herve (CMS) study 2007

CES Status Proposed new cross section for ILC Interaction Region

CES Status ILC Dubna design for shallow site

CES Status ILC 3d models developed at CERN using CATIA

CES Status 14.Oct CLIC_09 Workshop H.Gerwig/ A. Gaddi/ N.Siegrist Tunnel part Thin endcaps Is this ‘tunnel part’ more stable than cavern ? “Tunnel is at least ~ 10 times more stable than detector” (A. Seryi, CLIC08)

CES Status 2004

CES Status 2005 Stability of CMS platforms could be checked ?

CES Status Summary Design for ILC RDR experimental hall exists but will be developed further for TDP For CLIC CDR design should be developed further, better adapted to CERN environment Costing for CDR required for all technical infrastructure CES will collaborate closely with the Detector Working Group. Follow up the evolution of the detector and MDI layout, starting from existing preliminary layouts.