S. Montebugnoli 2 nd SKADS Workshop 10-11 October 2007 Stelio Montebugnoli IRA - INAF- Italy.

Slides:



Advertisements
Similar presentations
SKA New Technology Demonstrator Ray Norris CSIRO Australia Telescope National Facility.
Advertisements

SKAMP Square Kilometre Array Molonglo Prototype. Supporting Institutions  University of Sydney  Argus Technologies  ATNF  ICT Centre.
Paul Alexander DS3 & DS3-T3 SKADS Review 2006 DS3 The Network and its Output Data Paul Alexander.
Jan Geralt Bij de Vaate DS4-T4 Wideband Integrated Antennas DS4-T4 Jan Geralt Bij de Vaate ASTRON.
AAVS receiver Federico Perini AAVP December, ASTRON, Dwingeloo.
SKAMP - the Molonglo SKA Demonstrator M.J. Kesteven CSIRO ATNF, T. J. Adams, D. Campbell-Wilson, A.J. Green E.M. Sadler University of Sydney, J.D. Bunton,
SKAMP - the Molonglo SKA Demonstrator M.J. Kesteven CSIRO ATNF, T. J. Adams, D. Campbell-Wilson, A.J. Green E.M. Sadler University of Sydney, J.D. Bunton,
Interference Daniel Mitchell, ATNF and Sydney University.
BDT Radio – 2b – CMV 2009/10/09 Basic Detection Techniques 2b (2009/10/09): Focal Plane Arrays Case study: WSRT System overview Receiver and.
Prototype SKA Technologies at Molonglo: 3. Beamformer and Correlator J.D. Bunton Telecommunications and Industrial Physics, CSIRO. Australia. Correlator.
The SKA Molonglo Prototype (SKAMP) Project SKA Meeting - April 2006 Anne Green.
ATA Antennas Feeds and Systems NSF Review 8/05/08 Jack Welch.
Dec 2010 AAVP Cambridge workshop AAVP AAVS1/2-low demonstrators Jan Geralt Bij de Vaate.
Use of FOS for Airborne Radar Target Detection of other Aircraft Example PDS Presentation for EEE 455 / 457 Preliminary Design Specification Presentation.
Atacama Large Millimeter/submillimeter Array Expanded Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array Spectrometer PDR John.
Name1 title 4 th SKADS Workshop, Lisbon, 2-3 October 2008 Progress in Active Antenna Design and Developement - FIDA3 Timothy Finn FG-IGN
Name1 SKA(DS) System Design Aspects 4 th SKADS Workshop, Lisbon, 2-3 October 2008 SKA(DS) System Design Aspects: building a system Laurens Bakker.
Central Development Laboratory (Adapted from John Webber’s Viewgraphs, April 2002 Presented tonight by Skip Thacker) IEEE Tour April 2003.
SKA-Japan Industry Forum [SKA-Japan Workshop 2010] EMC & Microwave Systems November 05, 2010.
Jader Monari1 BEST receivers 4 th SKADS Workshop, Lisbon, 2-3 October 2008 Jader Monari IRA -INAF- Bologna –Italy-
AA-Low Technical Progress Meeting, October 2012, Medicina, Italy AAVS0 & AAVS0.5: System Design and Test Plan Nima Razavi-Ghods Eloy de Lera Acedo.
1 M. Catelani, Valeria L. Scarano University of Florence, Italy Department of Electronics and Telecommunications -
Phased Array Feeds John O’Sullivan SKANZ 2012 CSIRO Astronomy and Space Science,
FPGA-based Dedispersion for Fast Transient Search John Dickey 23 Nov 2005 Orange, NSW.
RN /08/05 National Aeronautics and Space Administration Jet Propulsion Laboratory California Institute of Technology Implementation of an Antenna.
Tim Ikin 11 th October ND SKADS Workshop 2-PAD Analogue Front End Tim Ikin Electronics Engineer 2 nd SKADS Workshop Paris 11 th October 2007.
Simulations of Beamforming Algorithms Stelio Montebugnoli, IRA-INAF, Medicina (BO), Italy, Giovanni Naldi, IRA-INAF, Medicina.
1 WP3 Progress towards objectives 27/10/ WP3.1 Communications equipment for trials The objectives of this work package are: to configure existing.
André van Es 2 nd SKADS Workshop October 2007 Review on Deliverables and forward look André van Es.
Andrew Faulkner1 Technology Readiness Levels 4 th SKADS Workshop, Lisbon Technology Readiness Levels TRLs Andrew Faulkner.
Rosie Bolton1 SKADS Costing work 4 th SKADS Workshop, Lisbon, 2-3 October 2008 SKADS Costing work: Spreadsheets to scalable designs Rosie Bolton Dominic.
Andrew Faulkner1 SKADS and SKA 4 th SKADS Workshop, Lisbon SKADS and SKA Andrew Faulkner.
The BEST-2 SKA pathfinder is composed by 32 receivers. The front ends are installed on the focal lines of 8 cylinders, offering a collecting area of about.
Rosie Bolton SKADS Workshop April 10th 2008 SKADS Costing work: beyond the benchmark scenario Rosie Bolton Paul Alexander, Andy Faulkner and SKADS Costing.
Stelio Montebugnoli BEST 4 th SKADS Workshop, Lisbon, 2-3 October 2008 S.Montebgnoli IRA -INAF- Bologna –Italy- 4 th SKADS Workshop, Lisbon, 2-3 October.
1 EMBRACE - G.W. Kant 4 th SKADS Workshop, Lisbon, 2-3 October 2008 EMBRACE Deliverable Status overview G.W. Kant ASTRON, The Netherlands.
Mileura Widefield Array – Low Frequency Demonstrator MHz * Currently in “Early Deployment” phase Goal: HI at redshift 6 to 17.
Integrated receivers for mid-band SKA Suzy Jackson Engineer, Australia Telescope National Facility SKADS FP6 Meeting – Chateau de Limelette – 4-6 November,
Electromagnetic Design of Broadband Antenna Feed Systems for the Northern Cross Radio Telescope (Bologna, Italy) Designed Broad Band Antenna Feed Systems.
Andrew Faulkner 2 nd SKADS Workshop October 2007 SKADS Benchmark Scenario Andrew Faulkner.
Peter Wilkinson1 Conclusions 4 th SKADS Workshop, Lisbon, 2-3 October 2008 SKADS aims to –Demonstrate SKA Scientific Viability and Readiness –Demonstrate.
Australian Astronomy MNRF Development of Monolithic Microwave Integrated Circuits (MMIC) ATCA Broadband Backend (CABB)
EMBRACE receiver 8th SKADS Board Meeting Château de Limelette, Belgium, 3 November 2009 DS5 EMBRACE IRA&ASTRON DS5 Eng. Group Presentation by Jader Monari.
An FX software correlator for VLBI Adam Deller Swinburne University Australia Telescope National Facility (ATNF)
S.Montebugnoli BEST 4 th SKADS Workshop, Lisbon, 2-3 October 2008 Stelio Montebugnoli IRA -INAF- Bologna –Italy- SKADS 4th -Lisbon- Oct 2-3, 2008.
2 nd SKADS Workshop October 2007P. Colom & A.J. Boonstra 1 Outline -progress in RFI mitigation (methods inventory) -system design & RFI mitigation:
A Modular K-Band Focal Plane Array for the Green Bank Telescope Matt Morgan National Radio Astronomy Observatory 9/28/2007.
1 Sardinia Radio Telescope, the VLBA and the HSA Luigina Feretti INAF Istituto di Radioastronomia Bologna, Italy.
J. Monari 2 nd SKADS Workshop October 2007 BEST-2 test bed: Radio over Fiber experiences Presented by Monari Jader IRA-INAF Radiotelescopio Croce.
Australia Telescope Users Committee Technologies Report - Oct 2008.
Performance of Adaptive Beam Nulling in Multihop Ad Hoc Networks Under Jamming Suman Bhunia, Vahid Behzadan, Paulo Alexandre Regis, Shamik Sengupta.
EMBRACE receiver 8th SKADS Board Meeting Château de Limelette, Belgium, 3 November 2009 DS5 EMBRACE IRA&ASTRON DS5 Eng. Group Presentation by Jader Monari.
Andrew Faulkner1 DS4 Deliverables 4 th SKADS Workshop, Lisbon DS4 Deliverables Andrew Faulkner.
Roshene McCool1 Phase Transfer & WANs 4 th SKADS Workshop, Lisbon, 2-3 October 2008 Local Oscillator distribution over fibre Roshene McCool SPDO – Signal.
Roshene McCool SKADS Workshop 2007 DS3 – T1 Network Infrastructure and Data Transmission Roshene McCool Simon Garrington University of Manchester.
Philippe Picard 2 nd SKADS Workshop October 2007 Station Processing Philippe Picard Observatoire de Paris Meudon, 11th October 2007.
Paul Alexander 2 nd SKADS Workshop October 2007 SKA and SKADS Costing The Future Paul Alexander Andrew Faulkner, Rosie Bolton.
Rosie Bolton 2 nd SKADS Workshop October 2007 SKADS System Design and Costing: Update and next steps Rosie Bolton University of Cambridge.
Georgina Harris 11 th October nd SKADS Workshop – Observatoire de Paris 2-PAD Infrastructure Georgina Harris SKADS System Design and Team Leader.
Paul Alexander1 DS3 Deliverable Status 4 th SKADS Workshop, Lisbon, 2-3 October 2008 DS3 Deliverables Review.
Medichats 14 October 2008 ADC bit number and input power needed, in new radio-astronomical applications View of the Medicina Radiotelescopes - Italy Eng.
Multifunctional Digital Backend (MDBE) for "Quasar" VLBI-network
IRA – INAF Bologna (I) DS-6 16 September 2018 SKADS Workshop 2006
Aperture Array Station Processing
Technical Foundations & Enabling Technologies – DS4
Analysis of Adaptive Array Algorithm Performance for Satellite Interference Cancellation in Radio Astronomy Lisha Li, Brian D. Jeffs, Andrew Poulsen, and.
SKADS White Paper - Technologies -
Jan-Geralt Bij de Vaate
EVLA Advisory Panel Mtg. System Overview
SKAMP Square Kilometre Array Molonglo Prototype
Presentation transcript:

S. Montebugnoli 2 nd SKADS Workshop October 2007 Stelio Montebugnoli IRA - INAF- Italy

S. Montebugnoli 2 nd SKADS Workshop October 2007 Main points… DS6-T1: Design of subsystems DS6-T2: Development and demonstration DS6-T3: Assesment of performance DS6-T4: Phased array on concentrators

S. Montebugnoli 2 nd SKADS Workshop October 2007 DS-6 Scenario DS-6 is aimed to the construction of 3 demonstrators, different in size, based on a large existing platform equipped with cylindrical concentrators (Northern Cross array located in Medicina, near Bologna - Italy-)

S. Montebugnoli 2 nd SKADS Workshop October 2007 Deliverables: 1- LNAs, Analog Optical link, IF stages 2- Wideband A/D converter, at least 1 8bit 3- Ultra fast data processing 4- Reliability prediction Achieved milestones and deliverables DS6-T1 IF Input (Optical link) Intermediate Freq Block Data Proc Cluster Reliability Prediction High performance Front–End High performance Front end Low cost Optical Link Analogue Optical link S.Montebugnoli

2 nd SKADS Workshop October 2007 Achieved milestones and deliverables DS6-T2 DS-6 T2: Development and demonstration of the BEST-1 a small platform as part of the NC (408 MHz ) BEST-1  176 m 2 4 rx – 1 N/S cylinder 1 Rx=¼ of NS cylinder4 RX =1 NS cylinder Aug. 2005

S. Montebugnoli 2 nd SKADS Workshop October 2007 Achieved milestones and deliverables DS6-T2 DS-6 T2: Development and demonstration of the BEST-2 a large SKA platform as part of the NC (408 MHz ) BEST-2  1410 m 2 32 rx – 8 N/S cylinders (Equivalent to a 42 mt dish antenna)

S. Montebugnoli 2 nd SKADS Workshop October 2007 Achieved milestones and deliverables DS6-T2 DS-6 T2: Development and demonstration of the BEST-2, a large SKA platform as part of the NC (408 MHz) NF=0.45dB Tn=32K Gain=60dB OIP3>+33dBm Input RL>15dB Output RL>10dB Power

S. Montebugnoli 2 nd SKADS Workshop October 2007 Achieved milestones and deliverables DS6-T2 DS-6 T2: Development and demonstration of the BEST-2, a large SKA platform as part of the NC (408 MHz) =1310nm NF=36dBdB Gain=-25dB BW=(0.1-1)GHz IIP3>+33dBm Input RL>15dB Output RL>20dB Power

S. Montebugnoli 2 nd SKADS Workshop October 2007 Achieved milestones and deliverables DS6-T2 DS-6 T2: Development and demonstration of the BEST-2, a large SKA platform as part of the NC (408 MHz) Optical fibre from the front-end IF uP

S. Montebugnoli 2 nd SKADS Workshop October 2007 DS-6 T2: Development and demonstration of the BEST-2, a large SKA platform as part of the NC (408 MHz) Achieved milestones and deliverables DS6-T2 4 x 8 bit (1.0 GS/sec)

S. Montebugnoli 2 nd SKADS Workshop October 2007 Achieved milestones and deliverables DS6-T2 DS-6 T2: Development and demonstration of the BEST-2, a large SKA platform as part of the NC (408 MHz). The final IF and data processing system for the BEST-2 demonstrator NC telescope protected band 3 MHz BEST-2 Bandwidth

S. Montebugnoli 2 nd SKADS Workshop October 2007 Time Receivers Amplitude Transit of Cassiopeia Oct. 2007(Bw=16 MHz, waterfall plot) Transit of Cassiopeia Oct (Bw=16 MHz, waterfall plot) BEST-2 “FIRST LIGHT”

S. Montebugnoli 2 nd SKADS Workshop October 2007 Time Receivers Transit of Cassiopeia Oct (Bw=16 MHz, 2D plot) BEST-2 “FIRST LIGHT”

S. Montebugnoli 2 nd SKADS Workshop October 2007 DS6-T2 : future step BEST-3  7464 m 2 (2008) (Equivalent to a 100 m dish antenna) 564 mt 640 mt

S. Montebugnoli 2 nd SKADS Workshop October 2007 Achieved milestones and deliverables DS6-T3 DS6-T3: Assessment of Performace BEST-1: P n obtained with. GRASP Tsys computed : = 86.3 K Tsys measured : F=408 MHz

S. Montebugnoli 2 nd SKADS Workshop October 2007 Potential of FPAs for cylinders DS-6 T4 DS4-T4:Phased array on concentrators This is a T task but some preliminary mechanical considerations could simplify in a near future the installation of a 4x4 antennas (i.e. a subset of EMBRACE) on the focal line of one cilyndrical concentrator...useful to test on the field the deliverables from: DS-4 T1 DS-4 T3 DS-4 T4 DS-4 T6

S. Montebugnoli 2 nd SKADS Workshop October 2007 Next milestone, next deliverable MilestoneT1 -Milestone: - End of design BEST-3 (T m) Deliverables: -Deliverables: - Analogue opt. links - calibration of large array -MilestoneT2 -Milestone: - End of construction of BEST-3 (T m) -Deliverables -Deliverables: - L.O. & Sync distrib. Scheme - Wide Band high res. A/D - Softw. Beamform. Algorithms - Adapt. Beamf./RFI mit. Algorithms

S. Montebugnoli 2 nd SKADS Workshop October 2007 Conclusion At this date, the DS-6 milestones are reached and deliverables ready.At this date, the DS-6 milestones are reached and deliverables ready. The BEST-2 seen the “first light”. Calibration, adaptive beamforming and mapping of a radio source are expected to be ready in a couple of monthsThe BEST-2 seen the “first light”. Calibration, adaptive beamforming and mapping of a radio source are expected to be ready in a couple of months The plan is to have BEST-3 (maturity of the technology, costs & first astronomical observation) for T mThe plan is to have BEST-3 (maturity of the technology, costs & first astronomical observation) for T m

S. Montebugnoli 2 nd SKADS Workshop October 2007 Achieved milestones and deliverables DS6-T2 Simulation for BEST-1 - N.sensors =4 - Sensor= 16 /2 dipoles - Sensor spacing=8 - Samples used for R =200 - Primary beam = 2 o DOA RFI = +12 o, -23 o, +30 o - DOA RFI = +12 o, -23 o, +30 o Simulation DOA RFI RFI mitigat.->MVDR (BEST-1) (Connection with DS-4 T3) Simulations for BEST-2 are in progress

S. Montebugnoli 2 nd SKADS Workshop October 2007 Achieved milestones and deliverables T2 RFIs mitigat.->MSC (BEST-1) (Connection with DS-4 T3) Preliminary test

S. Montebugnoli 2 nd SKADS Workshop October 2007 Achieved milestones and deliverables T2 RFIs Mitigation via Polyphase filter bank (BEST-1) (Connection with DS-4 T3) PFB P,  Proc. Chan. Contr. Channel Threshold level S.Montebugnoli Preliminary test