Using Archived Data to Measure Operational Benefits of a System-wide Adaptive Ramp Metering (SWARM) System TAC Meeting December 13, 2006 Robert Bertini.

Slides:



Advertisements
Similar presentations
A PERSPECTIVE ON APPLICATION OF A PAIR OF PLANNING AND MICRO SIMULATION MODELS: EXPERIENCE FROM I-405 CORRIDOR STUDY PROGRAM Murli K. Adury Youssef Dehghani.
Advertisements

Project Prioritization - 1 Project Prioritization Using Paramics Microsimulation: A Case Study for the Alameda County Central Freeway Project Presented.
Project Construction Update August 30, 2011 I-5 North Stockton Freeway Widening and Pavement Reconstruction Project Between Dr. Martin Luther King Jr.
Dynamic Traffic Assignment: Integrating Dynameq into Long Range Planning Studies Model City 2011 – Portland, Oregon Richard Walker - Portland Metro Scott.
Transportation Infrastructure Bond Corridor Mobility Improvement Account.
Route 28 South of I-66 Corridor Safety and Operations Study Technical Committee Meeting #2 June 25,
2011 Freeway Congestion Monitoring Program Findings TPB Technical Committee December 2, 2011 Greg Jordan, SKYCOMP, Inc & Daivamani Sivasailam, DTP TPB.
February 9, 2006TransNow Student Conference Using Ground Truth Geospatial Data to Validate Advanced Traveler Information Systems Freeway Travel Time Messages.
Evaluation of the Effectiveness of Potential ATMIS Strategies Using Microscopic Simulation Lianyu Chu, Henry X. Liu, Will Recker PATH ATMS UC.
Evaluation of Potential ITS Strategies under Non-recurrent Congestion Using Microscopic Simulation Lianyu Chu, University of California, Irvine Henry Liu,
Month XX, 2004 Dr. Robert Bertini Using Archived Data to Measure Operational Benefits of ITS Investments: Ramp Meters Oregon Department of Transportation.
Optimal Adaptive Signal Control for Diamond Interchanges Using Dynamic Programming Optimal Adaptive Signal Control for Diamond Interchanges Using Dynamic.
Assessment and Refinement of Real-Time Travel Time Algorithms for Use in Practice January 10, 2007.
Using Archived Data to Measure Operational Benefits of a System-wide Adaptive Ramp Metering (SWARM) System Task 4: Pilot Study July 31, 2006 Robert Bertini.
Assessment and Refinement of Real-Time Travel Time Algorithms for Use in Practice Nov 8, 2006.
October 6, :30 – 11:00. MPM Team Agenda Review of MPM program and team MAP-21 and other updates Mobility performance measures reporting On-going.
USING PeMS DATA TO EMPIRICALLY DIAGNOSE FREEWAY BOTTLENECK LOCATIONS IN ORANGE COUNTY, CALIFORNIA Robert L. Bertini Portland State University Aaron M.
Capability-Enhanced PARAMICS Simulation with Developed API Library Lianyu Chu, Henry X. Liu, Will Recker California Partners for Advanced Transit and Highways.
© 2014 HDR, Inc., all rights reserved. COUNCIL BLUFFS INTERSTATE SYSTEM MODEL Jon Markt Source: FHWA.
1 Modeling Active Traffic Management for the I-80 Integrated Corridor Mobility (ICM) Project Terry Klim, P.E. Kevin Fehon, P.E. DKS Associates D.
VIRGINIA’S IMPLEMENTATION of the FINAL RULE on WORK ZONE SAFETY and MOBILITY Virginia Department of Transportation’s Instructional and Informational Memorandum-LD-241.
Multimodal Corridor System Management – Incorporating Analysis of Transit, Demand Management Programs and Operational Strategies Presented by Bill Loudon,
WSDOT SW Region, Vancouver, WA December 7, 2009 WSDOT SW Region, Vancouver, WA December 7, 2009 Tolling Study Committee.
Outline Project Background ITS Architecture Overview GVMC ITS Architecture Deployment Plan.
Border Data Warehouse. Vancouver, BC Bellingham, WA The Cascade Gateway.
NATMEC June 5, 2006 Comparative Analysis Of Various Travel Time Estimation Algorithms To Ground Truth Data Using Archived Data Christopher M. Monsere Research.
Abstract Transportation sustainability is of increasing concern to professionals and the public. This project describes the modeling and calculation of.
California Department of Transportation Transportation Management Systems (TMS) and their role in addressing congestion Discussion Materials Lake Arrowhead.
+ Creating an Operations-Based Travel Forecast Tool for Small Oregon Communities TRB National Transportation Planning Applications Conference May 20, 2009.
November 15, 2005 Dr. Robert Bertini Dr. Sue Ahn Using Archived Data to Measure Operational Benefits of a System-wide Adaptive Ramp Metering (SWARM) System.
Dr Hamid AL-Jameel 1 Developing a Simulation Model to Evaluate the Capacity of Weaving Sections.
Assessment and Refinement of Real-Time Travel Time Algorithms for Use in Practice May 9, 2007.
Freeway Congestion In The Washington Region Presentation to National Capital Region Transportation Planning Board February 15, 2006 Item # 9.
Community Outreach Meeting September 10, 2015 Welcome to Santa Clara County I-680 Corridor Study 1.
Assessment and Refinement of Real-Time Travel Time Algorithms for Use in Practice November 8 th, 2007.
Georgia’s Regional Traffic Operations Program Christopher Barrow, E.I.T. Traffic Engineer II.
Robert L. Bertini Sirisha M. Kothuri Kristin A. Tufte Portland State University Soyoung Ahn Arizona State University 9th International IEEE Conference.
January 23, 2006Transportation Research Board 85 th Annual Meeting Using Ground Truth Geospatial Data to Validate Advanced Traveler Information Systems.
Abstract This project is to evaluate the benefits of the System-Wide Adaptive Ramp Metering (SWARM) system implemented in the Portland Metropolitan area.
April 18, 2006 Dr. Robert Bertini Dr. Sue Ahn Dr. Chris Monsere Using Archived Data to Measure Operational Benefits of a System-wide Adaptive Ramp Metering.
S.H. 121 – Dallas, Texas Case Study Presentation National Summit on Future Transportation Funding and Finance Strategies April 11, 2007 Michael Morris,
Assessment and Refinement of Real-Time Travel Time Algorithms for Use in Practice April 11, 2007.
Comparative Analysis Of Various Travel Time Estimation Algorithms To Ground Truth Data Using Archived Data Christopher M. Monsere Research Assistant Professor.
Portland State University 11 By Maisha Mahmud Li Huan Evaluation Of SCATS Adaptive Traffic Signal Control System.
1 Techniques for Validating an Automatic Bottleneck Detection Tool Using Archived Freeway Sensor Data Jerzy Wieczorek, Rafael J. Fernández-Moctezuma, and.
The Fargo/Moorhead Area Interstate Operations Study Opportunities and Planned Activities Presentation for the Mn/DOT Travel Demand Modeling Coordinating.
1 Lessons From Developing an Archived Data User Service: Who Is Using It? Lessons from Developing an Archived Data User Service in Portland, Oregon: Who.
1 Using Archived ITS Data to Automatically Identify Freeway Bottlenecks in Portland, Oregon Robert L. Bertini, Rafael J. Fernández-Moctezuma, Jerzy Wieczorek,
July 13, 2005ITE District 6 Annual Meeting Using Ground Truth Geospatial Data to Validate Advanced Traveler Information Systems Freeway Travel Time Messages.
SHRP2 Project C05: Final Report to TCC Understanding the Contribution of Operations, Technology, and Design to Meeting Highway Capacity Needs Wayne Kittelson.
1 Intelligent Transportation Systems: Saving Lives, Time and Money PORTAL: Transportation Data Archive Intelligent Transportation Systems Laboratory Deena.
Transportation Research Board Planning Applications Conference, May 2007 Given by: Ronald T. Milam, AICP Contributing Analysts: David Stanek, PE Chris.
Using Archived Data to Measure Operational Benefits of a System-wide Adaptive Ramp Metering (SWARM) System Data Collection Plan / Experimental Design May.
PISA FOR DEVELOPMENT Technical Workshop Out-of-School 15 year old 1 st and 2 nd October 2014 OECD Secretariat 1.
1 Briefing on the Congestion Management Process (CMP) Andrew J. Meese, AICP Melanie Wellman COG/TPB Staff Travel Management Subcommittee November 27, 2007.
ITE District 6 June 27, 2006 Incorporating Incident Data into a Freeway Data Archive for Improved Performance Measurement ITE District 6 June 27, 2006.
Review of the Texas Transportation Institute (TTI) 2007 Urban Mobility Report By Ronald F. Kirby Presentation to Transportation Planning Board October.
Monitoring Afghanistan, 2015 Food Security and Agriculture Working Group – 9 December 2015.
Transpo 2012 Yan Xiao, Mohammed Hadi, Maria Lucia Rojas Lehman Center for Transportation Research Department of Civil and Environmental Engineering Florida.
Abstract Traffic was studied on a thirty kilometer section of freeway north of Frankfurt Am Main, Germany using archived loop detector data. The spatial-temporal.
1 Briefing on Draft Congestion Management Process Elements for the 2007 CLRP Andrew J. Meese, AICP Melanie Wellman COG/TPB Staff TPB Technical Committee.
ITE District 6 June 27, 2006 Incorporating Incident Data into a Freeway Data Archive for Improved Performance Measurement ITE District 6 June 27, 2006.
1 Bottleneck Identification and Forecasting in Traveler Information Systems Robert L. Bertini, Rafael Fernández-Moctezuma, Huan Li, Jerzy Wieczorek, Portland.
Corridor Management Planning in California Jeff X. Ban CCIT, UC-Berkeley Rensselaer Polytechnic Institute (RPI)
Status Report on the Regional Value Pricing Study Ronald F. Kirby, Director of Transportation Planning November 15, 2006 Item 11.
ATDM Analytical Methods for Urban Streets Urban Streets Subcommittee Meeting January 10, 2016 David Hale.
Macro / Meso / Micro Framework on I-395 HOT Lane Conversion
Soyoung Ahn1, Robert L. Bertini2, Christopher M
Using Ground Truth Geospatial Data to Validate Advanced Traveler Information Systems Freeway Travel Time Messages CTS Transportation Seminar Series, January.
State Route 55 Improvement Project from Interstate 5 to State Route 91
Presentation transcript:

Using Archived Data to Measure Operational Benefits of a System-wide Adaptive Ramp Metering (SWARM) System TAC Meeting December 13, 2006 Robert Bertini Sue Ahn Oren Eshel

Meeting Outline Introductions Introductions Work Plan Work Plan Progress Report Progress Report Pilot Study Pilot Study Remaining Tasks Remaining Tasks Regional Study Regional Study Next Steps Next Steps Discussion Discussion

Work Plan – Progress Report Task 1: Literature Review Task 1: Literature Review Revision will be posted next week Revision will be posted next week Update: Caltrans I-210 Study Update: Caltrans I-210 Study Tasks 2-3: Corridor Selection and Data Collection Plan Tasks 2-3: Corridor Selection and Data Collection Plan Complete – TAC comments incorporated Complete – TAC comments incorporated Task 4: Pilot Study Task 4: Pilot Study TRB Paper – Revision submitted and on Wiki TRB Paper – Revision submitted and on Wiki Additional analysis suggested Additional analysis suggested Poster to be presented in January Poster to be presented in January Task 5: Regional Study Task 5: Regional Study

Task 1 – Report Comments TAC literature review comments to be addressed: TAC literature review comments to be addressed: Balancing congestion on freeways and alternate routes (i) Balancing congestion on freeways and alternate routes (i) Evaluation design strategies (ii) Evaluation design strategies (ii) Detection at off-ramps (iii) Detection at off-ramps (iii) Revision will be posted next week Revision will be posted next week Complete: Complete: Added discussion of SWARM 2c (iii) Added discussion of SWARM 2c (iii) Moved figure to better introduce it (iv) Moved figure to better introduce it (iv)

Task 1 – Update: I-210 Study Planned Evaluation of I-210 (unpublished) Planned Evaluation of I-210 (unpublished) Phase 1 (11/06) Phase 1 (11/06) Enhancements (?) to existing SWARM system Enhancements (?) to existing SWARM system Evaluation Evaluation Data collection 2 weeks before and after & historical data Data collection 2 weeks before and after & historical data Travel time runs on arterials, manual queue counts Travel time runs on arterials, manual queue counts Phase 2 (12/06 – 6/07) Phase 2 (12/06 – 6/07) Addition of freeway-to-freeway metering Addition of freeway-to-freeway metering Conversion of HOV bypass lanes to metered HOV lanes Conversion of HOV bypass lanes to metered HOV lanes Evaluation Evaluation 2 weeks for adjustment 2 weeks for adjustment Data collection over 4-6 weeks & comparison to historical data Data collection over 4-6 weeks & comparison to historical data Goal: reproducible evaluation framework Goal: reproducible evaluation framework Possible Caltrans connection (formal/informal) ? Possible Caltrans connection (formal/informal) ?

Task 4: OR-217 SB Pilot Study TRB presentation in January TRB presentation in January Paper revised 11/2006 Paper revised 11/2006 Additional analysis suggested by TAC Additional analysis suggested by TAC

Task 4: On-Ramp Volume Volumes on key ramps (BH Hwy and Scholls Ferry) Volumes on key ramps (BH Hwy and Scholls Ferry) 3 to 9% higher under SWARM 3 to 9% higher under SWARM TAC Suggestion TAC Suggestion Look at timing rates for pre-timed system and determine whether SWARM parameters should be modified. Look at timing rates for pre-timed system and determine whether SWARM parameters should be modified. FIGURE 8 On-ramp volumes between 6:30AM and 8:30AM.

Task 4: Travel Times Travel times for BH Hwy and Scholls Ferry on-ramps (NEW) Travel times for BH Hwy and Scholls Ferry on-ramps (NEW) Under SWARM, 23% lower at BH Hwy and 37% lower at Scholls-Ferry Under SWARM, 23% lower at BH Hwy and 37% lower at Scholls-Ferry 5 minute samples from video, to minute samples from video, to Included in revised TRB paper Included in revised TRB paper FIGURE 9(a) Travel time on the Beaverton-Hillsdale Highway on-ramp. FIGURE 9(b) Travel time on the Scholls-Ferry Rd. on-ramp.

Task 4: Additional Analysis Basic analysis for last two months of pre-timed and first two months of SWARM Basic analysis for last two months of pre-timed and first two months of SWARM So far So far pre-timed: 10/3/05 – 10/7/05 pre-timed: 10/3/05 – 10/7/05 SWARM: 12/5/05 – 12/9/05 SWARM: 12/5/05 – 12/9/05 Results preliminary – significant data issues Results preliminary – significant data issues e.g. 10/3: 1.5 hour communications failure e.g. 10/3: 1.5 hour communications failure Used as an opportunity to refine, streamline data processing tools (75% complete) Used as an opportunity to refine, streamline data processing tools (75% complete) Once complete, will be able to easily process additional days Once complete, will be able to easily process additional days Did we mention that the results are preliminary? Did we mention that the results are preliminary?

VMT 6/06 Pre-timed and SWARM 10/05 Pre-timed, 12/05 SWARM (Preliminary)

VHT 6/06 Pre-timed and SWARM 10/05 Pre-timed, 12/05 SWARM (Preliminary)

Delay 6/06 Pre-timed and SWARM 10/05 Pre-timed, 12/05 SWARM (Preliminary)

Performance Measures (6-9AM) VMTVHT Travel-Time (minutes) Delay (veh-hrs) Pre-Timed SWARM % Change VMTVHT Travel-Time (minutes) Delay (veh-hrs) Pre-Timed65,8711, SWARM66,4261, % Change0.8%6.0%5.1%34.7% 10/05 Pre-timed, 12/05 SWARM (Preliminary) 6/06 Pre-timed and SWARM

Task 4: Draft Reporting Format On-ramp queue storage/spillover On-ramp queue storage/spillover Measurement challenges Measurement challenges Communications failures Communications failures Incorporate incidents, weather Incorporate incidents, weather 2006 incident data will be in Portal soon 2006 incident data will be in Portal soon Focus on gaps in ATMS analysis capabilities? Focus on gaps in ATMS analysis capabilities? Need to understand what those are Need to understand what those are

Task 5: Regional Corridor Study Candidates previously identified Candidates previously identified OR-217 Southbound OR-217 Southbound I-205 Northbound I-205 Northbound I-5 Lower Northbound I-5 Lower Northbound I-205 Southbound I-205 Southbound Issues Issues Communication Failures Communication Failures On-ramps – measurement of spillover, total delay On-ramps – measurement of spillover, total delay Off-ramp counts (needs further discussion) Off-ramp counts (needs further discussion)

Corridor Selection I-205 NB I-205 NB I-5 Lower NB I-5 Lower NB I-205 SB I-205 SB

Corridor Selection

Questions Communication issues status Communication issues status OR-217 OR-217 OR-217 Construction OR-217 Construction Gather pre-timed data before SWARM is reactivated? Gather pre-timed data before SWARM is reactivated? I-205 NB I-205 NB Glisan Street detectors? Glisan Street detectors? Downstream of Division bottleneck Downstream of Division bottleneck

Other Items Possible partnership w/Caltrans Possible partnership w/Caltrans Capturing additional operational data from SWARM? Capturing additional operational data from SWARM? Contacts with NET (Delcan)? Contacts with NET (Delcan)? Project staffing Project staffing OTREC proposal for UTC funding component of project OTREC proposal for UTC funding component of project Subcontract to ASU Subcontract to ASU

Next Steps December December Complete literature review Complete literature review Complete work on data processing tools Complete work on data processing tools Incorporate new data fidelity flags Incorporate new data fidelity flags 2005 Data Analysis 2005 Data Analysis Complete TRB poster Complete TRB poster January January TRB paper presentation TRB paper presentation TBD TBD Preliminary analysis for regional study Preliminary analysis for regional study

Next Steps (from 7/06 meeting, for reference) Reasons for the increase in delay Reasons for the increase in delay More analysis on on-ramps More analysis on on-ramps Total delay? – require counts at meters Total delay? – require counts at meters Travel time (sampling frequency) Travel time (sampling frequency) Report Report

Recommendations (from 7/06, for reference) Data near bottleneck to measure bottleneck discharge flow Data near bottleneck to measure bottleneck discharge flow Video? Video? Agree on performance measure for on-ramps Agree on performance measure for on-ramps Total delay, queue length, queue spill-over Total delay, queue length, queue spill-over All or selected on-ramps All or selected on-ramps Data collection method for on-ramps Data collection method for on-ramps Video: time-consuming for total delay Video: time-consuming for total delay