ICT Coordination and Planning Meeting #1 (17-19 April 2013) ALMA Dashboard 1.0 Giorgio Filippi 2013-04-17 The Atacama Large Millimeter/submillimeter Array.

Slides:



Advertisements
Similar presentations
Coherent Web Sustaining Engineering Plan 1. The Coherent Web team will: Utilize two-week development “sprints” to plan and track implementation activities.
Advertisements

Sixth Hour Lecture 10:30 – 11:20 am, September 9 Framework for a Software Management Process – Artifacts of the Process (Part II, Chapter 6 of Royce’ book)
Atacama Large Millimeter/submillimeter Array Expanded Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array.
ALMA: The March to Early Science Al Wootten, ALMA/NA Project Scientist Cometary Radio Astronomy.
ALMA TACand the proposal process Lister Staveley-Smith Member, ALMA Review Panel.
SE 555 Software Requirements & Specification Requirements Management.
Atacama Large Millimeter/submillimeter Array Expanded Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks R. Brunetti INFN-Torino The Italian Regional.
NEW PRODUCT INTRODUCTION: SalesLink TOUCH April 2015.
An Agile View of Process
Terry Jackson Paul Rydeen August 16, 2010
Professional Informatics & Quality Assurance Software Lifecycle Manager „Tools that are more a help than a hindrance”
CSCI ClearQuest 1 Rational ClearQuest Michel Izygon - Jim Helm.
2008 Decmeber 5 ALMA-JT Science Meeting 1 ALMA Project News Koh-Ichiro Morita ALMAJ Project Scientist.
October 2005ALMA Cost Review1 Atacama Large Millimeter Array Science IPT Review Bilateral Project Scientists: Al Wootten, (Lead) Tom Wilson, (Deputy) Ryohei.
Atacama Large Millimeter/submillimeter Array Expanded Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array.
December 2007Chile Observatories Earthquake Preparedness Workshop1 Atacama Large Millimeter/submillimeter Array ALMA Eduardo Donoso.
FP OntoGrid: Paving the way for Knowledgeable Grid Services and Systems WP8: Use case 1: Quality Analysis for Satellite Missions.
ADASS XI Sept30-Oct3, 2001 The ALMA Common Software (ACS) as a basis for a distributed software development G.Raffi, G.Chiozzi (ESO), B.Glendenning (NRAO)
Descripción y Areas del Dpto. de Computación de ALMA (ADC) Tzu-Chiang Shen Gerente del Grupo de Software Departamento de Computación ALMA Joint ALMA Observatory.
ALMA Common Software Basic Track Introduction to the ACS Framework.
ALMA Common Software Basic Track Software Engineering Basics.
JCOMM in-situ Observing Programme Support Centre SeaDataNet Technical Meeting II Paphos, Cyprus March 2012 Mathieu Belbeoch & Kelly Stroker.
Workshop in ALMA Logs Prepared by Juan Pablo Gil – Arturo Hoffstadt
Software Integration and Test Techniques in a Large Distributed Project: Evolution, Process Improvement, Results Paola Sivera - ESO.
A Scheduling Algorithm with Dynamic Priorities Status Presentation Matias Mora Klein UTFSM Computer Systems Research.
EA ARC Ken Tatematsu East-Asian ARC Manager. ARC organization Difference between ARCS: NA: concentrated in Charlottesville Europe: distributed in different.
A Search for Hydroxlyamine (NH 2 OH) Towards IRC+10216, Orion-S, Orion(KL), SgrB2(N), SgrB2(OH), W512M, W3(IRS5) R. L. Pulliam NRAO / North American ALMA.
The ALMA Software and Release Management Ruben Soto Software Operations Group & Release Manager Joint ALMA Observatory.
MWA Data Capture and Archiving Dave Pallot MWA Conference Melbourne Australia 7 th December 2011.
Three State Data Warehouse 1 Cassie Archuleta Tom Moore May 6, 2014 Progress Update for 3SDW Development.
ALMA Common Software Basic Track Component implementation guidelines.
ALMA Common Software Basic Track Test Driven Development Unit testing and TAT.
All rights reserved, 2010, Thales Alenia Space BL OOS Page /01/2010 Unlocking the secrets of the Universe V. Giorgio Director for Science TAS-IPadova,
ALMA Common Software Basic Track Logging and Error Systems.
NRAO Users Committee Meeting May 20-21, National Radio Astronomy Observatory NRAO Users Committee Meeting – May 20-21, 2008 ALMA Operations Chris.
EGEE is a project funded by the European Union under contract IST User support in EGEE Alistair Mills Torsten Antoni EGEE-3 Conference 20 April.
Celine DONDEYNAZ, Joint Research Centre- Italy A. Leone, C. Carmona, P. Mainardi, M.Giacomassi and Prof. Daoyi Chen A Web knowledge Management Platform.
ALMA Common Software Basic Track A walk through ACS functionality.
ICALEPCS’ GenevaACS in ALMA1 Allen Farris National Radio Astronomy Observatory Lead, ALMA Control System.
ANKITHA CHOWDARY GARAPATI
ALMA Week, 2004 March 3-5, in Garmisch, Germany ALMA Operations Plan: Progress Report Darrel Emerson (NRAO) David Silva (ESO) JAO Operations Group
2007Sep06 EAC Butler - Software Overview 1 Software Overview Bryan Butler.
ALMA Polarization Commissioning and Verification Status Kouichiro Nakanishi (Joint ALMA Observatory/NAOJ) on behalf of ALMA Polarization Commissioning.
Early Science Specification and Expected Array Evolution Masao Saito EA ALMA Project Scientist EA PS Report1 2nd ALMA Users Meeting 2011/1/13.
ALMA and the Call for Early Science The Atacama Large (Sub)Millimeter Array (ALMA) is now under construction on the Chajnantor plain of the Chilean Andes.
Spanish WFD article 13 reporting Group D meeting April 28th 2010 Brussels.
TCS-ICS interactions Kuvvet Atakan 1 and the WP6 and WP7 Teams 1 University of Bergen / Department of Earth Science.
ICALEPCS 2005 Geneva, Oct. 12 The ALMA Telescope Control SystemA. Farris The ALMA Telescope Control System Allen Farris Ralph Marson Jeff Kern National.
EO Dataset Preservation Workflow Data Stewardship Interest Group WGISS-37 Meeting Cocoa Beach (Florida-US) - April 14-18, 2014.
UlvestadEVLA Advisory Committee Meeting September 6-7, Future EVLA Operations Jim Ulvestad.
Atacama Large Millimeter/ submillimeter Array - ALMA ASAC Charges For Oct 31 ASAC Report to ALMA Board Al Wootten JAO Interim Project Scientist.
ALMA Common Software Basic Track Project Lifecycle.
ALMA Common Software Basic Track Configuration Database.
ALMA Integrated Computing Team Coordination & Planning Meeting #1 Santiago, April 2013 Release Manager and Acceptance Manager Roles J. Ibsen/ R.
The Earth System Grid (ESG) A Fault Monitoring System for ESG Components DOE SciDAC ESG Project Review Argonne National Laboratory, Illinois May 8-9, 2003.
ALMA Common Software Basic Track Component/Container Model and Lifecycle Management.
PDS4 Project Report PDS MC F2F University of Maryland Dan Crichton March 27,
Dashboard upcoming features A Hales, ALMA and M Chavan, ESO
ACA TP Spectrometer Manabu Watanabe (NAOJ)
MSc-Student Activities at ESO
ALMA Common Software Basic Track
ALMA Software Scheduling subsystem Planning for cycle5 onwards
Support 2001.
PRTS & KPI Nick Whyborn – Vasco Cortez
Shift Log Tool Refactoring
Integrated Alarm System for ALMA
Obsprep Planning, 2017 Alan Bridger
Upgrade to Oracle12c in February 2017 José Parra
Atacama Large Millimeter Array Science IPT Review
Presentation transcript:

ICT Coordination and Planning Meeting #1 (17-19 April 2013) ALMA Dashboard 1.0 Giorgio Filippi The Atacama Large Millimeter/submillimeter Array (ALMA), an international astronomy facility, is a partnership among Europe, North America and East Asia in cooperation with the Republic of Chile.

Monitoring & Control Many areas/systems have already there own monitoring (and in some cases) control M&C tools, either as configured commercial applications or as ad hoc development Some M&C can notify/inform users by means of s, phone, radio, beeping, etc. Some M&C have local database for historical data There are on going efforts in various areas to complete/upgrade such systems in both performance/functionality and coverage

quite a lot is already there... Despite all these tools is difficult to get the overview of ALMA as a system.

ALMA Observatory as a system What first: …. start from the most visible element The antennas

The AOS Status spreadsheet Google spreadsheet Google spreadsheet developed by R. Hill et al. at the beginning of 2012 to keep the overview of the antennas status, originally focusing on the CSV needs and then becoming the “reference” view for operations.

DASHBOARD WEB based prototype implementation of the spreadsheet concept. It may help: Identifying processes and responsibilities and standardize internal and external communications Focusing on priorities Integrating existing workflows Providing transparency to EXEC.

DASHBOARDDASHBOARD (V1.0) status Development of the core completed (by INRIA on JAO Contract) and was tested by users (AIV Coordinators, CSV Scientists, AOG Operators) in real operations since March 25. Preliminary Acceptance granted on April 02. Application released to user on Apr10. Completion of a set of minor features (reporting, graphical enhancements, …) for end April/midMay. Discussion is open on possible follow-ups about: Access control: who can read/write what?  basic mechanism already in place Level of internal/external visibility of data?  basic mechanism already in place Integration with other applications (JIRA workflow, CMMS, OMC, …. )? DASHBOARD can also prompt further discussion on organization of operational processes.

Time to formalize operational processes (conceptual example) TECHNICAL OPERATIONS SCIENCE OPS OFF-LINE In Maintenance Engineering ready Relocating Science Ready Science Ready Assigned to Array

Many Thanks for your attention! Questions?