Vienna Group Trigger Meeting CERN, 18 July 2006 Presented by Claudia-Elisabeth Wulz Global Muon Trigger Global.

Slides:



Advertisements
Similar presentations
Compact Muon Solenoid Thomas Themel TU Wien June 2009 Institut für Hochenergiephysik, ÖAW Control of the Global Muon Trigger Tobias Noebauer Ivan Mikulec.
Advertisements

First Tests of a GTL-Prototype-Card using XDAQ S. Kostner, J. Strauss and A. Taurok (Hephy, Vienna) with help from J. Gutleber (CERN)
GCT Software Jim Brooke GCT ESR, 7 th November 2006.
GCT Software ESR - 10th May 2006 Jim Brooke. Jim Brooke, 10 th May 2006 HAL/CAEN Overview GCT Driver GCT GUI Trigger Supervisor Config DB Test scripts.

RPC Trigger Software ESR, July Tasks subsystem DCS subsystem Run Control online monitoring of the subsystem provide tools needed to perform on-
Alice EMCAL Meeting, July 2nd EMCAL global trigger status: STU design progress Olivier BOURRION LPSC, Grenoble.
Uli Schäfer Discussions with H.B. after last meeting… All ATLAS standard racks and crates will be monitored. Helfrieds group will equip them with ELMBs.
Global Trigger Upgrades for SLHC Vienna, Global Trigger Group A.Taurok, C.-E. Wulz SLHC Workshop, FNAL, 19 Nov
Vienna Group Trigger Meeting CERN, 6 Dec Presented by Claudia-Elisabeth Wulz Global Muon Trigger Global.
Global Trigger H. Bergauer, K. Kastner, S. Kostner, A. Nentchev, B. Neuherz, N. Neumeister, M. Padrta, P. Porth, H. Rohringer, H. Sakulin, J. Strauss,
Emulator System for OTMB Firmware Development for Post-LS1 and Beyond Aysen Tatarinov Texas A&M University US CMS Endcap Muon Collaboration Meeting October.
RPC PAC Trigger system installation and commissioning How we make it working… On-line software Resistive Plate Chambers Link Boxes Optical Links Synchronization.
Claudia-Elisabeth Wulz Institute for High Energy Physics Vienna Level-1 Trigger Menu Working Group CERN, 9 November 2000 Global Trigger Overview.
DT Track Finder, Global Muon Trigger, Global Trigger H. Bergauer, L. Boldizsar, M. Dallavalle, Ch. Deldicque, J. Erö, L. Guiducci, A. Jeitler, I. Jimenez.
DAQ MICO Report Online Monitoring: –Status All histograms are now implemented Still not fully online –Only monitoring from data file (slightly offline,
On-line Software Requirements for the Global Trigger, the Global Muon Trigger and the Barrel Muon Trigger Track Finder Claudia-Elisabeth Wulz & HEPHY Vienna.
Summary of CSC Track-Finder Trigger Control Software Darin Acosta University of Florida.
Status of Global Trigger Global Muon Trigger Sept 2001 Vienna CMS-group presented by A.Taurok.
Global Trigger H. Bergauer, L. Boldizsár, A. Jeitler, P. Hidas, K. Kastner, S. Kostner, N. Neumeister, M. Padrta, P. Porth, H. Rohringer, H. Sakulin, J.
Hall D Online Meeting 27 June 2008 Fast Electronics R. Chris Cuevas Jefferson Lab Experimental Nuclear Physics Division 12 GeV Trigger System Status Update.
Claudia-Elisabeth Wulz Anton Taurok Institute for High Energy Physics, Vienna Trigger Internal Review CERN, 6 Nov GLOBAL TRIGGER.
Global Trigger H. Bergauer, Ch. Deldicque, J. Erö, K. Kastner, S. Kostner, A. Nentchev, B. Neuherz, N. Neumeister, M. Padrta, P. Porth, H. Rohringer, H.
17-Aug-00 L.RistoriCDF Trigger Workshop1 SVT: current hardware status CRNowFinal Hit Finders64242 Mergers31616 Sequencers2312 AMboards4624 Hit Buffers21212.
Annual Review Cern -June 13th, 2006 F. Loddo I.N.F.N. Bari RPC Electronics: Technical Trigger Flavio Loddo I.N.F.N. Bari On behalf of the RPC-Trigger group.
W. Smith, DOE/NSF Review, August, 2006 CMS Trigger - 1 SORT ASICs (w/heat sinks) EISO Bar Code Input DC-DC Converters Clock delay adjust Clock Input Oscillator.
Status and planning of the CMX Wojtek Fedorko for the MSU group TDAQ Week, CERN April , 2012.
Claudia-Elisabeth Wulz Anton Taurok Institute for High Energy Physics, Vienna Hannes Sakulin CERN Annual Review CERN, 24 Sep Global Trigger Global.
Compact Muon Solenoid Christian Hartl CERN Austrian Doctoral Student June 2009 Institut für Hochenergiephysik, ÖAW CMS Global Trigger Control and Monitoring.
Overview, remarks, lamentations, hope and despair M. Sozzi TDAQ WG meeting CERN - 4 June 2013 Introduction, news and appetizer.
CSC Track-Finder Plans for Commissioning at Bat.904 and Point 5 Darin Acosta University of Florida.
W. Smith, U. Wisconsin, LHCC CMS Review, May 6, 2008 Trigger Coordination - 1 Trigger Coordination Report Wesley H. Smith U. Wisconsin CMS Trigger Coordinator.
Implementation and Test of the First- Level Global Muon Trigger of the CMS Experiment Hannes Sakulin 1), 2), Anton Taurok 2) 1) CERN 2) Institute for High.
CMS Latency Review, 13th March 2007CSC Trigger 1 Latency and Synchronization update.
Global Muon Trigger / RPC Interface Warsaw and Vienna Groups RPC Electronics System Review Warsaw, 8 July 2003 presented by Claudia-Elisabeth Wulz.
Nov 1, 2002D0 DB Taking Stock1 Trigger Database Status and Plans Elizabeth Gallas – FNAL CD (with recent help from Jeremy Simmons, John Weigand, and Adam.
Global Trigger, Global Muon Trigger H. Bergauer, L. Boldizsar, A. Jeitler, P. Hidas, K. Kastner, S. Kostner, N. Neumeister, M. Padrta, P. Porth, H. Rohringer,
Hardware: Software:
Electronics for HPS Proposal September 20, 2010 S. Boyarinov 1 HPS DAQ Overview Sergey Boyarinov JLAB June 17, 2014.
US CMS DOE/NSF Review, 20 November Trigger - W. Smith1 WBS Trigger Wesley H. Smith, U. Wisconsin CMS Trigger Project Manager DOE/NSF Status.
SLHC Meeting CERN, 21 May 2008 Presented by C.-E. Wulz Global Triggers,  TCA Technology M. Stettler, M. Hansen (CERN) C. Foudas, G. Iles (Imperial College)
1 MICE Tracker Readout Update Introduction/Overview TriP-t hardware tests AFE IIt firmware development VLSB firmware development Hardware progress Summary.
Vienna Group Discussion Meeting on Luminosity CERN, 9 May 2006 Presented by Claudia-Elisabeth Wulz Luminosity.
Trigger Group of the Institute for High Energy Physics, Vienna presented by Claudia-Elisabeth Wulz CPT Week, Plenary Session CERN, 18 April 2002 GLOBAL.
HPS TDAQ Review Sergey Boyarinov, Ben Raydo JLAB June 18, 2014.
RPC Electronics Link system RPC Annual Review, CERN, June 13, 2006 Maciek Kudla for Lappeenranta and Warsaw University.
Global Trigger, Global Muon Trigger H. Bergauer, Ch. Deldicque, J. Erö, A. Jeitler, K. Kastner, S. Kostner, A. Nentchev, B. Neuherz, N. Neumeister, M.
Level 1-2 Trigger Data Base development Current status and overview Myron Campbell, Alexei Varganov, Stephen Miller University of Michigan August 17, 2000.
LHC CMS Detector Upgrade Project RCT/CTP7 Readout Isobel Ojalvo, U. Wisconsin Level-1 Trigger Meeting June 4, June 2015, Isobel Ojalvo Trigger Meeting:
1 Status of Validation Board, Selection Board and L0DU Patrick Robbe, LAL Orsay, 19 Dec 2006.
Calorimeter global commissioning: progress and plans Patrick Robbe, LAL Orsay & CERN, 25 jun 2008.
Status of LAV electronics commissioning Mauro Raggi, Francesco Gonnella Laboratori Nazionali di Frascati 1 Mauro Raggi - Laboratori Nazionali di Frascati4.
Software and TDAQ Peter Lichard, Vito Palladino NA62 Collaboration Meeting, Sept Ferrara.
August 24, 2011IDAP Kick-off meeting - TileCal ATLAS TileCal Upgrade LHC and ATLAS current status LHC designed for cm -2 s 7+7 TeV Limited to.
The Control and Hardware Monitoring System of the CMS Level-1 Trigger Ildefons Magrans, Computing and Software for Experiments I IEEE Nuclear Science Symposium,
Global Trigger Upgrades for SLHC Vienna, Global Trigger Group A.Taurok, C.-E. Wulz SLHC Workshop, FNAL, 19 Nov
L1Calo Databases ● Overview ● Trigger Configuration DB ● L1Calo OKS Database ● L1Calo COOL Database ● ACE Murrough Landon 16 June 2008.
EPS HEP 2007 Manchester -- Thilo Pauly July The ATLAS Level-1 Trigger Overview and Status Report including Cosmic-Ray Commissioning Thilo.
L1Calo DBs: Status and Plans ● Overview of L1Calo databases ● Present status ● Plans Murrough Landon 20 November 2006.
E. Hazen1 New DCC Status and Plans Jim Rohlf, Eric Hazen, Arno Heister, Phil Lawson, Jason St John, Shouxiang Wu Boston University.
21 October 2010 Vasile Mihai Ghete CMS Trigger Research Project HEPHY Scientific Advisory Board.
Global Trigger Upgrades for SLHC
CMS Trigger Supervisor Framework
TTC signals: Global Trigger and Global Muon Trigger
Wesley H. Smith, U. Wisconsin CMS Trigger Project Manager
Regional Cal. Trigger Milestone: Production & Testing Complete
Design Principles of the CMS Level-1 Trigger Control and Hardware Monitoring System Ildefons Magrans de Abril Institute for High Energy Physics, Vienna.
Pierluigi Paolucci & Giovanni Polese
Global Trigger and Global Muon Trigger
Global Trigger and Global Muon Trigger Latency
Presentation transcript:

Vienna Group Trigger Meeting CERN, 18 July 2006 Presented by Claudia-Elisabeth Wulz Global Muon Trigger Global Trigger H. Bergauer, V. Ghete, Ph. Glaser, I. Mikulec, M. Jeitler, K. Kastner, B. Neuherz, T. Nöbauer, I. Magrans de Abril, I. Mikulec, M. Padrta, H. Rohringer, Th. Schreiner, J. Strauss, A. Taurok, A. Winkler, C.-E. Wulz

Trigger Meeting, July 2006 C. - E. Wulz2 GMT/GT status  GMT/GT has been moved to Point 5 end of June.  The equipment has been set up and self-tested.  Muon cables from DTTF and CSCTF to GMT were put into place.  A test, sending generated patterns from DTTF was performed successfully involving the whole chain up to L1A generation: DTTF-GMT-GTL-FDL-TCS-TTCci. I. Mikulec, M. Jeitler, J. Er ö

Trigger Meeting, July 2006 C. - E. Wulz3 First DTTF-GMT-GT test at Point 5 GMT DTTF GTLGTL FDLFDL TCSTCS TTCci GT crate 9 (fake) muons/orbit rate reading: ~100 kHz L1 A TTC XDAQ

Trigger Meeting, July 2006 C. - E. Wulz4 Setup at Point 5 GMT/GT DTTF Photos: J. Erö

Trigger Meeting, July 2006 C. - E. Wulz5 GT/GMT production and testing status 2 when required Oct 2006 Sept 2006 Missing at CERN / foreseen NEW: 2 assembled and tested (1 has transfer error on one channel), 4 new version boards ordered final2 2 7 (4)PSB 3 empty boardsto be finished1 to be tested 0 1GTFE 1 testing 0 NEW: 3 tested (1 signal on TIM chip has problems) 2 spares 1 to be finished 1 spare 1 test crate In Vienna final new version to be done final -- new version to be done -- Firmware 1 empty backplane 1 + 1spare 1Crate+ backplane NEW: 2 partly assembled 1 1GMT NEW: 1 assembled, not tested; 2 empty boards 1 1FDL NEW: 3 boards in assembly 1 1GTL For DTTF+spares NEW: 8 in assembly 1 + 1spare 1TIM 2 empty boards 4 4CONV6U 3 empty boards 1 2L1AOUT NEW: 1 board assembled, but not yet tested 1 1TCS Production chainAt CERN CMS Name (4 needed when no GCT)

Trigger Meeting, July 2006 C. - E. Wulz6 GT/GMT installation and commissioning plan NameCMSAt CERNInstallationCommissioningRemarks Crate+ backplane spareasap TCS1 1asap New firmware version will control 8 daq partions. Actual version controls 4 partions. L1AOUT2 1Sept 2006 Only the front panel connectors have to be mounted on missing board. CONV6U4 4asap TIM spareasap GTL1 1asap FDL1 1asap New firmware version will contain some 32 bit counters. GTFE1 0Oct 2006Oct – Nov 2006 PSB7 (4) 2asap Will be done with 4 PSB boards Full set of PSBs will be commissioned when GCT becomes available GMT1 1asap 1 No change since Annual Review in June 2006.

Trigger Meeting, July 2006 C. - E. Wulz7 GT and GMT Emulators V. Ghete (GT), I. Mikulec (GMT) See also Vasile’s talk at 17:00 on 19 July 2006 in the Online Selection Meeting for details.

Trigger Meeting, July 2006 C. - E. Wulz8 Status of GMT Emulator  A standalone GMT emulator exists in CMSSW CVS.  NEW since June Annual Review: The LUT generation feature was implemented in the CMSSW version of the GMT emulator.  The emulator has bitwise HW compatibility.  It has been tested with pre-generated muons from ORCA. The results are identical to the results with ORCA and the HW itself.  Adjustment of the interfaces might be needed as other systems commit their code.  Implementation of the database communication will be done coherently with other L1 subsystems.

Trigger Meeting, July 2006 C. - E. Wulz9 L1GlobalTriggerProducer Produce: L1GlobalTriggerReadoutRecord Information needed for the emulator Use classes from DataFormats/L1Global* for trigger objects: muons: – L1MuGMTCand calorimeter trigger objects: – L1GctEmCand; – L1GctJetCand; – L1GctEtTotal; L1GctEtHad; L1GctEtMiss; – L1GctJetCounts Give access to raw values (get/set methods) physical representation to be moved to another producer

Trigger Meeting, July 2006 C. - E. Wulz10 Class L1GlobalTriggerReadoutRecord Relocated: moved from DataFormats/L1Trigger to DataFormats/L1GlobalTrigger Updated to the latest GCT DataFormats classes (V ) Committed for nightly and CMSSW_0_9_0_pre1 releases Get/set methods: exist for all trigger objects no methods yet for DAQ, EVM words, other hardware-related words no bunch-crossing dependence yet – to be agreed with GMT and GCT See code in CVS repositoryCVS repository

Trigger Meeting, July 2006 C. - E. Wulz11 Global Trigger Configuration Trigger MenuGTguidef.xml VHDL GT Emulator use the same configuration file for hardware and emulator def.xml produced by GTgui define algorithms, conditions set ET thresholds, η and φ windows def.xml for Physics TDR L1 trigger menu produced (Jeitler/Bergauer)

Trigger Meeting, July 2006 C. - E. Wulz12 Global Trigger Configuration: Classes

Trigger Meeting, July 2006 C. - E. Wulz13 Status of GT Emulator Classes for GT configuration: mostly ported trigger menu read from file(s) in L1GlobalTrigger/data directory move later to EventSetup need validation and CMS coding rules, streamline the code Data Flow: started porting what exists in (private version of) ORCA change later to fit emulator needs L1GlobalTrigger producer get the stuff working validate (using file input) integrate with GCT and GMT

Trigger Meeting, July 2006 C. - E. Wulz14 GT/GMT Software Configuration-DB-driven configuration operations implemented (incl. firmware loading) DB schema updated to be suitable for offline SW First working Configuration-DB entries generated, tools developed for transfer of HW configuration to DB Basic control & diagnostic functionality implemented in Trigger Supervisor cells Self-/Interconnection test routines being implemented /improved No significant change with respect to June Annual Review (see J. Varela’s transparencies).

Trigger Meeting, July 2006 C. - E. Wulz15 GT/GMT plans for MTCC In the second phase (August) of the MTCC the central LTC trigger should be replaced by the Global Trigger. Timing and synchronization must be established. The GT chain including the TCS but excluding the readout board is available. It should be completely tested with real data. The DTTF-GMT chain is also available and will be tested with real data. CSC and RPC should be added.