22nd May 2007 EURS Implementation Group Introduction and Objectives.

Slides:



Advertisements
Similar presentations
The Open Method of Coordination as an example of policy learning at the European Level Six Countries Programme Stockholm May 2006 Peder Christensen.
Advertisements

S.O.S. eHealth Project Open eHealth initiative for a European large scale pilot of patient summary and electronic prescription Daniel Forslund, Head of.
1 Future strategy for e-submission as seen by industry Dr Michael Colmorgen, IFAH-Europe 2nd Veterinary Workshop on E-submission 4 Dec 2009, EMEA, London.
1 Harmonisation of requirements: where we are Erik Waterdrinker, IFAH-Europe 2nd Veterinary Workshop on E-submission 4 Dec 2009, EMEA, London.
22nd May 2007 EURS Implementation Group Terms of Reference and Roadmap.
« HUMAN BIOMONITORING » Consultative Forum on Environment & Health 19th October 2005 in Luxembourg Update on developments.
From CESSDA to European Research Infrastructure Developments in cross-European data sharing.
PRESENTATION TO THE JOINT RULES COMMITTEE 15 MARCH 2012 ON THE PROGRESS ON IMPLEMENTATION OF THE INDEPENDENT ASSESSMENT PANEL ADOPTED RECOMMENDATIONS ADOPTED.
The European Activities of BR Communication e-CODEX e-Justice Communication via Online Data Exchange Bucharest, June 14 th 2013.
0 Indicators to measure the effectiveness of the implementation of the UNECE Strategy for ESD Expert group Indicators for ESD drs. R.M. van Raaij, ministry.
Presentation of the ERGEG Electricity Regional Initiative. South West Electricity Regional Energy Market 1st Implementation Group Meeting Madrid, 20th.
© Crown copyright Met Office SRNWP Interoperability Workshop, ECMWF January 2008 SRNWP Interoperability Alan Dickinson Met Office.
Financial Transaction Tax (FTT) Commission proposal for a Directive Council Legal Service opinion Council decision authorising enhanced cooperation January.
International Energy Agency Energy Conservation in Buildings and Community Systems Programme - ECBCS IEA Energy Conservation in Buildings & Community Systems.
End of Waste – Experiences from the UK Roger Hoare, Environment Agency 3rd October 2013 Malta 2013 IMPEL Conference on Implementation and Enforcement of.
We’re here for you. “European Exchange of Best Practice in Arson Investigation and Prevention” European exchange of best practice in arson investigation.
1 23 October 2003 Patrick LYNAM Chairman, Agency Group for Excellence EUROCONTROL Agency Journey to Excellence & Self Assessment.
EASAC science-policy dialogue project: phase 2 – 2011 Report of phone interviews with Academies Gill Petrokofsky October 2012.
1 Alternatives to detention: An overview of practices in 27 EU Member States Adriano Silvestri.
E-tax system stages 1.Stage 1 - Information: online information about public services 2.Stage 2 - Interaction: downloading of forms 3.Stage 3: Two-way.
AAL2 Active and Assisted Living Research and Development Program Presentation for the Symposium on Active Healthy Home 23 oktober 2014 Greet Bilsen.
Access to LifeLong Learning in Higher Education (ALLinHE) Work Package 3 Deliverable 8 National Reports.
An introduction to the EU and its legislation. Member States currently 15 –Austria- Ireland –Belgium- Luxembourg –Denmark- Netherlands –Finland- Portugal.
Reichstag, 1945 Frankfurter Allee, 1945 A Climate for Radical Change:
EFPIA EFPIA IT Proposals ppt Slide 1 EFPIA Proposals for IT Support to the European Regulatory Procedures Mr S. Hasler EFPIA PAT Regulation 2000.
European Parliament Advanced Therapies Hearing May 11, 2006 Advanced Therapies The proposed EU regulation from the viewpoint of a Pharmaceutical company.
Adoption and take up of standards and profiles for e-Health Interoperability Jos Devlies, EuroRec, Belgium based on a presentation by Ib Johanson, MedCom,
Community of Practice on partnership in the ESF 8 October 2007 Open Days Benedict Wauters Deputy Director Flemish ESF Agency COP partnership coordinator.
An agency of the European Union Presented by: David Mackay Head of Unit, Veterinary Medicines & Product Data Management Unit Incident Management Plan Veterinary.
Development and application of guidance documents – industry view Dr Martin Schaefer ECCA-ECPA Conference March 2014.
Linking trading schemes – considerations and lessons learned from EU ETS Jill Duggan IISD/WRI - Chicago November 2007.
Notur: - Grant f.o.m is 16.5 Mkr (was 21.7 Mkr) - No guarantees that funding will increase in Same level of operations maintained.
DEPARTMENT OF HEALTH Medicines Regulatory Affairs
Best Archival Practice in the Regulation of Medicines: Work on the Guidelines for Agencies for Medicinal Products Ph.D. Arian Rajh Agency for Medicinal.
2008LIFE presentation LIFE+ call for proposals.
European Reintegration Network Vilnius, Lithuania, 2 April 2015 From inception to Specific Action
Mats Wallin Swedish Univ. of Agricultural Sciences Dept. of Environmental Assessment Catarina Johansson Swedish Environmental Protection Agency Development.
REPUBLIC OF ALBANIA PUBLIC PROCUREMENT AGENCY E-procurement in Albania, up to date…
Energy Data Harmonisation Project N. Roubanis Eurostat.
© Enterprise Europe Network South West 2009 The Eurostars Programme Kenny Legg R&D Funding for the Environmental Sector – 29 June 2010 European Commission.
CTD Dossier Preparation K. Srikantha Reddy Sr
THE EUROPEAN UNION.
1 COMMON TECHNICAL DOCUMENT / ORIGIN OF CTD… ICH EWG CTD WAS OFFICIALLY SIGNED OFF IN NOVEMBER 2000, AT 5 TH ICH CONFERENCE; SAN DIEGO,CALIFORNIA.
Creating the environment for business Assessment of the Implementation by the Member States of the IPPC Directive Advisory Group Meeting Friday 13 th January.
Overview of the EU regulatory system and governance
Tallinn, 19 November 2009 Mike Coles Qualifications and Curriculum Authority, London The EQF – a platform for collaboration, integration and reform.
European Innovation Scoreboard European Commission Enterprise and Industry DG EPG DGs meeting, May 2008.
EUROPEAN UNION – MAKING OFF European Economic Community
Periodic Safety Update Reports (PSUR)
The Five Secrets of Project Scheduling A PMO Approach
Qualifications and Curriculum Authority, London
EMA policy on publication of clinical data – Update on implementation
REPORTING SDG INDICATORS USING NATIONAL REPORTING PLATFORMS
PRAG PRACTICAL GUIDE TO CONTRACT PROCEDURES FOR EXTERNAL ACTIONS
PRAG PRACTICAL GUIDE FOR CONTRACT PROCEDURES
The European Investment Advisory Hub Support to CEF Blending
City of London School – extra materials
Support to National Helpdesks
Support to National Helpdesks
Patrick Staes and Ann Stoffels
e-Invoicing – e-Ordering 20/11/2008
PORTUGUESE PRESIDENCY MANDATE FOR SOCIAL DIALOGUE
The European Anti-Corruption Report
"Financing Natura 2000 Guidance and Workshops”
REPORTING ON DELIVERY OF EU BIODIVERSITY ACTION PLAN
Why a KETs Observatory ? Commission Communication on Key Enabling Technologies (2012) : "There is no validated market data on development and take-up of.
Enterprise Content Management (ECM) Project
EUnetHTA Assembly May 2018.
Prodcom Statistics in Focus
Presentation transcript:

22nd May 2007 EURS Implementation Group Introduction and Objectives

22nd May 2007 Introduction Describe context of the meeting Introduce members of the group Establish objectives of meeting

22nd May 2007 The EURS: What Is It? European Review System A common European solution for the validation, management and review of eCTDs (and non-eCTD electronic submissions) A solution to be made available by EMEA for all agencies that choose to implement it. Goal is to enable all agencies to have a shared view of submissions, and shared view of lifecycle, for harmonised management during joint procedures (Centralised, MRP): –To provide confidence during interactions –Shared awareness of how lifecycle may be viewed –Shared validation Requirement for compatibility of output/input from builder tools to EURS Aim to reduce unilateral development and facilitate joint procedures

22nd May 2007 The EURS: What Is It? No requirement for a dedicated review tool in order to the access the eCTD submission eCTD is a self-contained standard –stylesheet means that a browser is the only requirement to navigate through the dossier and view information However, without a dedicated review tool, no use can be made of the powerful LCM capabilities inherent in the eCTD Important requirement of any eCTD review tool is the ability to handle non eCTD electronic submissions also (majority of legacy submissions)

22nd May 2007 EURS Concept of Operations

22nd May 2007 Background – Implementation Strategy Phase IJuly – Dec. 2003Basic System in place based on file server and a commercially available eCTD viewing solution. Limited implementation. Phase IINov – Nov. 2006EURS v1.0, in production for evaluation. Gathering of further requirements and subsequent implementation of EURS v1.1 via multiple tools, with more comprehensive functionality, as set out in specifications EMEA/2004/37/PM (October 2004). Implementation as wide as possible throughout EU NCAs. Phase IIIFrom [Dec. 2006]EURS v2.0: Fully featured single-tool EURS in production. Based on full specifications following experience with the EURS v1.0/v1.1. Implementation as wide as possible throughout the EU NCAs.

22nd May 2007 Context of Meeting – History of EURS December 2002: EURS v1.0 Requirements document published by TIGes. 2003: EMEA procurement procedure to select an EURS for general implementation A panel of EMEA representatives, MS assessors and MS IT experts met to evaluate the different tools presented Opinion expressed that eCTD experience was not sufficient to confidently select a single tool for use DocuBridge from Lorenz selected as an interim solution (for one year) to enable experience of tools and eCTD to be gained – felt to be the most mature tool at the time 12 month interim contract set up, to November 2004.

22nd May – docuBridge Interim Solution docuBridge from Lorenz selected in the tender procedure as was then the preferred tool in terms of reviewer functionality – seen as most mature tool. Users did not feel ready to commit to a long term solution (and support costs) before having real experience of eCTDs. Agreement to pursue negotiated contract for interim 12 month solution with Lorenz – shorter term solution. Testing period to allow agencies to gain experience with real eCTD submissions using a review tool, and build advanced processing and review requirements.

22nd May 2007 Multiple Tool Approach (1) October 2004: A decision was taken by the EURS Group to continue with the installations and testing of docuBridge, for another year, but to make available to all NCAs 2 additional review tools: –eCTDXpress from ISI –EURS is Yours from IABG

22nd May 2007 Multiple Tool Approach (2) No value seen in removing docuBridge from NCAs where installed – valuable experience being gathered NCAs felt the need to gain exposure to different tools – at present, no right or wrong ways of handling eCTDs – just different interpretations Exposure to different tools in business context will increase knowledge overall and enable a robust set of requirements to be finalised Objective was to come to an agreement on a robust final EURS v2.0 set of requirements and go to tender for a definitive single tool by September 2005 – this eventually happened July 2006 (a contract extension was required).

22nd May 2007 Latest Developments After a procurement procedure stretching from July 2006 – December 2006, a final commitment to a single review tool was made – EiY from IABG selected – unanimous decision Assessors in many agencies currently still view/review eCTDs using a browser and a stylesheet rather than using a dedicated review tool, even though there may be one available: –Partly due to anticipation of a decision as to a final single tool for long- term usage? –Partly due to an ongoing development of understanding of LCM and the benefits of the eCTD and review tools? –Partly due to lack of full eCTDs to load into a review tool? Objective is to turn this around with the implementation of a robust single review solution

22nd May 2007 Context of Meeting With the selection of a final EURS solution for long term implementation, the work of the EURS group in its previous incarnation is complete EURS Group now re-constituted to reflect the new challenge of the EURS implementation phase (no longer in the context of a specific procurement procedure), including central repository implementation Important to establish scope of work for the group, terms of reference, objectives and deliverables Focussed meetings with clear deliverables

22nd May 2007 Introduction of Group Members (1) Group of experts, EMEA and MS, representing different functions Current or future users of the EURS with experience and/or knowledge of the Centralised Procedure as well as other procedures –Scientific assessors, –Procedure coordinators, –Administrators Representatives with technical expertise –May be responsible for maintaining the tool internally and integrating with systems All nominees should have experience and/or clear understanding of the eCTD standard and implementation issues.

22nd May 2007 Introduction of Group Members (2) EMEA Representatives: –Post-authorisation –Safety and Efficacy of Medicines –Regulatory Affairs (Central Information Group) –Quality of Medicines

22nd May 2007 Introduction of Group Members (3) 15 Member States, 2 candidate countries represented: –Austria –Belgium –Czech Republic –Denmark –France –Germany (PEI and BfArM) –Greece –Hungary –Lithuania –The Netherlands –Norway –Portugal –Spain –Sweden –United Kingdom –Croatia –Turkey

22nd May 2007 Introduction of Group Members (4) Industry representatives from industry associations EFPIA, EuropaBio and EGA –Experience and/or a clear understanding/appreciation of the eCTD standard and implementation issues –Some practical experience of compiling, submitting and maintaining the lifecycle of eCTDs in European procedures

22nd May 2007 Main Objectives of the Group (1) Tool installation Monitoring and Management: –Management and discussion of the EURS contract –Monitoring of the installations of the IABG review tool under the conditions of the contract –Monitoring of the development of bespoke review tools or installation of other review tools by NCAs Specific discussion of use of the IABG tool (selected EURS) –Development of processes and guidance regarding the use of the IABG review tool –Provision of a forum for questions regarding any aspect of use of the IABG tool –Development of further requirements for the IABG review tool

22nd May 2007 Main Objectives of the Group (2) Requirements development –Development and clarification of complex requirements e.g. lifecycle management –Documentation and publication of requirements Provide a forum for discussion and resolution of issues (business and technical) associated with the implementation of the IABG tool, and other review tools, for use in all procedures –Consideration of workflow and the place of eCTD –Migration issues –Archiving issues –Management of non-eCTD electronic submissions –Process issues

22nd May 2007 Main Objectives of the Group (3) Implementation of the Central Repository for the Centralised Procedure –Strategy –Planning –Identification and resolution of issues: Process, Technical, Legal/political