SEA & ETC Strategic Environmental Assessment and European Territorial Cooperation programmes Annual meeting with the Managing Authorities of the ETC programmes.

Slides:



Advertisements
Similar presentations
1 Information and Publicity in programming period.
Advertisements

PlanCoast Guidelines and Key Messages First Findings and Ideas Angela Schultz-Zehden PlanCoast Coordination Office 21 st November 2007 Berlin.
20th November 2007 / Berlin PlanCoast Handbook/ Guidelines and Key Messages Angela Schultz-Zehden.
December 2005 EuP Directive : A Framework for setting eco-design requirements for energy-using products European Commission.
1 European Commission, DGENV.D. 3 Strategic Environmental Assessment Directive 2001/42/EC on the assessment of the effects of certain plans and programmes.
Regional Policy e-Cohesion – new initiative within IT systems of Member States in Shared Fund Management Common IT System for programming.
EN Regional Policy EUROPEAN COMMISSION Information and Publicity SFIT, 15 June 2006 Barbara Piotrowska, DG REGIO
The EU strategy on adaptation to climate change
EUROPEAN NEIGHBOURHOOD AND PARTNERSHIP INSTRUMENT - ENPI CROSS-BORDER COOPERATION PROGRAMMES.
Ex-ante conditionality – General guidance Workshop on strategic programming, monitoring and evaluation Ilse De Mecheleer, DG EMPL Madrid, 22 February 2013.
Cohesion Policy and Climate Change Viktoria Bolla DG ENV Unit C.1 ‘Climate strategy, International Negotiation and Monitoring of EU Action’ Tallinn, 4.
1 Strategic Environmental Assessment and SFs Operational Programmes: An assessment Jonathan Parker DG ENV ENVIRONMENT EUROPEAN COMMISSION Aarhus Workshop.
SUPPORTED BY THE EUROPEAN UNION’S OBNOVA AND PHARE PROGRAMMES EIA TRAINING RESOURCE MANUAL FOR SOUTH EASTERN EUROPE Scoping.
EU Wetland conservation policy. Communication on the Wise Use and Conservation of Wetlands (1995) => first European document dedicated exclusively.
1 CEER How to balance the public’s concerns and critical infrastructure construction Matti Vainio, Deputy HoU DG ENV – C.5, European Commission.
Secretariat to the Espoo Convention and its Protocol on SEA
04/2007 European Funds in Bulgaria Supported by the European Commission (DG ENV)
Peter Defranceschi ICLEI - Local Governments for Sustainability An Introduction European Commission GPP Training Toolkit.
SEA, horizontal environmental and climate issues and biodiversity for programming period Budapest, Ion Codescu, Head of Unit, DG ENV,
The SEA Directive – Implications, Obligations, Strengths and Weaknesses Workshop SEA in Practice Malta, 11 November 2011 Louis Meuleman Unit Cohesion Policy.
Strategic Environmental Assessment and environmental issues in programme evaluation Ivana Capozza Italian Evaluation Units Open Days Roma, July 5, 2006.
The model Modelling best practice in SEA a 10-step presentation.
Environmental Impact Assessment (EIA): Overview
Guidance for AONB Partnership Members Welsh Member Training January 26/
Croatian Report on new Environmental Protection Law Josipa Blažević-Perušić, B.Sc. Arch. State Secretary Anita Pokrovac-Patekar, B.Sc. Pharm. Senior Environmental.
Ministry of the Environment and Territory Directorate for Development and Environmental Research Ministry of Economy and Finance Department for Development.
EIA-legislation and practice in Norway history history latest amendments of regulations latest amendments of regulations integrated planning/EIA processes.
Environmental Impact Assessment in the Slovak republic.
PPSD in specific sectors in Bulgaria - Regional Plans for Development National Programme for Ports Development (2006 – 2015) Vania Grigorova, Jacquelina.
Environmental Impact Assessment of public and private projects EIA Directive 85/337/EEC as amended by 97/11/EC and 2003/35/EC Recent developments Laura.
Consultation seminar on the preparation of full Application Form for LSP 6 December 2011, Tartu Consultation seminar on the preparation of full Application.
The European SEA Directive Simon Marsden School of International Business, University of South Australia Module 1: Basics of SEA.
Environmental Dialogue between of Ministry of Natural Resources of Russia and the European Commission, DG Environment Workshop on The Espoo Convention.
SEA in the Czech Republic Prague, 24 September 2008.
Planned activities for 2016 on better implementation and better regulation in the field of environment policy Make It Work Conference 10/11 Dec 2015 DG.
Commission Guidance on inland waterway development in the context of the EU Birds and Habitats Directives Kerstin Sundseth, Ecosystems LTD.
CROATIA Country Report IPPC Directive: implementation, problems, constraints, open questions,… Anita Pokrovac Patekar, B. Sc. Pharm. Ministry of Environmental.
Agenda item 2.2 Progress on Target 1 Developments since CGBN of March 2012 CGBN Co-ordination Group for Biodiversity and Nature 13 th meeting – 06/09/12.
European Commission Directorate General Environment Page 1 Regulation (EC) No 2152/2003 of the European Parliament and of the Council concerning monitoring.
Greening the Structural Funds Programmes Agata Miazga-Payne on behalf of GRDP partnership.
DG ENV Environmental assessment procedures for energy infrastructure projects of common interest (PCIs)
EN Regional Policy EUROPEAN COMMISSION Information and Publicity Structural Funds Information Team Brussels, 30 June 2005 Barbara Piotrowska, DG REGIO.
SUPPORTED BY THE EUROPEAN UNION’S OBNOVA AND PHARE PROGRAMMES EIA TRAINING RESOURCE MANUAL FOR SOUTH EASTERN EUROPE The role of EIA and decision-making.
Peter Lukáč Ministry of Environment of the Slovak Republic Department of Environmental Assessment.
Experience of SEA in Scotland IAIA 07 Seoul 5 June 2007 Amanda Chisholm.
Disclosure and Public Consultation Transparency and Participation in the Application of Safeguard Policies Presenter: Johnson Appavoo Presentation prepared.
11/06/20161 Transport sector - Preparing for next programming period: SEA as part of ex-ante conditionality and ex-ante evaluation Adina Relicovschi Senior.
M O N T E N E G R O Negotiating Team for the Accession of Montenegro to the European Union Working Group for Chapter 27 – Environment Bilateral screening:
Strategic Environmental Assessment for the Operative Programmes Anita Gulam Ana Kovačević Ministry of Environmental and Nature Protection, Republic of.
Overview of public participation in strategic decision-making in the UNECE area David Aspinwall.
GREECE-ALBANIA IPA CROSS BORDER COOPERATION PROGRAMME
Business environment in the EU Prepared by Dr. Endre Domonkos (PhD)
Ex-ante conditionality – General guidance
DG Environment, Unit D.2 Marine Environment and Water Industry
Ex-ante conditionality
The partnership principle in the implementation of the CSF funds ___ Elements for a European Code of Conduct.
GPP Training Toolkit An Introduction European Commission
Relationship between World Bank and Romanian EA requirements
EC GUIDANCE ON IWT AND NATURA 2000 CHAPTER 3
Culture Statistics: policy needs
FISHERIES AND ENVIRONMENT
Overview of Article 6 procedures under the Habitats Directive
SCREENING SCOPING SEA QUALITY CONTROL DECISION
Overview of the implementation of the SEA directive
Guidance on Non-energy extractive industries & Natura 2000
DG Environment, Unit D.2 Marine Environment and Water Industry
DG Environment, Unit D.2 Marine Environment and Water Industry
DG Environment, Unit D.2 Marine Environment and Water Industry
DG Environment, Unit D.2 Marine Environment and Water Industry
Assessment scales and aggregation
Presentation transcript:

SEA & ETC Strategic Environmental Assessment and European Territorial Cooperation programmes Annual meeting with the Managing Authorities of the ETC programmes – 22/04/2013 Georges Kremlis – DG environment (Unit: Cohesion Policy and Environmental assessments)

The environmental assessment procedure Scoping Decision Information on decision Environmental Report/Study Screening Information and Consultation Monitoring Scope and level of detail of ENV report The “Report” (including a non-Technical summary) Public, environmental authorities, other MS Takes account of env. report and consultations End of SEA process Using screening criteria For P&P screened out (info on decision + reasons for non requiring SEA)

Provided that they fulfill certain requirements of the SEA Directive. Is the SEA Directive applicable to ETC programmes? Programmes financed by the European Union fall under the scope of the SEA Directive (Art 2). Provided that they fulfill certain requirements of the SEA Directive.

For which programmes is an SEA required? P&P prepared for agriculture, forestry, fisheries, energy, industry, transport, waste/ water management, telecommunications, tourism, town & country planning or land use AND which set the framework for future development consent of projects listed in Annexes I and II of the EIA Directive OR (b) that require an assessment under Article 6 or 7 of the Habitats Directive

Check whether the ETC programme: How to determine that SEA or screening is needed? Check whether the ETC programme: covers the relevant sector(s) and "sets the framework" for future authorisation of projects set out in EIA Directive (mainly infrastructure projects). OR "sets the framework" for future authorisation of projects (Art. 4(4)) (i.e. other than EIA projects). Similar situation with certain ESF programmes (training, education programmes) which will not lead to development of projects. Ex. of education or training programmes which do not involve the development of infrastructures; but if the programme is linked with construction of buildings for school/university, SEA is needed.

How is it decided that SEA is not applicable? Consult the relevant environmental authorities (all of them) on the applicability of the SEA Directive. A statement explaining the reasons why an SEA is not needed (no future development of projects at all; nature of the activities of the programme (only cooperation/network) etc..) needs to be prepared. A statement by the EAs confirming that the SEA is not applicable should be prepared.

Programme covers areas of Art Programme covers areas of Art. 3(2) + sets framework for development consent of future EIA projects SEA is needed (Annex I criteria) Programme sets framework for development consent of future projects (not EIA) screening is needed (Annex II criteria) Programme does not set the framework for development consent of any projects SEA Directive not applicable + explanatory statement

Getting started when an SEA is needed

Joint or separate SEAs procedures? In the absence of specific rules/requirements in the MSs: Managing Authorities and Environmental authorities (EAs) should agree on the procedure to be followed when starting the preparation of the Programme. Practical issues such as scope of the report, the preparation of a single or joint report(s), the timing and organisation of consultations should be decided early in the process. Joint body involving MAs and EAs from the MSs concerned could be set up. Regular meetings throughout the SEA process should be held (face to face or teleconference) to ensure general coordination.

Single or separate environmental report(s)? Scope of the report(s) (extent to which certain matters are assessed) : need to coordinate and agree. Consult all relevant Env. Authorities. Single SEA report = most advisable solution to cover the whole programme and assess its overall effects. However, separate reports are also acceptable. In case of separate reports: avoid important differences in the scope and level of detail of the reports. a synthetic presentation/summary of the overall effects of the OP providing an overview of the overall impacts of the Programme should be considered.

Organising consultations with the public & environmental authorities (Art. 6) Environmental authorities in all the MSs involved need to be consulted. From a practical point of view, it is very likely easier to organise consultations in each MS (linguistic aspects, national rules in relation to public consultation, time frames..) rather than a single public consultation. Consider the documents to be made available to the public: draft programme, environmental report + in case of separate procedures: non-technical summaries from the other MSs. Translation: to ensure appropriate public participation, relevant information (draft programme + at least non-technical summary) should be made available in the languages of the MS involved. Need to give the public and the EAs an early and effective opportunity within appropriate time frames to express their opinion on the draft plan and the environmental report(s).

Decision making (Art. 8) The environmental report and the opinions expressed (public + EAs) are taken into account during the preparation of the Programme and before its adoption. In case of separate procedures, need to coordinate in order to incorporate the results of the separate reports and of the different consultations into the programme.

Information on the decision (Art. 9) The programme as adopted. A statement summarizing how environmental considerations have been integrated and how the report and the opinions expressed have been taken into account Measures decided concerning monitoring. When a programme is adopted, public, and EAs are informed. The following items are made available: - No specific rules for ETC programmes. According to SEA Directive, after adoption of the programme, the public and EAs consulted must be informed. - Consider establishing a joint or separate statement(s) covering all the procedure(s). - Every MS should make it available according to its own procedures. - The statement should cover all the environmental report(s) and all opinions expressed.

Sources of information EIA / SEA Homepage: http://ec.europa.eu/environment/eia/home.htm Guidance on the implementation of the SEA Directive Studies and reports on the implementation of the EIA/SEA Directives Guidance on Integrating Climate Change and Biodiversity into Strategic Environmental Assessment: http://ec.europa.eu/environment/eia/pdf/SEA%20Guidance.pdf GRDP Handbook on SEA for Cohesion Policy 2007-2013 (Interreg IIIC, GRDP greening regional development programmes) http://ec.europa.eu/regional_policy/sources/docoffic/working/doc/sea_handbook_final_foreword.pdf