A framework to assess project technical progress.

Slides:



Advertisements
Similar presentations
Developing an Evaluation Strategy – experience in DFID Nick York Director – Country, Corporate and Global Evaluations, World Bank IEG Former Chief Professional.
Advertisements

Course: e-Governance Project Lifecycle Day 1
Test Automation Success: Choosing the Right People & Process
S Y S T E M S E N G I N E E R I N G.
PROGRAMME MANAGEMENT CONSULTING ARE YOUR PROJECTS IN CONTROL? Infrastructure Conference Oct 2014.
Sixth Hour Lecture 10:30 – 11:20 am, September 9 Framework for a Software Management Process – Artifacts of the Process (Part II, Chapter 6 of Royce’ book)
Enterprise Architecture. 2 Agenda What is Enterprise Architecture (EA)? Roles in EA? Why is EA Important? Tangible Benefits from EA? What Do We Need to.
Developing Information Security Policy. Why is Developing Good Security Policy Difficult? Effective Security/IA Policy is more than locking doors and.
Process Improvement.
©Ian Sommerville 2004Software Engineering, 7th edition. Chapter 28 Slide 1 Process Improvement.
Requirements Analysis INCOSE Systems Engineering Boot Camp
Software Engineering General Project Management Software Requirements
SE 555 Software Requirements & Specification Requirements Validation.
LEVERAGING THE ENTERPRISE INFORMATION ENVIRONMENT Louise Edmonds Senior Manager Information Management ACT Health.
How can projects be controlled?
Chapter 6– Artifacts of the process
What is Business Analysis Planning & Monitoring?
CS 4310: Software Engineering
Information Security Governance 25 th June 2007 Gordon Micallef Vice President – ISACA MALTA CHAPTER.
COMPGZ07 Project Management Presentations Graham Collins, UCL
CPTE 209 Software Engineering Summary and Review.
Business Analysis: A Business Unit Perspective International Institute of Business Analysis January 18, 2012.
Nurjana Technologies Company Presentation. Nurjana Technologies (NT) is a small business enterprise founded in 2012 and operating in Aerospace and Defence.
Fourteenth Lecture Hour 9:30 – 10:20 am, Sunday, September 16 Software Management Disciplines Project Control and Process Automation (from Part III, Chapter.
1 Lecture 3.1: Project Planning: Work Breakdown Structure (WBS) [SEF Ch 9] Dr. John MacCarthy UMBC CMSC 615 Fall, 2006.
Business Systems Development SDLC and introduction to the Microsoft Solutions Framework Team and Process Models.
1 Process Engineering A Systems Approach to Process Improvement Jeffrey L. Dutton Jacobs Sverdrup Advanced Systems Group Engineering Performance Improvement.
Overview of WP1 at a Glance Pierre Bonnal Engineering Department Scientist-in-Charge for CERN.
Identify steps for understanding and solving the
European Broadband Portal Phase II Application of the Blueprint for “bottom-up” broadband initiatives.
Systems Design Approaches The Waterfall vs. Iterative Methodologies.
IT Requirements Management Balancing Needs and Expectations.
Product Documentation Chapter 5. Required Medical Device Documentation  Business proposal  Product specification  Design specification  Software.
MeGIF Overview Joint initiative between Microsoft and the Victorian State Government Primary purpose of MeGIF is to: –Stimulate productivity & efficiency.
1 Chapter 23 Estimation for Software Projects. 2 Software Project Planning The overall goal of project planning is to establish a pragmatic strategy for.
Developing the competency of managers in the field of safety management Aidan Nelson Director Policy & Standards International Railway Safety Conference.
©Ian Sommerville 2000 Slide 1 Project management l Organising, planning and scheduling software projects l Objectives To introduce software project management.
Microsoft Office Project 2003: Selling EPM in your Organization Matt Wilson Business Solutions Specialist LMR Solutions.
Process Improvement. It is not necessary to change. Survival is not mandatory. »W. Edwards Deming Both change and stability are fundamental to process.
1 Excellence in Product Development. 10 th July BIFM Application.
QUALITY. QUALIDOC Web site: Telephone: 44+ (0) JEAN WHITE.
Bill Fournier Nov 2014 Systems Engineer for Non SE Bill Fournier
Information & Decision Superiority Case studies in applying AI planning technologies to military & civil applications Dr Roberto Desimone Innovations.
Lecture 2 –Approaches to Systems Development Method 10/9/15 1.
Role of PM in Airport Projects.  What constitutes a Successful Airport Implementation Programme?  Should the Process of Design and Construction of Airports.
Making knowledge work harder Process Improvement.
Project Management Basics
1 CP586 © Peter Lo 2003 Multimedia Communication Multimedia Development Team.
Requirements Engineering Processes, York EngD Programme, 2009Slide 1 Requirements engineering processes Prof Ian Sommerville.
1 Software Engineering Muhammad Fahad Khan Software Engineering Muhammad Fahad Khan University Of Engineering.
Organizations of all types and sizes face a range of risks that can affect the achievement of their objectives. Organization's activities Strategic initiatives.
The Context of Reliability Theory in Engineering Systems David Blockley University of Bristol Bristol UK by.
1 Using CobiT to Enhance IT Security Governance LHS © John Mitchell John Mitchell PhD, MBA, CEng, CITP, FBCS, MBCS, FIIA, CIA, CISA, QiCA, CFE LHS Business.
International Workshop Jan 21– 24, 2012 Jacksonville, Fl USA INCOSE IW 2012 MBSE Workshop INCOSE MBSE Initiative Methods and Metrics Activity John C. Watson.
Director Policy & Standards International Railway Safety Conference
NASA Model-Based Systems Engineering Pathfinder 2016 Summary and Path Forward Karen J. Weiland, Ph.D. Jon Holladay, NASA Systems Engineering Technical.
Project Cost Management
Successful Integration is a result of good governance – getting the wiring right Integrated care as an aspiration is simple, and simplest if one begins.
Document No: GSC-21_034 Source: ISO/TC 184/SC 4 Industrial data
KEYNOTE STAGE SPONSOR.
Changing funding arrangements for physiotherapy education in England
Document No: GSC-21_034 Source: ISO/TC 184/SC 4 Industrial data
Use of CMMI in an Acquisition Context Using CMMI for Process Improvement at USAF Space and Missile Systems Center (SMC) Dr. Jack R. Ferguson
Portfolio, Programme and Project
Consultancy Project Management CoP Specialty Skills
Chapter 26 Estimation for Software Projects.
Implications and opportunities for the sector?
MBSE for PLM: Part of the Digital Systems Life Cycle
‘Delivering better value from professional services’
Government Finance Function
Presentation transcript:

A framework to assess project technical progress

 General Engineering Maturity Measure ◦ A practical measure for Technical development activities ◦ Based on Systems Engineering principals ◦ Provide independent and unambiguous measure of progress  Not subjective estimate of completion  Not CMMI ◦ Measures the activity, not the business

◦ A practical and pragmatic measure for projects and programmes ◦ Scalable across technical problems  With modest tailoring ◦ Easy to deploy  Little training burden  Obvious and intuitive  Driven by existing or easily derived data  From PLM, MBSE and other common SE tools

 An evidence based measure of programme maturity ◦ For technical development activities ◦ Provides Evidence based decision making for:  Risk reduction  Resource management  Any programme ◦ Supports unambiguous P3M measures ◦ Great value on large complex programmes  In the context of broader business processes

 Widely Applicable ◦ Broader engineering processes ◦ Built on Systems Engineering principals  Reduce dependence on high levels of SE knowledge ◦ Straight forward application against familiar document set ◦ Naturally available from SE tools and techniques  Controlled review points ◦ Unambiguous objective measures ◦ Against planned expectations  Potential for Automation

 Derived from the Principals of EPaRT ◦ (Became GEAR)  EPaRT = Engineering Planning and Review Tool ◦ Planning and Review ◦ Status Audit ◦ Progress reporting  GEAR – Guidance to Engineering Activity and Review ◦ Focussed on Engineering artefacts ◦ In a procurement context

Objective & Blue-Print Organisation & Governance Stakeholder management Data Management Resource Management Uncertainty (Risk) Management Culture Communication Commercial Management Financial Management Schedule Management Requirements & Acceptance Technology Management Architecture Interfaces Supply Management Safety & Security Production Integration Sustainment & Environment Verification & Validation Deliverables Decision Processes Customer Business Poj/Prog Man Engineering Development of business GEMM P3M BSM

 Enshrined experience of Systems Engineering ◦ A more objective basis of assessment ◦ With recognisable Systems Engineering taxonomy  Based on tangible outputs ◦ Defined metrics ◦ Defined documentation set  Robust, Tailorable and Scalable ◦ Dual Independent measures ◦ Loosely coupled sources ◦ Common Tailoring model

 Metrics ◦ That reflect progress against dimension ◦ That are unambiguously measureable ◦ Based on stability (not absolute value)  Documentation ◦ Document status – what documents are expected at reviews ◦ Document Content – how documents reflect to progress  Intuitive to progress ◦ Graphically and logically Open Stable Chilled Frozen Locked

Technology and Architecture is more stable than Requirements

 Specific Review Agendas ◦ Clarity of expectation at all review ◦ In the same form  Common graphical presentation ◦ Supports immediate planning ◦ Supports trend analysis ◦ Project to project comparison  Connects to Project and Programme Management ◦ Support to Earned Value Management

 Unambiguous input to EVM/P3M processes  Traceable evidence based reviews ◦ Removes anecdotal and subjective maturity assessment ◦ Helps identify risks early  Relates to wider business context ◦ Communications… Data Management… Decision Making…

Dr Kevin Howard is Engineering Director at Optima Systems Consultancy providing strategic guidance to the business in its application of Systems Engineering across defence and civilian consultancy. He has been Vice President for Systems Engineering at AGT based in Zurich and head of Systems and Sensors for Thales. Kevin is Member of IET and INCOSE, Visiting fellow at Bristol University and a Guest lecturer at Cranfield University. He has reached this position through a practical engineering route in positions of Chief Engineer for various major programmes across defence and civilian world including armoured fighting vehicle, space borne radars, and software data fusion engines. GEMM is based on this pragmatic and practical backdrop to systems engineering approach that is underpinned by a deep understand across a range of technologies from automotive mechanics, through electronics, RF and antennas to pure software. He is a strong proponent of Model Based Systems Engineering and GEMM is closely aligned to a Model Based approach. This is supported by a PhD in optimising complex systems by minimising their entropy.