Information Society and Media Directorate-General - Unit Grid Technologies Call5 Information Day Slide 1 FP6 instruments: purposes and modalities in the.

Slides:



Advertisements
Similar presentations
Using public procurement to foster research and innovation More Research and Innovation COM(2005) 488 of 12 October 2005 Commission communication to the.
Advertisements

1 Six Countries Programme Conference "The Future of Research" April 2005 Effective research: changing perspectives for public R&D labs Isabelle Collins.
Support for the coordination of activities ERA-NET - 1 Coordination of national and regional programmes Introduction to the ERA-NET scheme European Commission.
Information Society Programme Trust & Security Trust & Security Unit Information Society Directorate-General.
– Seoul December 06 ERCIM Preparing European proposals Bruno Le Dantec ERCIM EEIG France – Seoul December 2006.
Beijing, China, July 2005 How to set EUROPEAN PROPOSAL Rémi RONCHAUD ERCIM EEIG France Beijing, China, July 2005.
Zürich, January 28, 2009 ERCIM WG eMobility Meeting Torsten Braun University of Bern, Switzerland
European Commission - Directorate-General for Research IP short.doc 1 FP6 Integrated Projects FP6 Integrated Projects A new instrument for supporting.
European Commission - Directorate-General for Research Networks of Excellence NoEshort.doc 1 FP6 Networks of Excellence A new instrument for.
European Commission - Directorate-General for Research Instr.short.doc 1 Instruments for implementing FP6 priority themes Instruments for implementing.
Planning and use of funding instruments
The Implementation Structure DG AGRI, October 2005
Illustrated Story on funding research Europides has got the instruments!
GRIDS infrastructures under the 6th FP Contractual and financial modalities Christophe KOWALSKI European Commission, Information.
Information Society Technologies CPA 10 Next generation micro & nano technologies in WP 2001, call seven DG Information Society European Commission.
Information Society Technologies In the 6th Framework Programme Context and instruments.
The Managing Authority –Keystone of the Control System
Information and Communication Technologies (ICT) in the Seventh Framework Programme Coordination actions ICT Calls Jan- March 2012.
INFSO/F3 1 Guide for proposers Willy Maes INFSO/F3, EC TEN-TELECOM Information Day.
European Commission DG Research Co-operative Research Training Session on Ifigeneia Pottaki Research & SMEs DG Research - European Commission Training.
1 Research and SMEs in the 6th Framework Programme Xabier Goenaga DG Research - European Commission Brussels, October 15th, 2002.
European Commission DG Research SMcL Brussels SME-NCP 23 October 2002 THE 6th FRAMEWORK PROGRAMME Economic & Technological Intelligence S. McLaughlin.
Slide 1 Research in support to Human Biomonitoring E&H, Consultative Forum Meeting 19 October 2005 Luxembourg P. Valette DG Research, Directorate Environment.
1 17/3/2009 European Commission Directorate General Information Society & Media Funding Instrument Briefing for Remote Reading.
FP IST-5 Research Networking Testbeds Maria F. Ramalho 26 May 2005.
EC -DG Research Dir. D : Human Factor, Mobility and Marie Curie Actions The provided information might still be revised TRAINING THE TRAINERS Initial training.
Enterprise Directorate General European Commission Supporting NCPs’ activities Irja Vounakis
10/10/ NCP presentation An outline of the implementation of Co-ordination Actions (CAs) in the Sixth Framework Programme (as of October 2002) europa.eu.int/comm/research/nfp/networks-ip.html.
Characteristics of projects in EU research programmes
European Commission Research 1 The 6th FRAMEWORK PROGRAMME FOR RESEARCH AND TECHNOLOGICAL DEVELOPMENT Richard ESCRITT Director Co-ordination of Community.
Citizens and governance in a knowledge based society Information on the forthcoming calls in Priority 7 NCP Meeting, 3 December 2004 DG Research K.3.
The “Knowledge sharing platform” in the 6th EC FP Initial training for National Contact Points Brussels 30th October 2002 by Belmiro MARTINS,
Guide for Proposers Research Infrastructures Integrated Infrastructure Initiative - I3 Bernhard FABIANEK European Commission,
Information and Communication Technologies (ICT) in the Seventh Framework Programme Large-scale integrating projects (IPs)
Information and Communication Technologies (ICT) in the Seventh Framework Programme Support actions.
SMEs in the. SMEs in FP7 - why? SMEs are at the core of European industry and key players in the innovation system. SMEs have to respond increasingly.
Information Society Technologies Industrial participation in the programme José C. COTTA Head of Unit - International Aspects of the Programme; Innovation.
The IST Programme Information Society Technologies Programme (IST ) 1 FP5: IST Programme Information Society Technologies IST Programme How it works Jacques.
Stefano Fontana European Commission DG RTD Research for the benefit of SMEs SMEs in the.
Provisional FP7-ICT InfoDay, Torino, 11/12/ The ICT Theme in FP7 How to submit a proposal 2. The Funding schemes.
Sixth Framework Programme INTRODUCTION . Contents Contents of FP6 Instruments in FP6 Financing Budgets Timetable Highlights.
FP6 Project Organisation. Participating in FP6 How Projects Are Organised FP6 research projects are almost always collaborative 1 and implemented using.
Work Programme for the specific programme for research, technological development and demonstration "Integrating and strengthening the European Research.
Implementation Instruments for FP6 Thematic Priorities Joseph Prieur - Aeronautics DG Research- Space &Transport.
“Thematic Priority 3” Draft Evaluation of IP + NoE.
1 SMEs – a priority for FP6 Barend Verachtert DG Research Unit B3 - Research and SMEs.
Integrated Projects & Networks of Excellence Examples in IST.
24 April 2003 FP6 and the new Thematic Priority Instruments FP6 Launch Conference - Istanbul Leonidas Karapiperis European Commission Research DG.
How to take part in the FP6 Nuclear Fission and Radiation Protection Programme How to take part in the FP6 Nuclear Fission and Radiation Protection Programme.
Danish Agricultural Advisory Service National Centre Possibilities and limits in a Specific Support Action By Erik Fog and Michael Tersbøl, DAAS European.
Ministerie van Economische Zaken 1 SenterNovem is een agentschap van dr. ir. Matthijs Soede Poznan, 15 January 2007 Types of projects in FP7.
Warszawa 18 luty th Framework Programme NMP - 2nd Calls Integrated Projects for SMEs Hervé Péro, Christophe Lesniak DG Research.
Poznan 19 April Kwietnia 2005 Poznan FP6 The Next Calls for 2005 Technology Platforms FP7.
Participation and dissemination Rules and Contracts FP6.
European Commission - DG Research - Directorate B – “Structuring the European Research Area” Jean-David MALO – Bucharest, February 12-13, NOT LEGALLY.
European Commission Research 1 Participation in the EU 6th Framework Programme for Research and Technological Development Peter Härtwich, DG Research,
11 November 2002 “FP6 Integrated Projects” Leonidas Karapiperis Research DG europa.eu.int/comm/research/fp6/networks-ip.html.
Information Society Technologies in the 6th Framework Programme Instruments in IST Call 4 Information Days Athens 13 December 2004 Athens 13 December 2004.
Information Society Technologies in the 6th Framework Programme Information Society Technologies in the 6th Framework Programme FP6 Instruments The EPSS.
1 STREPS INTELLIGENT HERITAGE IN FP6. “Traditional Instruments in FP6 ” An outline of the implementation of Specific Targeted Research Projects (STREPs)
E u r o p e a n C o m m i s s i o n - W a r s a w 2002 Sixth Framework Programme Instruments.
Sixth Framework Programme : Contracts è Legal Framework & General Principles è Contract Structure è Collective Approach l signature and entry.
10 February “FP6 Networks of excellence” Colette Renier Research DG.
11 October Integrated Projects (IP) “FP6 Integrated Projects” A provisional description of integrated projects as an instrument for implementing.
Richard Escritt, Director – Coordination of Community Actions DG Research, European Commission “The development of the ERA: Experiences from FP6 and reflections.
2. The funding schemes ICT Proposer’s Day Köln, 1 February 2007 The ICT Theme in FP7 How to participate to ICT in FP 7.
Participation and dissemination Rules
Priority 3 NMP: generalities
Information Society Technologies in the 6th Framework Programme
Presentation transcript:

Information Society and Media Directorate-General - Unit Grid Technologies Call5 Information Day Slide 1 FP6 instruments: purposes and modalities in the IST context Annalisa Bogliolo DG Information Society Grid Technologies Call5 Information Day Call5 Information Day 30 May 2005 Brussels Architecture, of the next generation Grid Enabling application technologies Design and Development

Information Society and Media Directorate-General - Unit Grid Technologies Call5 Information Day Slide 2 A range of better differentiated instruments New instruments New instruments Integrated projects (IP) - objective driven Networks of excellence (NoE) - exploratory research Article 169 (joint implementation of national programmes) Traditional instruments Traditional instruments Specific targeted research projects (STREPs) Co-ordination actions (CAs) Specific Support Actions (SSAs)

Information Society and Media Directorate-General - Unit Grid Technologies Call5 Information Day Slide 3 Classification of the instruments

Information Society and Media Directorate-General - Unit Grid Technologies Call5 Information Day Slide 4 Networks of Excellence Industrial exploitation Current Industrial strength / presence Fundamental research Basic research Industry-driven research Targeted Research Projects Example of implementation in IST « Monolitihic » Incremental Integrated Projects

Information Society and Media Directorate-General - Unit Grid Technologies Call5 Information Day Slide 5 FP6 Instruments in call5 for the S.O Advanced Grid Technologies, Systems and Services New instruments New instruments Integrated projects (IP) - objective driven Networks of excellence (NoE) - exploratory research Article 169 (joint implementation of national programmes) Traditional instruments Traditional instruments Specific targeted research projects (STREPs) Co-ordination actions (CAs) Specific Support Actions (SSAs)

Information Society and Media Directorate-General - Unit Grid Technologies Call5 Information Day Slide 6 Integrated Projects

Information Society and Media Directorate-General - Unit Grid Technologies Call5 Information Day Slide 7 Integrated projects designed to generate the knowledge required to implement the priority thematic areas of FP6 designed to generate the knowledge required to implement the priority thematic areas of FP6 by integrating the critical mass of activities and resources needed to achieve ambitious, clearly defined scientific and technological objectives of a European dimension each IP should each IP should integrate the types of activities needed to obtain the goals integrate the critical mass of resources needed to obtain the goals integrate elements of the development chain to attain high- impact goals support industry-academia collaboration including SMEs

Information Society and Media Directorate-General - Unit Grid Technologies Call5 Information Day Slide 8 Integrated Projects - activities Activities in a Integrated Project may cover a broad spectrum e.g.: Activities in a Integrated Project may cover a broad spectrum e.g.: research and technology development activities demonstration activities technology transfer or take-up activities training activities dissemination activities knowledge management and exploitation An Integrated Project should comprise An Integrated Project should comprise a coherent set of activities with an appropriate management structure

Information Society and Media Directorate-General - Unit Grid Technologies Call5 Information Day Slide 9 Time Integration along the innovation cycle Best practice Take-up, trials Industry driven research Adoption IP Basic research

Information Society and Media Directorate-General - Unit Grid Technologies Call5 Information Day Slide 10 Integrated Project what is critical mass? Resources: each IP must assemble the critical mass of resources needed to achieve its ambitious objectives Resources: each IP must assemble the critical mass of resources needed to achieve its ambitious objectives activities integrated may range up to several millions (no minimum threshold, provided necessary ambition and critical mass is achieved) Duration: typically three to five years Duration: typically three to five years but more if necessary to deliver the objectives

Information Society and Media Directorate-General - Unit Grid Technologies Call5 Information Day Slide 11 Integrated Project what is critical mass? (contd) Partnership: minimum of three participants from three different Member States or Associated States, of which at least two should be Member States or Associated candidate countries Partnership: minimum of three participants from three different Member States or Associated States, of which at least two should be Member States or Associated candidate countries but in practice likely to be substantially more SME participation is strongly encouraged Third country participants may be included, with a possibility of Community financial support for certain groups of countries

Information Society and Media Directorate-General - Unit Grid Technologies Call5 Information Day Slide 12 Integrated Project - evaluation process Evaluation by a strengthened peer-review system Evaluation by a strengthened peer-review system involving one step written submission. 5 individual evaluators, panel sessions with hearings of proposals that pass all thresholds Key issues to be addressed during evaluation: Key issues to be addressed during evaluation: relevance to the objectives of the specific programme scale of ambition and potential impact S&T excellence quality of the consortium quality of the project and knowledge management critical mass in terms of activities and resources

Information Society and Media Directorate-General - Unit Grid Technologies Call5 Information Day Slide 13 Integrated Projects Reporting and Payment schedule Annual report containing: Annual report containing: outline of previous 12 months activities financial documents on the costs incurred detailed implementation plan and associated financial plan for the following 18 months Upon acceptance of above by the Commission: Upon acceptance of above by the Commission: final settlement of payment for period concerned outstanding advance supplemented up to 85% of the anticipated Community contribution for following 18 months

Information Society and Media Directorate-General - Unit Grid Technologies Call5 Information Day Slide Months Reporting Accepted costs Reporting Detailed work plan Accepted costsAdjusted advance Reporting Detailed work planAccepted costs Adjusted advance Reporting Accepted costs Detailed work plan Adjusted advance Detailed work plan Initial advance Integrated Projects payment & report schedule (contd) Example of 4 year contract

Information Society and Media Directorate-General - Unit Grid Technologies Call5 Information Day Slide 15 Integrated Projects flexibility & autonomy For the implementation plan, each year, the consortium For the implementation plan, each year, the consortium proposes a detailed plan for the coming 18 months and may propose to update the overall plan For changes in the consortium For changes in the consortium the consortium may itself decide to take in new participants (without additional funding) the Commission may decide to launch calls to add activities and participants (with additional funding)

Information Society and Media Directorate-General - Unit Grid Technologies Call5 Information Day Slide 16 Monolithic Partners known at outset Tasks identified budget known Incremental participation Tasks identified budget known not all participants are in Incremental funding objectives known technology roadmap known tasks to be completed budget to be changed Participants as well Integrated Projects three possible implementations

Information Society and Media Directorate-General - Unit Grid Technologies Call5 Information Day Slide 17 STREPs

Information Society and Media Directorate-General - Unit Grid Technologies Call5 Information Day Slide 18 STREP designed to designed to generate the knowledge required to improve European competitiveness meet the needs of society or Community policies: by improving existing or developing new products, processes or services and/or by proving the viability of new technologies offering potential economic advantage

Information Society and Media Directorate-General - Unit Grid Technologies Call5 Information Day Slide 19 STREP - Activities May combine any of the following types of activities: May combine any of the following types of activities: Targeted, well defined and precisely focused research and technological development Demonstration component(s) as appropriate Project management

Information Society and Media Directorate-General - Unit Grid Technologies Call5 Information Day Slide 20 STREP - main characteristics STREPs compared to IPs: STREPs compared to IPs: scale of ambition is much more limited Different: Value of activities, Duration, Size of the consortium, Types of activities, Evaluation process/key issues (partly), Negotiation, Consortium agreement, implementation (partly), Follow-up (partly) STREPs compared to FP5 RTD projects : STREPs compared to FP5 RTD projects : Similar: Objectives, Scale of ambition, Value, Duration, Size of consortium, Types of participants, Calls, Evaluation, Negotiation, Follow-up, Audits Different: Financial regime, Simplified Proposals, Contractual aspects, Consortium agreement, Collective responsibility, Implementation, IPR

Information Society and Media Directorate-General - Unit Grid Technologies Call5 Information Day Slide 21 Strategic Support Actions

Information Society and Media Directorate-General - Unit Grid Technologies Call5 Information Day Slide 22 Strategic Support Actions (SSA) designed to underpin the implementation of the programme complement the other FP6 instruments help in preparations for future Community research and technological development policy activities stimulate, encourage and facilitate participation to the activities of the priority thematic areas of: SMEs, small research teams, newly developed and remote research centres, organisations from NMS / AC may combine the following two types of activities Support activities Project management activities

Information Society and Media Directorate-General - Unit Grid Technologies Call5 Information Day Slide 23 SSA - main characteristics SSAs: SSAs: support the implementation of the programme, priority or research objective - in most cases - stand alone events (meetings, conferences, studies etc.) future oriented activities: research roadmaps, identification of future research objectives dissemination and uptake of programme results SSA is NOT an instrument to fund research activities SSA is NOT an instrument to fund research activities

Information Society and Media Directorate-General - Unit Grid Technologies Call5 Information Day Slide 24 SSA - activities may consist of one or more of the following activities: may consist of one or more of the following activities: Conferences, seminars, working groups and expert groups Studies, analysis Fact findings and monitoring Trans-national technology transfer and take-up related services Development of research or innovation strategies High level scientific awards and competitions Operational support and dissemination, information and communication activities

Information Society and Media Directorate-General - Unit Grid Technologies Call5 Information Day Slide 25 Coordination Actions

Information Society and Media Directorate-General - Unit Grid Technologies Call5 Information Day Slide 26 Coordination Actions designed to promote and support the networking and co-ordination of research and innovation activities at national, regional and European level over a fixed period designed to promote and support the networking and co-ordination of research and innovation activities at national, regional and European level over a fixed period by establishing in a coherent way coordinated initiatives of a range of research and innovation operators, in order to achieve improved integration of the European research May combine the following two types of activities May combine the following two types of activities Co-ordination activities Consortium management activities

Information Society and Media Directorate-General - Unit Grid Technologies Call5 Information Day Slide 27 CA - activities may consist of one or more of the following types of mid/long term collaborative activities: may consist of one or more of the following types of mid/long term collaborative activities: Organisation of conferences, or meetings Performance of studies, analysis Exchanges of personnel Exchange and dissemination of good practice Setting up of common information systems Setting up of expert groups Definition, organisation, management of joint or common initiatives CA is NOT an instrument to fund research activities CA is NOT an instrument to fund research activities

Information Society and Media Directorate-General - Unit Grid Technologies Call5 Information Day Slide 28 Expected scale for STREPs, SSAs, CAs Resources: each project must assemble the resources needed to achieve its objectives Resources: each project must assemble the resources needed to achieve its objectives activities included may range up to several millions of but no minimum threshold Partnership: minimum of three participants from three different countries (for an SSA a single one is eligible) Partnership: minimum of three participants from three different countries (for an SSA a single one is eligible) but in practice likely to be more SME participation is strongly encouraged Third country participants may be included, with a possibility of Community financial support for certain groups of countries Duration: typically two to three years Duration: typically two to three years but exceptionally more if duly justified as necessary to deliver the objectives

Information Society and Media Directorate-General - Unit Grid Technologies Call5 Information Day Slide 29 Payments and reporting schedule Final activity report Reported costs + audit certificate (mandatory) Final payment Periodic activity report (mid-term review : optional) Reported costs + (audit certificate if required) Intermediate payment/ settlement Detailed work plan Initial advance Months Example of a three year STREP, CA or SSA project

Information Society and Media Directorate-General - Unit Grid Technologies Call5 Information Day Slide 30 Costs reporting, advance payments, allocation No cost categories but list of ineligible costs No cost categories but list of ineligible costs Participants own accounting rules Participants own accounting rules Periodical cost certificates by external auditor Periodical cost certificates by external auditor Periodical advances and settlements Periodical advances and settlements yearly for IP and NoE periodicity of settlements to be specified in the contract for other instruments No pre-allocation of the EC contribution between participants (funding is granted to the consortium as a whole) No pre-allocation of the EC contribution between participants (funding is granted to the consortium as a whole) new! new! new! new! new!

Information Society and Media Directorate-General - Unit Grid Technologies Call5 Information Day Slide 31 Financing per instrument

Information Society and Media Directorate-General - Unit Grid Technologies Call5 Information Day Slide 32 For further information IST infodesk Fax : General FP6: