FLOW-SHEETING What we will cover here? PFD?

Slides:



Advertisements
Similar presentations
Piping & Instrumentation Diagram
Advertisements

 Materials & Fittings  What to buy  Quantity  Cost  Where to get them  When to buy i.e. before work starts  Blue print; this tells us the number.
Piping and Instrument Diagrams
PLANT DESIGN (I) Prof. Dr. Hasan farag.
1 Cycle 1 Overview: Heat Exchanger CM4110 Week 2 (T and R) Sandell.
CHE 185 – PROCESS CONTROL AND DYNAMICS
DVC 3.34 Produce working drawings to communicate production details for a complex design Lesley Pearce Team Solutions The Auckland University Nov 2012.
Group Meeting #1 January 29 th, 2013 Michael Bentel Jeremy David Erik Peterson Arpit Shah 1.
Chemstations, Inc – Houston, TX – – An Overview of Process Simulation What is needed? What are the steps?
Dr. F. Iskanderani Spring 2003/2004 Example C : Component.
The Piping and Instrumentation Diagram Schematic of a control system –more detailed than process flow diagram –does not include values of parameters Used.
Chapter 11 Simulating Wireless Control. Simulate Parameter – Analog Input Block  The current or digital outputs of these transmitters and switches are.
PROJECT AND STUDY DRAWINGS & DIAGRAMS
Chapter 1 - Chemical Process Diagrams
Computer Assisted Process Design---HYSYS Bo Hu. Introduction HYSYS is only one process simulation program out of a number. Steady State Processes ASPEN.
Objective : To understand the fabrication, design, installation welding, inspection and testing for new construction in oil and gas industry After followed.
-P&ID- Piping & Instrument Diagram
HAZARD AND OPERABILITY STUDY
Given a P&ID, the learner will be able to identify the purpose of that P&ID according to their student guide. – Given a P&ID, locate the title block and.
Mechanical Measurement and Instrumentation MECN 4600
Bioprocess Diagrams Including PFD and P&ID
Construction Drawing Occupational Safety and Fundamentals
DYNAMIC BEHAVIOR AND STABILITY OF CLOSED-LOOP CONTROL SYSTEMS
P&ID’s PIPING & INSTRUMENTATION DIAGRAMS.
PIPETECH CONSULTANCY WELCOME TO PIPE TECH CONSULTANCY
Chapter 15 - Heat Exchange Networks
- Overview about Malaysia oil and gas - level of realism to traditional drawing (2D dwg) - Be able to store huge amount of data referring. - Single source.
Pinch technology series
FOOD ENGINEERING DESIGN AND ECONOMICS
The Scientific Method Tables, Charts and Diagrams.
ERT 213 PROCESS INSTRUMENTATION BY: ZULKARNAIN MOHAMED IDRIS
The Theoretical Design
+ Example processes P1. sterilizing ketchup. + Problem statement Heinz Ketchup is made in just a few plants in North America, one of which is in Fremont,
First Second first second first second third fourth.
Advanced control strategies. CONTROL SYSTEMS The process parameters which are measured using probes described in the previous sections may be controlled.
CHEMICAL PROCESS DIAGRAM
Chapter 1: Diagrams for Understanding Chemical Processes
PROCESS DESIGN DEVELOPMENT
Project Management Terry A. Ring Chemical Engineering University of Utah.
0 Design Change Construction & Completion Management (Outline and related procedures) Hanul NPP Engineering Center.
Guided by: Prof. Ashish Modi Pacific School of Engineering, Surat.
HAZARD AND OPERABILITY STUDY Brainstorming, Multidisciplinary Team Approach Structured Using Guide Words Problem Identifying Cost Effective.
04/06/2010 Production of Dimethyl Sulfoxide from Lignin Team Bravo is: Stan Das, Jeff Umbach, Russ Boyer, Krista Sutton, Mike Czepizak Project Lead: Jake.
PIPELINES VIJAY VADER. PROCESS PLANTS  Essentially handling liquid/gases/solids  Need to transport them from one stage to another.  Transportation.
Kraft Summer Intern 2015 Jacob Herbstritt.
1. Engineering 2. Purchasing 3. Other department package assistances 4. Site supervision Instrument Department Activities:
CHEMCAD Process Safety Emergency Relief John Edwards, P&I Design Ltd
BSB Biomanufacturing CHAPTER 2 Process Plant Design – Part III
Flowsheeting: What is a flowsheeet Importance of flowsheet
Government Engg. College Valsad
Component And Instrument Symbols
Chemical Engineering Drawing
P&ID SYMBOLS.
Welcome! Drafting 2323: Pipe Drafting
Extra Homework Required for Friday
Professor Robert L. Heider, PE
FLIPPED CLASSROOM ACTIVITY CONSTRUCTOR – USING EXISTING CONTENT
Introduction to process control
Introduction to Chemical Process Design
Estimating Capital Costs
Work Charting Methods Topics: Pareto Chart – part 1
Test #3; Symbology; Process Diagrams – Part 1 - Agenda
Control System Instrumentation
Chapter 4 Material Balances.
Chemical Process Diagrams
Introduction to process control
Piping and Instrumentation for Process Industries
CHAPTER 2 Description of Chemical Processes
Production of Propylene from Methanol
ADVANCED THERMODYNAMICS 8th semester
Presentation transcript:

FLOW-SHEETING What we will cover here? PFD? Preparation and presentation of PFD P&ID? Preparation and presentation of P&ID

FLOW-SHEETING PFD? A shorter version of process flow diagram A key document of process design Shows the arrangement of the equipment, the streams connection, streams flow rates and composition and the operating conditions. Diagrammatic model of the process

FLOW-SHEETING PFD? Used as the basis for the next steps in the design, including piping, instrumentation, equipment design and plant layout. Drawn up from material balances made over the complete process and each individual unit operation.

FLOW-SHEETING PFD? Most calculations on PFD are carried out using commercial process simulation software.

FLOW-SHEETING FIG 4.1

FLOW-SHEETING FIG 4.2

FLOW-SHEETING 2) PFD Preparation and Presentation Essential Infos: Stream composition, either - Flow rate of individual component (kg/h) or as weight fraction b) Total stream flow rate, kg/h c) Stream temperature (oC) d) Stream pressure Fig 4.1/ 4.2A (with some modification): What I expect in your design project.

FLOW-SHEETING 2) PFD Preparation and Presentation Layout - Sequence of the main equipment items shown symbolically on the PFD follows that of the proposed plant layout. - Some license must be exercised in the placing of ancillary items, such as heat exchangers and pump, or the layout will be too congested

FLOW-SHEETING 2) PFD Preparation and Presentation Layout The equipment should be drawn approximately to the scale. Should be drawn in correct proportion. Ancillary items can be drawn out of proportion. For a complex process, several sheets may be needed, and the continuation of the process streams from one sheet to another must be clearly shown.

FLOW-SHEETING 2) PFD Preparation and Presentation Layout Fig 4.2 shows one method indicating a line continuation. Table of stream flows and other data (T, P) can be placed above/ below the layout. (Fig 4.2) The stream line numbers should follow consecutively from left to right of the layout

FLOW-SHEETING 2) PFD Preparation and Presentation Layout All the process streams should be numbered. Batch Process Normally show the quantity required to produce one batch. If, a batch process forms part of an otherwise continuous process, it can be shown on the same flow sheet, providing a clear break is made when tabulating the data between the continuous and batch sections. i.e., the change from kg/h to kg/ batch.

FLOW-SHEETING 2) PFD Preparation and Presentation Batch Process In a case where a batch process included in a continuous process, the flow usually labelled as ‘Normally no flow’, and show the flow rates that will be obtained when the stream is flowing.

FLOW-SHEETING 2) PFD Preparation and Presentation Utilities. Usually only headers and lines were shown in the process flow sheet. Equipment Identification -Must be identified with a code number a name. H-xxxx (Heat exchanger), R-xxxx (Reactor), C-xxxx (Column).

FLOW-SHEETING What we will cover here? PFD? Preparation and presentation of PFD P&ID? Preparation and presentation of P&ID

FLOW-SHEETING 3) The P and I Diagram Shows the arrangement of the process equipment, piping, pumps, instruments, valves and other fittings, It should includes; a) All process equipment identified by an equipment number. Should be drawn roughly in proportion, and the location of the nozzles shown.

FLOW-SHEETING b) All pipes, identified by line number. The pipe size and material of construction should be shown. The material may be included as part of line identification number. c) All valves, control and block valves, with an identification number. The type and size should be shown. The type may be shown by the symbol.

FLOW-SHEETING d) Pumps, identified by a suitable code number e) All control loops and instruments, with an identification number. f) Process information is not shown.