Draft Framework Guidelines on System Operation - Process Presentation Workshop, Ljubljana, 24 August 2011 Uroš Gabrijel (ACER)

Slides:



Advertisements
Similar presentations
WECC/TEPPC Response to DOE Funding Opportunity Status Update June 29, 2009 Bradley Nickell Renewable Integration and Planning Director.
Advertisements

Research and Innovation Why does ERA Need to Flourish ERA - State of Play Octavi Quintana Trias Brussels, 19th April 2013.
Research and Innovation Why does ERA Need to Flourish ERA – State of Play ERA Monitoring and ERA progress report Fabienne Gautier Dublin, 14th June 2013.
Electricity Balancing Framework Guidelines
Day-Ahead Market Coupling Proposal for algorithm approval process 8 th ACER Coordination Group for ERI Brussels, 9 th January 2012.
TEN-T Info Day for AP and MAP Calls 2012 EVALUATION PROCESS AND AWARD CRITERIA Anna Livieratou-Toll TEN-T Executive Agency Senior Policy & Programme Coordinator.
Scoping the Framework Guidelines on Interoperability Rules for European Gas Transmission Geert Van Hauwermeiren Workshop, Ljubljana, 13 Sept 2011.
TITRE Public Workshop on REMIT Ljubljana, 19 July 2012 Public consultation document on ACER recommendations on REMIT records of transactions and implementing.
Update on Transparency Obligations Martin Reisner Junior Adviser, Transparency ENTSOGs Transparency Workshop Brussels – 11 September 2012.
1 TITRE Identifying priorities for GRI NW and setting agenda for Menno van Liere Programme Officer GRI NW 11 th Stakeholder Group meeting GRI.
Gas Regional Initiative – North West Region Investment workshop The Hague – 4 June 2010 Investment Project Regional Investment Plans Introduction to methodology.
Future role of GRI NW Stakeholder Group Meeting The Hague, 7 may 2010 Peter Plug Chairman of GRI NW.
EU Developments Transmission Workgroup 3rd November 2011.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Framework Guideline on gas capacity allocation Stefanie Neveling, Co-Chair CAM TF 20 th Madrid Forum, 27 September 2011.
Bente Danielsen, ERGEG Transparency Project Team leader Alain Taccoen, ENTSO-E WG Market Information and Transparency, convenor Florence Forum June 2010.
Introduction to the Capacity Allocation & Congestion Management Network Code 1 st Stakeholder Group Meeting Mark Copley ENTSO-E Market Advisor.
The role of ACER In the Regional Initiatives Steve Gordon Head Of the Gas Department North West Regional Initiatives 2011.
09/12/2011 NWE Stakeholders Group meeting-London Getting to 2014 A contribution from the Regional Initiatives Process Christophe Gence-Creux Head of the.
Florence Forum Third package December, The possibility given by the EC to all stakeholders to comment the ” Discussion paper on the Third Energy.
GRI-S : Infrastructures The Union list of projects of common interest European Commission DG Energy Internal Market I: Networks and Regional Initiatives.
Adeline Lassource (CRE) Charlotte Ramsay (OFGEM) 10 th FUI SG, London, 11 th March 2011 Progress with market integration: European initiatives and impact.
ACER’s view on the future role of the Gas Regional Initiative Dennis Hesseling Head of the Gas Department, ACER 11 th Stakeholders group meeting of GRI.
ERGEG Advice Comitology Guidelines on Fundamental Electricity Data Transparency Florence Forum 13 December 2010 Bente Danielsen.
Benoît Esnault (CRE) NW Region – governmental meeting 6 May 2010 Pilot framework guideline on capacity allocation mechanisms.
Draft Framework Guidelines on Capacity Allocation Mechanisms for the European Gas Transmission Network Benoît Esnault, CRE Presentation Workshop Ljubljana,
EU Developments. September Update  ACER Framework Guidelines on interoperability rules  Scoping paper still to be published  Rather than conduct a.
EU Developments Transmission Workgroup 6th October 2011.
SG MEETING GRI NW– 28 N OVEMBER 2013 Incentives and Cross-border Cost Allocation in the Energy Infrastructure Package Benoît Esnault (CRE) Chair of the.
GRI NW European Energy Work Plan 2011 – 2014 Programme Office RCC meeting, 15 September 2011.
Capacity Allocation & Congestion Management Network Codes Stakeholder Meeting 3 July 2012 Introduction & Overview \
Report on ACER Progress An exchange of views with the Committee on Industry, Energy and Research of the European Parliament Brussels, 11 July 2011.
The Capacity Allocation & Congestion Management Network Code An overview & status update Antonio Lopez-Nicolas Manager - Markets.
Network Codes Update GCRP #34- February 2013 EirGrid 21 st February 2013, Belfast.
Jose Braz, ERGEG Conference on Implementing the 3rd Package 11th December 2008 The Agency for the Cooperation of European Energy Regulators.
Mark van Stiphout – DG TREN – C2 Internal market for electricity and gas The role of TSOs in the third package EUROPEAN COMMISSION GIE conference 7 May.
1 South Gas Regional Initiative Work Plan Raúl Yunta Huete, South GRI Chairman 20 th Madrid Forum Madrid, 26 September 2011.
David Halldearn, ERGEG Conference on Implementing the 3 rd Package 11 th December 2008 Implementating the 3rd Package: An ERGEG Consultation paper.
Lord Mogg Chair of ERGEG Florence Forum June 2009 Implementation of the Third Energy Package.
Global Competitiveness in a Liberalised EU Energy Market Wim Groenendijk, Member of the Board Brussels, 22 November 2011 Gas infrastructure and Markets.
Asta Sihvonen-Punkka Director General of EMA Vice-Chair of ERGEG Baltic Electricity Mini-Forum 24 th of April, 2009 Riga The 3 rd Package – implied changes.
Tahir Kapetanovic ENM TF Co-Chair XIX Florence Forum, December 2010 Draft Pilot FG for Electricity Grid Connection.
Capacity allocation in natural gas transmission networks Framework Guideline (Pilot) Dr. Stefanie Neveling, ACER Workstream Co-Chair Walter Boltz, ACER.
Bucharest, 24 October 2008 Making the third package work in practice Wolfgang Urbantschitsch, E-Control.
EUROPEAN COMMISSION Heinrich Hick, DG TREN C 2 3rd IEM Package and relevance of GRI GRI NW stakeholder Conference, London, 14 November 2008.
Introduction FUI SG Conference – Dublin 16 June 2010 Martin Crouch Partner – European Strategy.
Walter Boltz & Asta Sihvonen-Punkka, ERGEG Conference on Implementing the 3 rd Package Brussels, 11 th December 2008 Implementing the 3 rd Package Framework.
Walter Boltz, Chairman ERGEG Gas Working Group 18 th Madrid Forum 28 September 2010 Pilot framework guideline on capacity allocation in natural gas transmission.
Framework Guideline on gas balancing Martin Crouch, Ofgem 20th Madrid Forum September 2011.
The EU’s Third Energy Package European Code Development UNC Transmission W/S - 4 th December 2008.
OCT Environmental Profiles DEVCO-TF OCT, September 2013.
Gas Regional Initiative North West Region - Draft Framework Guidelines Capacity Allocation Mechanisms BNetzA/CRE Pre-Comitology Meeting Bonn – 26 May 2011.
1FTS-CEER bilateral meeting, St Petersburg, 17 May 2011 Peter Plug Chairman of the electricity working group Use and management of interconnections – The.
Madrid Forum 6-7 November 2008 Implementating the 3rd Energy Package: An ERGEG Consultation paper Lord Mogg, ERGEG chairman.
European Developments Transmission Workgroup 1 st December 2011.
Michael Schmoeltzer Member of ERGEG Gas Working Group GIE Annual Conference, 6/7 May 2009, Groningen ACER & ENTSOG and their interaction.
European Developments Transmission Workgroup 3 rd May 2012.
09 May 2015 TAKE 1.5H TO UNDERSTAND AND SEE THE TYNDP 2016 PROJECTS ASSESSMENTS RESULTS Public webinar.
Walter Boltz, Chairman ERGEG Gas Working Group 18 th Madrid Forum 28/29 September 2010 Draft framework guideline on balancing in natural gas transmission.
FlorenceForum November 2008
GRI-S : Infrastructures The Union list of projects of common interest
EU Implementation Programme
Update on European Network Codes
ENTSO-E IT project for Fundamental Electricity Data Transparency
Steven Gordon ACER Gas Department
Incentives and Cross-border Cost Allocation in the Energy Infrastructure Package Benoît Esnault (CRE) Chair of the ACER Gas Infrastructure Task Force.
EUROPEAN TRANSPARENCY UPDATE
Review of Framework Guidelines Processes
EUnetHTA Assembly May 2018.
EU CAM Network Code and CMP Guideline Proposal Update
Presentation transcript:

Draft Framework Guidelines on System Operation - Process Presentation Workshop, Ljubljana, 24 August 2011 Uroš Gabrijel (ACER)

2 Content. Introduction. Process description. State of play. Details on public consultation. Next steps

3 Introduction (1). During the interim period, ERGEG assumed the role assigned to ACER by the 3rd package and worked on pilot Framework Guidelines (FG). ERGEG has been working on three FG: » Electricity Grid Connection » Capacity Allocation and Congestion Management » System Operation

4 Introduction (2). Work on drafting the FG on System Operation was concluded under ACER. ACER was invited to submit to the Commission, by 31 December 2011, a framework guideline on electricity system operation

5 Process description (1). General timeline as set out in Reg. (EC) 714/2009

6 Process description (2). Annual priority list Commission. Consultation with ACER, ENTSO-E, other relevant stakeholders. Areas for the development of FG/NC. Initial Impact assessment ACER. To support the development of the FG. Expert group representing wide industry perspective. Identification of problems / objectives / policy options

7 Process description (3). Framework Guidelines (FG) ACER. Invitation from the Commission to draft FG. Public consultation. Adoption of the FG / Submission to the Commission (6 months). Network Codes (NC) ENTSO-E. Commission request. ENTSO-E prepare the NC in line with the FG (12 months). ACER reasoned opinion on NC (3 months)

8 State of play. ACER deliverables on FG ( 2011 Work Programme ). Electricity Grid Connection (finished). Capacity Allocation and Congestion Management (finished). System Operation (on-going). Balancing (to be delivered in mid 2012)

9 Details on public consultation (1). Public consultation on Draft Framework Guidelines on System Operation » Run from 15 July to 15 September based consultation » Submission of comments to: » Personal details should be enclosed. Constructive and comprehensive responses » Large companies invited to coordinate their answers internally

10 Details on public consultation (2). Questionnaire to steer the structure of responses » 8 general issues, 4 specific issues. Transparency » Responses will be published on the ACER website » Comments marked confidential will be considered but not disclosed

11 Next steps. Public consultation » On-going » Ending on 15 September Evaluation of responses » Within approximately two months. Finalization of the FG » Submission to EC by 31 December 2011

12 Thank you for your attention