16 July 1999STEP for Aerospace Applications at NASA/GSFCsheet 1 ECSS Working Group “Exchange of Product Data” and related work Hans Peter de Koning (ESA/ESTEC/TOS-MCV)

Slides:



Advertisements
Similar presentations
ESWW4, 5-9 th November 2007 Draft Proposal: Space Weather as part of an Optional Space Situational Awareness Programme A.Glover, E. Daly, R. Marsden, A.
Advertisements

1 Development of Electronic Reporting Tools for IPPC Directive and WI Directive Workshop – Objective and next steps Tuesday 3 rd March 2009 Meeting room.
© University of Strathclyde Assessing Aesthetic Quality Martin Fitchie University of Strathclyde.
1 CES IASSIST 2002, June 2002 University of Connecticut MetaNet: Standardising Statistical Metadata Methodology Karen Brannen University of Edinburgh,
BGH M&E Working Group Updates Siân Curtis. Brief History: PRH M&E WG  2004 evaluation of OPRH M&E recommended establishing a CA M&E WG  OPRH M&E WG.
Developing a target ‘future state’ in social care informatics Andrew Fenton DH.
Eurostat J OINT UNECE/OECD/E UROSTAT MEETING OF THE GROUP OF EXPERTS ON BUSINESS REGISTERS 3-4 September 2013, Geneva Session 1: Economic globalisation.
CIM Users Group Intro and Benefits Ralph Mackiewicz Chair, Marketing Subcommittee UCA International Users Group October 2007 Austin, TX
System Design/Implementation and Support for Build 2 PDS Management Council Face-to-Face Mountain View, CA Nov 30 - Dec 1, 2011 Sean Hardman.
Rolls-Royce & Ministry of Defence Pilot for Early Implementation of PLCS Marine Olympus/Tyne Summary 3 Feb 04.
1 Proposed PLCS TC Organization and Functional Responsibilities Revision
Adaptive Processes © Adaptive ProcessesSimpler, Faster, Better Overview of ITIL Information Technology Infrastructure Library.
-Nikhil Bhatia 28 th October What is RUP? Central Elements of RUP Project Lifecycle Phases Six Engineering Disciplines Three Supporting Disciplines.
1 Data Exchange Mark E. Sampson EMIS 8340 Systems Engineering Tool—applying tools to engineering systems.
January 23, 2014 Kim Wiita. Activities Completed Task Group has met 3 times since the Summer 2013 meeting: August 26, 2013 October 8, 2013 November 11,
ETICS2 All Hands Meeting VEGA GmbH INFSOM-RI Uwe Mueller-Wilm Palermo, Oct ETICS Service Management Framework Business Objectives and “Best.
Usability Issues Documentation J. Apostolakis for Geant4 16 January 2009.
NIEM Domain Awareness June 2011 Establishing a Domain within NIEM.
1 Synchronize work on DEXs and reference data between PLCS pilots and OASIS/PLCS - Proposed PLCS TC Organization and Functional Responsibilities.
Page 1 ISO/IEC JTC 1/SC 7/WG 7 N Summary of the Alignment of System and Software Life Cycle Process Standards The material in this briefing.
EuroRoadS for JRC Workshop Lars Wikström, Triona Editor of EuroRoadS deliverables D6.3, D6.6, D6.7.
Developments concerning the Community Plant Variety Office of the European Union (CPVO) online application system Meeting on the development of a prototype.
ESA Report to CMC ESA / ESTEC, 5th November 2009 Mario Merri (deputising JFK / NPESA CCSDS Delegate)
What is NIEM? 1 NIEM is a national program supported by the federal government to increase information sharing between organizations who share a common.
CAM-I Scalable Flexible Manufacturing Initiative NGMS Task 6.1.
Espri Concept Page 1 European Space AgencyFrench Space Agency Overview of STEP Protocols for Space and Current Implementations ESA / NASA Meeting, NASA.
OOI CI LCA REVIEW August 2010 Ocean Observatories Initiative OOI Cyberinfrastructure Architecture Overview Michael Meisinger Life Cycle Architecture Review.
Expert Group 8 on Assessment of draft UNI standards on DSRC communications- Overview of the work and results Working for DG TREN in support of the.
ESA Report Jean-François Kaufeler 12 th April 2005 Athens.
1 ILE Project Integrated Logistics Environment Kickoff Meeting Task 2 Completion of the Ship Common Information Model Presented by: Dr. Burton Gischner.
Publish ISO Technical Corrigenda for ISO , and NSRP Systems Technology Panel Project Pete Lazo Product Data Services Corporation.
Paul van Exel, Director USPI Standards association Oil, Gas, Process & Power Industry Paul van Exel, Director USPI Standards association Oil, Gas, Process.
Joint Meeting Report on Standards 8 July Recent Accomplishments Systems Modeling Language (SysML) specification accepted for adoption by OMG AP233.
The ISO EXPRESS and Binary Data Project January 2005.
STEP-TAS and its Benefits to Thermal Engineering STEP for Aerospace Workshop January 18, 2001 Georg Siebes.
Information Architecture WG: Report of the Spring 2004 Meeting May 13, 2004 Dan Crichton, NASA/JPL.
1 CCSDS 2007 Fall Meeting SOIS Plenary Chris Taylor Estec (27/09/2007.
The State of STEP Stephen C. Waterbury NASA/GSFC NASA STEP for Aerospace Workshop January 17, 2001 NASA Jet Propulsion Laboratory Achievements and Challenges.
STEP Protocol Development and Converter Implementation Processes at ESA Hans Peter de Koning - ESA/ESTEC - The Netherlands
STEP for Multi-Disciplinary Model Management: “Intelligent PDM”
SEA-1 20 Nov 2014 CCSDS System Engineering Area (SEA): System Architecture WG (SAWG) Restart Peter Shames, SEA AD 20 Nov 2014.
1 ISO/PC 283/N 197 ISO Current status of development November 2015.
1 Margaret Christison Head of Product Data Standards Product Information Standards Defence Logistics 2004.
Overview of RUP Lunch and Learn. Overview of RUP © 2008 Cardinal Solutions Group 2 Welcome  Introductions  What is your experience with RUP  What is.
ESTEC TOS-MC Thermal and Structures Division SIMULOG January 2000 NASA's STEP for Aerospace Workshop at JPLSheet 1 STEP for Space Applications -
11 th NASA/ESA Workshop on Product Data Exchange 2009 Allison Barnard Feeney, NIST David Price, Eurostep.
Streamlining Verification MTAC Workgroup Mission Statement: –Collectively determine how the USPS and the Industry can leverage existing, or guide.
PS -0 System Architecture Working Group RASDS Status 14 June 2006 Peter Shames NASA / JPL
1 ILE Project Integrated Logistics Environment Kickoff Meeting NPDI Project & SCIM Summary & Status Presented by: Rick Lobsitz (NGTS)
Djc -1 Daniel J. Crichton NASA/JPL 9 May 2006 CCSDS Information Architecture Working Group.
Information Architecture BOF: Report of the Fall 2003 Meeting October 28, 2003 Dan Crichton, NASA/JPL.
1 Systems Architecture WG: Charter and Work Plan October 23, 2003 Takahiro Yamada, JAXA/ISAS.
INFSO-RI SA2 ETICS2 first Review Valerio Venturi INFN Bruxelles, 3 April 2009 Infrastructure Support.
1 Steve Hughes Daniel J. Crichton NASA/JPL January 16, 2007 CCSDS Information Architecture Working.
© 2007 Her Majesty the Queen in Right of Canada (Canadian Food Inspection Agency), all rights reserved. Use without permission is prohibited. Summary of.
Collaborating for Quality Quality Assurance (QA) & Quality Control (QC) in the Accelerator Project (ACCSYS) Matthew Conlon ACCSYS QA/QC
Viewpoint Modeling and Model-Based Media Generation for Systems Engineers Automatic View and Document Generation for Scalable Model- Based Engineering.
IoT: Manufacturing Factories of the Future Patrick Kennedy.
IPDA Architecture Project International Planetary Data Alliance IPDA Architecture Project Report.
Slide 1 PDT Europe 2014, October 2014, Paris 1 AeroSpace and Defence Industries Association of Europe Through Life Cycle Interoperability as developed.
ESA UNCLASSIFIED – Releasable to the Public Hans Peter de Koning European Space Agency European Space Research and Technology Centre (ESTEC) Noordwijk,
Baghera View A new generation of STEP based models viewer and synthesizer based on virtual reality and open source technologies PDE 2005 The 7th NASA-ESA.
ESA Status Report Jean-François Kaufeler Montreal, 24 May 2004.
International Planetary Data Alliance Registry Project Update September 16, 2011.
1 Transnational Partner Search Toolkit Transnationality Contact Points Meeting 30 September Warsaw.
Collaborating for Quality through the Project Quality Plan Matthew Conlon ESS ACCSYS QA/QC Quality Learning & Planning.
AFNeT Standardization Days Paris
Systems Architecture WG: Charter and Work Plan
European A&D industries roadmap for ISO STEP standards projects
Electrical wiring harness interoperability: functionalities of AP242 ed2; preparation of the STEP 'electrical' Implementer Forum By Sophie Hérail (CIMPA.
Presentation transcript:

16 July 1999STEP for Aerospace Applications at NASA/GSFCsheet 1 ECSS Working Group “Exchange of Product Data” and related work Hans Peter de Koning (ESA/ESTEC/TOS-MCV) European Space Research and Technology Centre Thermal Control and Life Support Division phone: +31 (71) ; fax: +31 (71) mail: P.O. Box 299, Noordwijk, The Netherlands (ECSS = European Co-operation for Space Standardisation)

16 July 1999STEP for Aerospace Applications at NASA/GSFCsheet 2 Why need a WG and standard “Exchange of Product Data” ? Efficient and effective electronic exchange of product data is considered a key enabler for faster/better/cheaper development of space products Long term, tool-independent archiving of product data is also needed in many space programmes European space community (industry and agencies) need a frame of reference in order to standardise on protocols for the communication of product data

16 July 1999STEP for Aerospace Applications at NASA/GSFCsheet 3 Brief background of the WG 1994: ESA started developing STEP-based data exchange standards (in co-operation with CNES) –At first focusing on thermal analysis model exchange 1994 to 1998: interest broadened across disciplines –Electronic product definition, concurrent engineering, etc. –Growing maturity of STEP / more capable CAx tools May-98: first informal meeting industry and agencies to assess need, support, Draft Terms of Reference for a WG Feb-99: Officially installed as ECSS WG E-10-07

16 July 1999STEP for Aerospace Applications at NASA/GSFCsheet 4 Tasks of the WG Review of existing international product data exchange standards and their suitability for use in space projects - focusing primarily on STEP Identification of areas for which adapting / developing space-specific STEP-based standards is cost- effective - recommendation and promotion of further actions Production of an ECSS standard for the exchange and archiving of product data in space projects –Including guidelines concerning the implementation / use of the standard

16 July 1999STEP for Aerospace Applications at NASA/GSFCsheet 5 Standardisation approach (1) ECSS E is part of E-10 “System Engineering” Addresses exchange via neutral standards (1) between different tools of one discipline (2) between tools of different disciplines Archiving is considered an application of (1)

16 July 1999STEP for Aerospace Applications at NASA/GSFCsheet 6 Standardisation approach (2) Targeted disciplines: –ECSS-M-40 - Configuration Management –ECSS-M-50 - Information / Documentation Management –ECSS-M-70 - Integrated Logistic Support –ECSS-Q-70 - Material, Mechanical Parts & Processes –ECSS-E-10 - System Engineering –ECSS-E-20 - Electrical & Electronics –ECSS-E-30 - Mechanical (including thermal) –ECSS-E-40 - Software Engineering (only on CI level) –ECSS-E-60 - Control Systems –ECSS-E-70 - Ground Systems & Operations

16 July 1999STEP for Aerospace Applications at NASA/GSFCsheet 7 Standardisation approach (3) E is an ‘umbrella’ standard –Specifies which standard to use for what PDE situation –Makes reference to existing international standards –Primary focus on ISO (STEP) –Adds guidelines / best practices on how to use the standard –Designed for tailoring by individual projects –Only file-based exchange in scope for first release

16 July 1999STEP for Aerospace Applications at NASA/GSFCsheet 8 Standardisation approach (4) Identified candidate STEP(-based) standards –AP 202: Associative draughting –AP 203: Configuration controlled design –AP 209: Composite and metallic structural analysis and related design –AP 210: Electronic assembly, interconnect and packaging design –AP 212: Electrotechnical design and installation –AP 214: Core data for automotive mechanical design processes –AP 232: Technical data packaging core information and exchange –AP 233: Systems engineering application protocol –STEP-TAS AP: Thermal Analysis for Space (ESA) –STEP-NRF AP: Network-model Results Format (ESA) –STEP-PRP AP: Propulsion Systems (CNES)

16 July 1999STEP for Aerospace Applications at NASA/GSFCsheet 9 Requirement for tailoring It is very unlikely that in practice such a standard can be applied as a whole to a project It shall be possible to use the standard as a contractual document in a programme or project by declaring a subset of applicable clauses to specify the data exchange protocols that shall be used between parties Requirement for tailoring is recognised across all ECSS standards

16 July 1999STEP for Aerospace Applications at NASA/GSFCsheet 10 ECSS E Initial core requirements specification A extensive list of structured 4-element requirements: –“To exchange data from a representation –to a representation –for the purpose of transferring –the standard shall be used.” For long term archiving the requirement as for exchange within one discipline shall be used –Identical and

16 July 1999STEP for Aerospace Applications at NASA/GSFCsheet 11 Example excerpt of initial requirements specification (1)

16 July 1999STEP for Aerospace Applications at NASA/GSFCsheet 12 Example excerpt of initial requirements specification (2)

16 July 1999STEP for Aerospace Applications at NASA/GSFCsheet 13 Status/schedule of WG 17 members (1/3 from agencies, 2/3 from industry) 3 working meetings held Terms of reference written and agreed First working draft produced –Currently in review and comment loop –Proofs difficult to actively involve industry in production of the standard (as always with long term benefits) Goal is first release of standard early 2000

16 July 1999STEP for Aerospace Applications at NASA/GSFCsheet 14 Related work Since 1994, 3 STEP-based APs have been developed by European space community –STEP-TAS “Thermal Analysis for Space” (ESA) –STEP-NRF “Network-model Results Format” (ESA) –STEP-PRP “Propulsion” (CNES) TAS and NRF developed as companion APs together with common Integrated Application Resources: –“Space Domain” –“Definition and Results of Analysis, Tests and Operations” –“Thermal Analysis”

16 July 1999STEP for Aerospace Applications at NASA/GSFCsheet 15 Status STEP-TAS & STEP-NRF Integrated Application Resources and APs available in fully compliant ISO TC 184/SC 4 format Full programming libraries available –With documentation (PDF, HTML) –C and FORTRAN APIs STEP-TAS CC1 converters implemented in –ESARAD 4.1 (released June 1999) –THERMICA (release of 1999-Q3) –Limited prototypes TRASYS and TSS (with NASA-JPL) STEP-NRF prototypes at Intespace and EdF

16 July 1999STEP for Aerospace Applications at NASA/GSFCsheet 16 Future work related to STEP at ESA Continued implementation of STEP-TAS Further development of STEP-NRF AP203 (CC1,4,5,6) import facility in ESARAD –Supports import of CAD product structure and shape –Will include support for NURBS in ESARAD model Idea for CAD-to-Analysis tool based on AP203

16 July 1999STEP for Aerospace Applications at NASA/GSFCsheet 17 Idea AP203-based CAD-to-Analysis tool –UNIX type pipe of filters –Open API –Online visualisation CAD AP203 CAx filter