“Stakeholder Day on the EU – Monitoring and reporting Guidelines”

Slides:



Advertisements
Similar presentations
Basic Principles of GMP
Advertisements

1 Welcome Safety Regulatory Function Handbook April 2006.
WTO, Trade and Environment Division
1 Session 9 – Government-to-government dispute settlement procedures WTO Dispute Settlement Understanding Vesile Kulaçoglu, WTO Secretariat Dar es Salaam,
Kari Grönfors Effects of ETS data and methodology on GHG inventory time series in Finland.
European Commission: DG Environment Monitoring, Reporting and Verification in the EU ETS: Status and Implementation Stakeholder Day on the EU MRG Cologne.
1 Stakeholder Day on the EU- Monitoring and Reporting Guidelines Cologne 12 May 2005 MRG European Lime Contribution Yves de Lespinay Alf Wikanderwww.eula.be.
1 EUROPEAN COMMISSION CLIMATE CHANGE UNIT Data consistency between National GHG inventories and reporting under the EU ETS Dr. Erasmia Kitou Climate Change,
1 European Commission, DGENV.D. 3 Strategic Environmental Assessment Directive 2001/42/EC on the assessment of the effects of certain plans and programmes.
Managing differencies in coverage, institutional and methodological issues (EU ETS vs GHG inventory) case of France Jean-Pierre FONTELLE Centre Interprofessionnel.
The Implementation Structure DG AGRI, October 2005
THE CERTIFYING AUTHORITY
Click to edit Master title style 1 Financial aspects of closure European Commission Felix LOZANO, DG Agriculture and Rural Development.
European Union Cohesion Policy
European Commission: DG Environment Closing Remarks: Key issues for follow-up from Stakeholder Day Stakeholder Day on the EU MRG Cologne 12 May 2005 Marco.
Regional Policy Delegated Act on the methodology for the quality review of major projects 1 Expert Group on Delegated and Implementing Acts for the ESI.
Management and control systems Franck Sébert, DG Regional and Urban Policy, Head of Unit C1 FOURTEENTH MEETING OF THE EXPERT GROUP ON.
IPCC methodologies and reporting principles Kristin Rypdal, CICERO & IPCC author.
European Commission Jacques McMillan Enterprise Directorate-General Legal aspects linked to internal market EUROPEAN CONFERENCE ON MARKET SURVEILLANCE.
European Commission: Environment Directorate General Slide: 1 ECCP Aviation Working Group Mandate and draft work programme Directorate C – Air and Chemicals.
1 DG TAXUD/C/213/05/2005 Future of Preferential Rules of Origin Commission Communication The Rules of Origin in Preferential Trade Arrangements Orientations.
European Union Cohesion Policy
Harmonized implementation of CDM Accreditation CDM-Accreditation Panel.
NATIONAL SYSTEMS UNDER ARTICLE 5 OF THE KYOTO PROTOCOL EC workshop on Quality Control and Quality Assurance of Greenhouse Gas Inventories and the Establishment.
EMS Checklist (ISO model)
Subsidy Contract Lead Partner seminar October 2008, Riga Arina Andreičika Managing Authority
European Commission Enterprise and Industry # European Standardisation: Proposal for a Regulation Presentation to IMCO – 5 October 2011 European Commission.
Clean Air Interstate Rule (CAIR) CAIR Requirements for SIPs Office of Air and Radiation March 2005.
EU Market Situation for Eggs and Poultry Management Committee 21 June 2012.
IPCC Good Practices Guidance and the electronic reporting of GHG inventory tables: useful tools for improving the quality of national GHG inventories of.
Checking & Corrective Action
Development and Prospects for JI UNFCCC Side Event November 30, 2005 Hiroshi YAMAGATA Ministry of Economy, Trade and Industry JAPAN.
EU FORMAL REGULATION – TYPES OF STANDARDS ENVIRONMENTAL QUALITY OBJECTIVES ENVIRONMENTAL QUALITY STANDARDS.
EU FORMAL REGULATION – TYPES of STANDARD MINIMUM EMISSION STANDARD (sometimes known as LIMIT VALUES) UNIFORM EMISSION STANDARD.
Presented to: Minnesota Chamber of Commerce October 1, 2012.
A tool to protect Minnesota's waters Minnesota Pollution Control Agency, Sept. 10, 2012.
1 Development of Electronic Reporting Tools for IPPC Directive and WI Directive Workshop – Objective and next steps Tuesday 3 rd March 2009 Meeting room.
European Commission, DG Energy Ewout Deurwaarder 29/06/2010 Biofuels in the EU Renewable Energy Directive - Update Energy crops advisory group EF/010/077.
1 Workshop on inventories of greenhouse gas emissions from aviation and navigation May 2004, Copenhagen EU greenhouse gas emission trends and projections.
Quality Auditing Dr Alan G Rowley
Winding-up Declaration and Audit Requirements at the Closure of INTERREG III programmes ( ) Directorate General Regional Policy Audit and.
©2003 Prentice Hall Business Publishing, Auditing and Assurance Services 9/e, Arens/Elder/Beasley Audit of the Capital Acquisition and Repayment.
1 Technical Meeting on Managing the Development of a National Infrastructure for Nuclear Power SECURITY STATUS IN CHILE Mauricio Lichtemberg Chilean Nuclear.
What Constitutes an Audit? Presenters: Diane Robichaud-Cormier, NB Terry Hing, ON Michele Snow, ON.
Main elements in a possible revision of the Energy Taxation Directive Informal meeting with stakeholders, 15 July 2009 European Commission, DG Taxation.
Session 5 :E-PRTR (EU-ETS) QUALITY CONTROL/QUALITY ASSESSMENT Iksan van der Putte.
EUROPEAN TOPIC CENTRE ON AIR AND CLIMATE CHANGE Overview of main reporting problem areas in energy balances/ energy related parts of GHG inventories Workshop.
EU MONITORING AND REPORTING GUIDELINES STAKEHOLDER DAY Cologne, 12th May 2005 UK APPROACH: PAST PRESENT AND FUTURE Dr Rob Gemmill Technical Adviser Monitoring.
1 INTERREG IIIB “ATLANTIC AREA” Main points of community regulation 438/2001 financial management and control systems EUROPEAN COMMISSION SPAIN.
Data interaction between the National Emission Inventory and EU ETS in Ireland Workshop on data consistency between National GHG inventories and Annual.
IPPC Directive state of play and future developements
Use of ETS data in GHG emission reporting Krzysztof Olendrzyński what „new” Emission Trading Scheme has brought to GHG emission inventories? data (in)consistency.
European Commission: DG Environment Streamlining and harmonizing climate change and air pollution requirements TFEIP, 23 – 24 May 2007, Dessau Eduard Dame.
Recommendation 2001/331/EC: Review and relation to sectoral inspection requirements Miroslav Angelov European Commission DG Environment, Unit A 1 Enforcement,
REVISION OF THE IPPC DIRECTIVE  DIRECTIVE ON INDUSTRIAL EMISSIONS.
12 May Cologne-CL 1 EU – ETS CO 2 Monitoring Stakeholders day MONITORING AND REPORTING GUIDELINES By Ir. Claude Loréa, CEMBUREAU Technical Director.
EU-MRG Stakeholder Day Experience in Monitoring & Reporting in the EU-ETS: Stakeholder Consultation May 12, 2005 Sina Wartmann, Ecofys
The current legal situation
L Click to edit Master text styles l Second level l Third level l Fourth level l Fifth level Combustion Installations Stakeholder Day on the EU-Monitoring.
June 2009 Regulation on pesticide statistics Pierre NADIN ESTAT E1- Farms, agro-environment and rural development
Main flexibility tools for the adoption of high emission standards for LCPs set in the new Industrial Emissions Directive Gerard Lipinski Coordinator of.
0 Allocation in phase 3 of EU ETS Case study: integrated steel mill.
Business environment in the EU Prepared by Dr. Endre Domonkos (PhD)
EU – ETS CO2 Monitoring Stakeholders day
2005 MRG stakeholder day Concerns and proposals of the downstream oil industry J-F. Larivé, CONCAWE.
EU-MRG Stakeholder Day
Агенција за трговину емисионим јединицама СР Немачке
Expert Advisory Forum on priority substances
Reduction of total releases from unintentional production of POPs
Philippe QUEVAUVILLER
Presentation transcript:

“Stakeholder Day on the EU – Monitoring and reporting Guidelines” Technical Session II : steel works, coke ovens, sintering plants and power plants Jean-Pierre Debruxelles Technical Director EUROFER Cologne, 12 May 2005

Technical Session II : steel works, coke ovens, sintering plants and power plants Presentation Introductory remarks Process related emissions and export gases The integrated route (BF-BOF) The electrical route (EAF) Transversal aspects (accuracy, flexibility, cost-effectiveness, uncertainties, tier thresholds) Conclusions and recommendations

Technical Session II : steel works, coke ovens, sintering plants and power plants I. Introductory remarks Questions about the ongoing procedure leading to the revision of those guidelines (time line) Consistency with other legal texts (ET directive and NAP guidance)

Commission + Consortium revising the MRG (ann I.1) Technical Session II : steel works, coke ovens, sintering plants and power plants I. a) Time line Commission + Consortium revising the MRG (ann I.1) 13.10.2003 and 25.10.2003 January 2004 Dec 2006 June 05 March 2006 June 2006 Verification 2005 Adoption of the ET Directive + OJ Adoption of The MRG The NAP Guidance Report from MSs = f(MRG) – art.21 Proposal for an amending Directive (art.30)+ 2nd NAPs Deadline for revised MRG Art 24 : opt in for new gases = f(MRG) –> request from a MS or CEC initiative to adapt the MRG Art 5/6 : Permit = f(MRG)

Technical Session II : steel works, coke ovens, sintering plants and power plants I. a) Time line The Commission will review (the MRG) by 31 December 2006, taking into account experiences with the application of the Annexes and any revisions to Directive 2003/87/EC, with a view to any revised Annexes taking effect from 1 January 2008. “A competent authority may require the operator to change its monitoring methodology for the next reporting period if the reporting installation’s monitoring methodologies are no longer in conformity with the rules laid down in these guidelines. A competent authority may also require the operator to change its monitoring methodology for the next reporting period if the monitoring methodology under the permit has been updated in accordance with a review to be undertaken before each period referred to in Article 11(2) of the Directive.”

Technical Session II : steel works, coke ovens, sintering plants and power plants I. a) Time line : questions for clarification The second NAP will be submitted by MSs to the Commission on 30 June 06 to cover the period 08-12: what about the “measures planned to monitor and report emissions in accordance with the MRG” in the installations permit (only the existing MRG is binding at the moment)? What will happen for installations covered by a valid permit (art 5 and 6) after 1.1.08? An intermediary revision whereas the reporting period is already ongoing? What about the opt-in for new GHG ? Will the revised MRG include provisions for those GHG? Only after 2012 ?

Technical Session II : steel works, coke ovens, sintering plants and power plants I. b) Consistency with other legal texts: The Communication (COM(2003) 830) on NAP guidance implementation of the criteria listed in Annex III to ET Directive) was adopted on 7 January 2004. The MRG adopted three weeks later (29 January 2004) could not take this NAP guidance into account properly in particular as far as integrated steel plants are concerned. The revision offers the possibility to correct this situation!

Technical Session II : steel works, coke ovens, sintering plants and power plants II. Process related emissions and export gases (1/3) Nothing prohibits in the ET Directive a Member State to allocate allowances to the operator of the installation transferring the waste gas. The NAP guidance has stated: “Where a waste gas from a production process is used as a fuel by another operator, the distribution of allowances between the two installations is a matter for Member States to decide. … a Member State may choose to allocate allowances to the operator of the installation transferring the waste gas…”

Technical Session II : steel works, coke ovens, sintering plants and power plants II. Process related emissions and export gases (2/3) Our proposals: Chapter 4.1.: Boundaries (page 8), 1°) All emissions from an installation shall be assigned to that installation, regardless of exports of heat or electricity or exports of waste gases (in the meaning of item 92 of COM (2003) 830) to other installations. Emissions associated with the production of heat or electricity or emissions associated with the combustion of waste gas imported from other installations shall be assigned either to the importing or to the transferring installation depending on the allocation method of the corresponding allowances

Technical Session II : steel works, coke ovens, sintering plants and power plants II. Process related emissions and export gases (3/3) Our proposals: Chapter 4.2.2.1.2.: “Transferred CO2” (p. 11) 2°) “CO2 being transferred to an installation as part of a mixed fuel (such as blast furnace gas or coke oven gas) shall be included in the emission factor for that fuel. Thereby, the emissions corresponding to the transferred fuel/gas will be monitored and reported by the operator of the installation who will be allocated the corresponding allowances according to the method of allocation chosen by the Member State (Cf. item 92 of COM (2003) 830).”

Technical Session II : steel works, coke ovens, sintering plants and power plants III. The integrated route (1/3) Our proposals: Mass balance approach and “bubble concept” a) It should be clarified that, for the sake of a sufficient accuracy the carbon mass balance approach extends across single activities. b) The “bubble concept” should apply to an integrated steel plant c) There must be a possibility to aggregate the different activities : coke oven, metal ore roasting and sintering installations, production of pig iron and steel power plant processing the process-related gases

Technical Session II : steel works, coke ovens, sintering plants and power plants III. The integrated route (2/3) Accuracy: Not possible to reach a satisfactory accuracy on the basis of the measurement of the particular material flow of every single activity. We suggest the following methodology: Apply the mass balance approach (already mentioned in the MRG) to all activities which will be summed up in an aggregated system (bubble concept). Irrespective of the ownership of the power plant this one has to be integrated into this aggregated system to ensure the highest accuracy.

Technical Session II : steel works, coke ovens, sintering plants and power plants III. The integrated route (3/3) Calculations: For the calculation of the emissions of the aggregated system the interactions of the different installations within the system are not taken into account. The only issue is to monitor the inputs and outputs of the aggregated system. The equation for the mass balance approach remains the same, only taking into account modified boundaries: CO2-emissions [t CO2] = (∑ (activity data input * carbon content input) – ∑ (activity data products * carbon content products) – ∑ (activity data export * carbon content export) – ∑ (activity data stock changes * carbon content stock changes)) * 3,664

Technical Session II : steel works, coke ovens, sintering plants and power plants IV. The electrical route (1/3) Simplification and clarification are needed to ensure a system much more coherent, straightforward and accurate. The current MRG would imply identified specific emission factors for each carbonaceous material which produces process related emissions in the EAF furnace (foaming graphite, anthracite, coke, electrode of graphite) plus combustion processes from natural gas. This evaluation will imply a high uncertainty itself.

Technical Session II : steel works, coke ovens, sintering plants and power plants IV. The electrical route (2/3) Proposals: 1°) Consider process related emissions as if they were combustion emissions (smelting occurring at almost 3000 ºC, materials used in the processs oxide themselves as in a real combustion. 2°) Assumptions for each carbonaceous flows (Natural Gas, pig iron and HBI/DRI, solid coals, electrodes - made of pure C) 3°) Emission factors are those included in the National Inventory, as a national average, independently whether they are associated to combustion or to process.

Technical Session II : steel works, coke ovens, sintering plants and power plants IV. The electrical route (3/3) Proposals: 4°) Necessary simplification regarding the Carbon mass balance calculation : C contained in scrap, ferroalloys and final recarburants = C contained in steel + small amounts retained in dusts and slag.   5º) No emissions associated to the recarburants finals additions 6°) No emissions associated to decarbonation of the very small fraction of the non-yet decarbonated part (de minimis rule) 7°) Applying the “bubble concept”.

Technical Session II : steel works, coke ovens, sintering plants and power plants V. Transversal aspects (accuracy, flexibility, cost-effectiveness, uncertainties, tier thresholds) Annex I - section 10 – ISO 17025: Accuracy is prejudiced by the requirements : in particular tier 3 requirement for net calorific value and emission factors to be measured in a laboratory that is ISO17025 accredited! Internal flows: internal measurements of input/output materials and arising process gases/fuels are performed to a high degree of accuracy and at a sufficiently high frequency to fulfil critical process control and quality monitoring functions. A more flexible approach would be to allow industry, where appropriate, to use internally generated information, subject to inspection by the competent authority. This would improve accuracy whilst avoiding the cost burden of accreditation.

Technical Session II : steel works, coke ovens, sintering plants and power plants V. Transversal aspects (accuracy, flexibility, cost-effectiveness, uncertainties, tier thresholds) Annex I - section 10 – ISO 17025: b) External flows: The majority of our international suppliers of coal and alloying additions cannot affirm that the analyses of their deliveries have been performed by an accredited laboratory. This means that the MRG requirements cannot be met. The steel companies should not be forced to commission an accredited laboratory to analyse control samples, for the reason that the efforts would be disproportionate because the alloying additions account only for very small fractions of CO2 (about 2 %).

Technical Session II : steel works, coke ovens, sintering plants and power plants V. Transversal aspects (accuracy, flexibility, cost-effectiveness, uncertainties, tier thresholds) Annex I - section 10 – Standards: Where no applicable standards exist, procedures can be carried out where possible in accordance with draft standards or industry best practice guidelines. If certain materials are purchased by suppliers from abroad and it is not possible to assess the use of standards for calculating the carbon content the information of the supplier are considered as sufficient as it is used for the invoice and company accountability.

Technical Session II : steel works, coke ovens, sintering plants and power plants V. Transversal aspects (accuracy, flexibility, cost-effectiveness, uncertainties, tier thresholds) Cost-effectiveness – de minimis rule - uncertainties: The cost of monitoring small emissions will be excessive. MRG should adapt the necessary flexibility (below a certain threshold). There should be a more detailed definition of “batch” including the necessary threshold when large amount of materials are procured in small batches (road trucks). The tier approach emphasises the accuracy of batch measurements without considering the combination of uncertainties with the size and number of batches (it treats 150000 tonnes coal procurement by ocean vessel like several thousands 20 tonnes trucks batches).

Some data for a characteristic integrated facility (9 Mt CO2/year) Material Total use (Total C) Procurement method Measurement Size of batch Number of batches Coking coal 2.10 Mt (1.70 Mt) Boat Tonnage measurement 30-120 kt 25 BF coal 0.80 Mt (0.65 Mt) 10 Anthracite 0.18 Mt (0.15 Mt) 30-50 kt 5 Iron ores 7.50 Mt (2.0 kt) 150-200 kt 40 Natural gas 1300 TJ (20 kt) Pipe Flow meter Continuous Limestone 0.80 Mt (0.10 Mt) Trucks Road scale 25 t 32000

Technical Session II : steel works, coke ovens, sintering plants and power plants V. Transversal aspects (accuracy, flexibility, cost-effectiveness, uncertainties, tier thresholds) Net Calorific Values: In the context of the mass balance approach, there is no need to report the Net Calorific Values (NCV). NCV measurement is expansive and poorly accurate while carbon analysis is easy. Easier to compute 3.664 * Activity data * Carbon content than 3.664 * Activity data * NCV *(Carbon content/NCV)

Technical Session II : steel works, coke ovens, sintering plants and power plants VI. Conclusions and recommendations 1. Our proposals are aiming at a lower uncertainty and better accuracy without entailing excessive and unjustifiable administrative and analytical burdens.  2. It should be very explicit in the MRG that national competent authorities have discretion to apply pragmatic requirements so long as the underlying principles of completeness, consistency, transparency etc. are satisfied (case of emissions factors). 3. A new evaluation of the MRG is desirable after the verification process will have take place (March 06).