The Group Coding Officer Role Goran Perinić. Presentation to the QAC and GCO meeting.

Slides:



Advertisements
Similar presentations
Software Quality Assurance Plan
Advertisements

URUGUAY’s efforts to address synergies among the Conventions Workshop on synergies and cooperation with other conventions 2-4 July 2003 Espoo, Finland.
Working Together for Healthier Communities: A Framework for Collaboration among Community Partnerships, Support Organizations, and Funders.
More CMM Part Two : Details.
NATIONAL TREASURY TECHNICAL ASSISTANCE UNIT (TAU) Enabling Change for Development Programme and Project Management (PPM) Update Project Management Interest.
11 th International Symposium Loss Prevention and Process Safety Promotion in the Process Industries 1 OECD Workshop on Sharing Experience in the Training.
An Introduction to the Hennepin County Hennepin County GIS Technical Advisory Group (eGTAG) 10/20/2009.
Disability Access and Inclusion Planning Agents and Contractors DAIP Progress Reporting.
 QUALITY ASSURANCE:  QA is defined as a procedure or set of procedures intended to ensure that a product or service under development (before work is.
Continuing Competence in Nursing
European Organization for Nuclear Research PLC services Jerónimo Ortolá, Jacky Brahy EN-ICE Workshop 23 April 2009.
Software Configuration Management
Configuration Management Avoiding Costly Confusion mostly stolen from Chapter 27 of Pressman.
Safety & Safety Documentation 2 3 Safety in three Questions Why ? Providing a safe workplace is a legal and moral obligation on every undertaking, and.
MFI Office Maintenance Management Project Presentation 30th of May
HL-LHC Standards and Best Practices Workshop (11-13 June 2014)
SQA Work Procedures.
1 Procurement Quality Assurance Use quality as the framework for process/continual improvement Use quality as the framework for process/continual improvement.
Peter Defranceschi ICLEI - Local Governments for Sustainability An Introduction European Commission GPP Training Toolkit.
Software Quality Assurance (SQA) Monitor the methods and standards used during the software development and verify their correct usage. What is Quality?
CHAPTER 5 Infrastructure Components PART I. 2 ESGD5125 SEM II 2009/2010 Dr. Samy Abu Naser 2 Learning Objectives: To discuss: The need for SQA procedures.
Chapter 4 Interpreting the CMM. Group (3) Fahmi Alkhalifi Pam Page Pardha Mugunda.
Software Reuse Course: # The Johns-Hopkins University Montgomery County Campus Fall 2004 Session 6 Lecture # 5 – October 12, 2004.
School and LEA Users
CHEP2000 February 2000 Impact of Software Review and Inspection Doris Burckhart CERN ATLAS DAQ/EF-1 Back-end software.
SENG521 (Fall SENG 521 Software Reliability & Testing Software Product & process Improvement using ISO (Part 3d) Department.
Workshop on Programming in support of Anti-Corruption Agencies Bratislava, 30 June - 1 July 2009 A methodology for capacity assessment of AC agencies:
Towards a European network for digital preservation Ideas for a proposal Mariella Guercio, University of Urbino.
CERN Accelerators Topology Configuration and Change Management Engineering Department Thomas Birtwistle, Samy Chemli – EN/MEF/DC.
HL-LHC Project Kick-off Meeting Friday 15 th April 2011 Sylvain Weisz DG-DI-DAT on the behalf of the A&T Sector Projects Support Office.
1 Seminar on 2008 SNA Implementation June 2010, Saint John’s, Antigua and Barbuda GULAB SINGH UN Statistics Division Diagnostic Framework: National.
Avoid Disputes, Not Complaints Presented by: Stuart Ayres and Derek Pullen Stuart Ayres, Scheme Manager Derek Pullen, Scheme Adjudicator.
Evaluation Plan New Jobs “How to Get New Jobs? Innovative Guidance and Counselling 2 nd Meeting Liverpool | 3 – 4 February L Research Institute Roula.
CERN Equipment Management Integrates Safety Aspects EDMS Doc Eva Sanchez-Corral Mena, Stephan Petit / CERN 1 CERN Equipment Management Integrates.
CLIC Project breakdown structure: organization, documentation and cost estimate Beam Instrumentation Workshop, June 2-3, 2009 CLIC Project breakdown structure:
Engineering Department ENEN What is changing in EN 1. Streamlining and boosting remote handling and manipulation activities 2. Bringing small works closer.
©Ian Sommerville 2006Software Engineering, 8th edition. Chapter 1 Slide 1 Professional and ethical responsibility l Software engineering involves wider.
1 EARLY SAFETY MANAGEMENT OF PROJECTS AND EXPERIMENTS HSE UNIT PH DSO EDMS No
RSSO refresher meeting J. Pedersen M. Tavlet, T. Otto.
ANKITHA CHOWDARY GARAPATI
Samy Chemli – Configuration Management - S. Chemli EN-MEF – Contents Configuration Management Hardware Baseline Change Management.
OHT 15.1 Galin, SQA from theory to implementation © Pearson Education Limited 2004 Templates The contribution of templates to software quality The organizational.
MTF – Manufacturing and Test Folder Large Scale Deployment of MTF Sonia Mallón Amérigo Elena Manola-Poggioli on behalf of the EDMS Team, TS-CSE.
Supporting policy development in the field of ICH in Africa CONCLUSIONS Constantine — ALGERIA 28 September to 2 October 2015.
CATHI Final Review Meeting, September 2014E.Zografos1 * The research project has been supported by a Marie Curie Early Initial Training Network Fellowship.
LIU-PSB Configuration Management EDMS Documentation, Layout and ECRs Thomas Birtwistle EN-MEF-DC.
Project Management and Quality Assurance Support Pierre Bonnal on the behalf of the members of the newly created EN-MEF-QOP section.
Review of the processes released in the framework of the MMP Goran Perinić.
BUS OPERATOR WORKSTATION PROCUREMENT TEAM TRAINING T O ENHANCE BUS OPERATOR ERGONOMICS, HEALTH, AND SAFETY A TRAINING TEMPLATE FOR TRANSIT AGENCIES [ADD.
Product Lifecycle Management with the CERN EDMS David Widegren CERN, TS/CSE 8 Nov 2005EDMS:
Many entry points to improve reliability! Research, Prototyping, Development QA & Testing Manufacturing & Installation Commiss- ioning Operation Technical.
C. Mugnier, D. Lafarge, C. Perolini, R. Pilon, J. Ruiz-Cabezas
LIU Configuration Management EDMS Documentation, Layout and ECRs This presentation follows the LIU-PSB specific presentation done on 9 th October 2014.
Cryogenic safety organisation at CERN
Supporting quality devices
Development Planning Tool: 70:20:10 Model
Code of Practice for Statistics Edition 2.0
Quality Assurance applied to Accelerator Safety
News from QAC and Central Services
Implementation Plan for the Higher Education Sector
Welcome to Cyber Recruiter – Maximizing Requisitions
GPP Training Toolkit An Introduction European Commission
CORA ESSNet COmmon Reference Architecture starting ...
Chapter # 5 Supporting Quality Devices
Welcome to Cyber Recruiter – Administration Training
Welcome to Cyber Recruiter – Creating & Posting Requisitions
Welcome to Cyber Recruiter – Utilizing Standard Reports
Welcome to Cyber Recruiter – Administration Training
Welcome to Cyber Recruiter – Evaluating Applicants
Live Database (LDB) Project Approach The Project Approach.
Presentation transcript:

The Group Coding Officer Role Goran Perinić

Presentation to the QAC and GCO meeting

GCO resumé other roles will follow Role description sheet - Template - / /0.1 Role description sheet - Guideline - / /0.3 Group coding officer - Role description sheet - / /0.1 formal basis making it easily available TAB «Roles»

Human resources Information Financial resources Physical assets Stocks Products Activities: -innovate -manage -produce Activities: -innovate -manage -produce The context of roles

Activities..or.. The importance to work together Activities: -innovate -manage -produce Activities: -innovate -manage -produce Maintenance Integration Procurement Operation Product Lifecycle/AM Safety Configuration Prog rams/Projects Documentation Design Risk/Crisis Issues R o l e s ProcessesStandards, Conventions Quality Assurance Framework for the A&T sector

Role versus function con- text functionroleprocess sportfootball player for FC Bayern München goal keeperfootball match CERN MEF-INT section leadersupervisorappraisal engineer in EL-HTproject engineerproject management project leaderproject management technical coordinatorproject management technical officerprocurement procurement officerprocurement TSOsafety management GCOnaming

Why a Group Coding Officer Role? Need has been formulated by: Maintenance Management Project Naming service Layout service 7

The GCO responsibilities Act as an interface between the equipment responsible persons and the naming service for naming matters; Promote the usage of naming conventions within his/her area of responsibility; Organise codification within his/her area of responsibility in coordination with the naming service; Propose new codes to the naming service or assist colleagues in proposing new codes that ensure a coherent codification within the equipment group and that are in line with the CERN rules; Assist the naming service in the application of existing naming conventions; Document implementation conventions for his/her area of responsibility; Identify incorrect or erroneous usage of codes; Identify training needs in respect of coding matters within his/her group; Propose coding process improvements where applicable. 8 Group Coding Officer collect needs organize coding, promote use of naming conventions equipment group or section interface with, feedback, continuous improvement obtain codes configuration management and naming service

The GCO skills Advanced understanding of the equipment and technology in his/her area of responsibility and a solid understanding of the coding process and coding tools and the areas of application of the codes. 9

The GCO community Current list of GCOs:  Roles  Group Coding Officershttp://cern.ch/quality It is proposed to reunite the GCOs ~3 times per year to: -inform about processes, tools, standards, philosophies -share current issues -share best practices -next meetings ~ May 2015 then October please send suggestions for topics  Tom Birtwistle

QMF documents EDMS Guideline Template – Role description sheet -GCO