Final Meeting Meeting Ravenna 27.03.08 Lessons learned from the PALOMBINA PILOT PROJECT.

Slides:



Advertisements
Similar presentations
Emilia-Romagna Region (PP6) Project Progress Katia Raffaelli, Luisa Perini, Maria Romani Adriatic Sea regional meeting Kotor, 27th March 2007.
Advertisements

GPS & GIS – An Introduction. Where Will This Take Us? What is GPS? What is GIS? How do GPS and GIS work? How will they help us? ? Find This!
13th Poverty and Environment Partnership Meeting Group 4: Urban Environmental Management and Quality of Life for the Poor.
$100 $400 $300$200$400 $200$100$100$400 $200$200$500 $500$300 $200$500 $100$300$100$300 $500$300$400$400$500.
Grade Homework 17.
The City of Göteborg Traffic and Public Transport Authority ECOMM San Sebastian 2009 NO.2 Employers Photographer: Klas Eriksson.
Adriatic Forum ICZM Expert Group Ancona (I) July , Palombina beach Palombina beach The scientific approach Antonio Pusceddu.
Final Meeting Meeting Ravenna – Valentina Dumitru - URBANPROIECT Lessons learned from the CONSTANTA AREA Pilot Project.
Maria Romani Final Meeting Meeting Ravenna 27 March 2008 Lessons learned from the Emilia-Romagna Pilot Project (WP4): PROPOSAL OF SPATIAL PLAN ACCORDING.
Final Meeting Ravenna Spatial Planning in Coastal Zone and Maritime Areas Vjosa – Narta pilot project ECAT Tirana.
Rehabilitation of the Odessa beaches as a basic for increasing the recreational potential of the Odessa agglomeration. A draft proposal for a sea-use-plan.
Conference on Marine Spatial Planning – Supetar, Croatia, September 2007 This project is co-funded by the European Union Conference on Marine Spatial.
2008 NAIP Orthoimagery Update Chris Cialek MN Land Management Information Center May 7, 2008.
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200.
Category Category Category Category Category.
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
University of Nevada, Reno Router-level Internet Topology Mapping CS790 Presentation Modified from Dr. Gunes slides by Talha OZ.
The Corporate Social Responsibility Market Access Partnerships Project (CSR-MAP) By: Thai Ecotourism and Adventure Travel Association (TEATA) and Partners.
Summer Internship Program Outline
Update on the Port of Long Beach Doug Thiessen, P.E. ACEC LA
New England Developments in Demand Response and Smart Grid 2010 National Town Meeting on Demand Response and Smart Grid Henry Yoshimura, Director, Demand.
Community Engagement Future-Ready Community Partnerships.
Measuring your impact vs. activity
Participation in re-allotment Marije Louwsma. 2 Cadastre, Land Registry and Mapping Agency Cables and pipelines and re-allotment.
1 Ocean View Shoreline Project Update Overview for Norfolk City Council January 7, 2014.
Topic 19 Shoreline Engineering
Civil Works Baltimore District River and Harbor Projects.
DREDGING YOUR DOCKS 2014 Organized By CRA Hydrographic Surveyors Orion Marine Group.
Depositional coastal features
The situation in Norway concerning sediments/dredging Tore Lundestad, Port of Borg, Norway.
1.Define zoning. 2.Define building codes. 3.List the key players in implementing CPTED. 4.List the two thresholds of review for new construction or redevelopment.
Trapec S.A. 1 Bucharest Multi Sector – Public Private Partnership Municipality of Bucharest – February 2006 PPP Recommendation Report – Bucharest District.
Quantifying Disaster Risk and optimizing investment Sujit Mohanty UNISDR – Asia Pacific Protecting development gains: A path towards resilience.
Profile, role and activities of the CIHEAM - Mediterranean Agronomic Institute of Bari BIG project Roberta Trevisi
The Case Studies on Port-City Relationships Ancona, June 2005 Ecoports Project – Work package 5.4.
1 Local partnerships for the implementation of an hydro power plant on an irrigation canal, in Méailles city June 2014 – Cyprus meeting Scope Pilot case.
William B. Killingsworth Director, Division of Community Development
NOAA Restoration Center Implementing the Gulf Regional Sediment Management Master Plan …responding to an ongoing emergency, improving responses to new.
The Role of the Design Engineer in Technology Development 3/21/13 Auburn University Robert Kline.
Evaluating Impact Government Communication Service Cabinet Office.
Phare 2003 Sector: Economic and Social Cohesion Title: Water Supply and sewerage in tourism and resort settlements.
The SSMP Process 1. The Servicing and Settlement Master Plan A plan to encompass the community’s visions and ideas, while approaching planning and servicing.
STRATEGIC ENVIRONMENTAL ASSESSMENT METHODOLOGY AND TECHNIQUES.
Brownfields: Real Property, the expansion or redevelopment, or reuse of which may be complicated by the presence or potential presence of contamination.
Scale Drawings and Models
Characteristics of Waves
Map of Gulf Coast Network Parks Gulf Coast Network –submerged area in authorized boundary Gulf Islands NS, 437 km 2 (Tier 1 showed 461 km 2 ) Padre Island.
The Geographic Perspective A smarter way to see the world.
Harbors Module NH3: Formulation – Measures, Strategies and Plans.
Activity 33: Earth Processes and Boomtown’s Coast
What is Human Geography?
A frog hopped 2.25 meters. Where would this be located on the number line below?
MINNESOTA’S CHANGING FOOD SYSTEM The food system is an interconnected set of biological, technological, economic, and social activities and processes that.
The case of Ancona Piero Remitti, City of Ancona Thessaloniki, Greece 22 September 2005.
How regions can help build a sustainable Europe. Aim of GRDP Develop a common European methodology for integrating the environment into regional development.
Session E2: Mandating GREEN - A Regulatory Scheme for Realizing Institutional Sustainability.
Assessment of the state of coasts in Europe – EEA activities and needs Andrus Meiner, European Environment Agency European Conference on Coastal Zone Research:
1.2 Linear Equations and Rational Equations. Terms Involving Equations 3x - 1 = 2 An equation consists of two algebraic expressions joined by an equal.
Holderness in East Yorkshire is the fastest eroding coast in Europe (c.1m/yr average, but 10m + in some places). Traditionally, management strategies have.
March 8, 2016 Presentation of Item CCW – Solid Waste Management Infrastructure Projects – Final Siting Report.
ENVIRONMENTAL ACTION: BUYING GREEN!!!!. FACTS AND DATA!!
ADRIATIC MARITIME LAW CONFERENCE
Lesson 6: Coastal Management
Class The Oceans BEACH PROCESSES
Exploring Real Numbers
= Divide each measure by the GCF, 3. drawing length actual length
Lessons learned Working closely with domain experts and doing pilot studies is important to discover issues Social network interventions: difficulties.
An beach investigation
Technical proposal Challenges and Opportunities of Private real-state development in Mekelle.
Southern Maine Dredge Feasibility Study:
Presentation transcript:

Final Meeting Meeting Ravenna Lessons learned from the PALOMBINA PILOT PROJECT

Final Meeting Meeting Ravenna Basic Facts about the pilot project Palombina Pilot Project Palombina beach, Ancona Municipality of Ancona and Adriatic ICZM Expert Group Realization planned for 2009

Final Meeting Meeting Ravenna Today ANCONA RAILWAY

Final Meeting Meeting Ravenna Today

Final Meeting Meeting Ravenna Today

Final Meeting Meeting Ravenna Image of Palombina beach RAILWAYCYCLISTIC PATHSHORE LINE

Final Meeting Meeting Ravenna Results attended

Final Meeting Meeting Ravenna Results attended

Final Meeting Meeting Ravenna How WORK HARBOUR SITE around m3 of sand To dredge Distance from dredged site to the nourishment, 6 miles to go NOURISHMENT SITE (6 miles to come back)

Final Meeting Meeting Ravenna Technical information The sand dredged in Ancona harbor is an option for the beach nourishment of Palombina The quantity of sand for linear meter of coast: 200 m3 for a meter of beach The working technique is a refluent dredge off the breakwater defense The additional cost for harbor work consisting in pushing longshore the sand stocked on the seaside is equal to ,00.

Final Meeting Meeting Ravenna Cyclistic path from tourist port of Ancona

Final Meeting Meeting Ravenna Activities completed Meetings with experts Spatial data collection Feasibility study Partnership between public and private organizations Working maps produced

Final Meeting Meeting Ravenna Follow up activities planned 1.Planning barriers and/or relocation for the railway 2.Planning a possible tourist revaluation of Palombina beach, redevelopment of existing structures and construction of new ones 3.Creating of green areas

Final Meeting Meeting Ravenna Implementation Palombina is a complex sandy landscape divided between two municipalities, with a strong private activity. At the higher level we needed to achieve a public & private network for the whole area. Is it realistic? Yes, absolutely. Why? All the actions are planned considering the environmental, social and economic impact. The keywords are simplicity and rationality.

Final Meeting Meeting Ravenna Lessons learned 1.It was successful because the proposed plan satisfies actual needs of the beach 2.The hardest part of the work was a creating working network 3.That surprised us the most was the interest and commitment for the realization of the plan 4.We are particularly proud of the real feasibility of all the project