\ Bayhealth Medical Center Expansion Dover, Delaware Introduction Penn State AE Senior Capstone Project Christopher Barron Construction Management CM Advisor.

Slides:



Advertisements
Similar presentations
| Michael Gallagher | Construction Management AE Faculty Consultant: Dr. Riley The Pennsylvania State University AE Senior Thesis Project.
Advertisements

A Medical Office Building For The Primary Health Network Daniel Goff I Structural Option Dr. Thomas Boothby l Faculty Advisor Sharon, Pennsylvania Source:
Penn State Hershey Medical Center Children’s Hospital Hershey, Pennsylvania Matthew Vandersall Structural Option AE Senior Thesis Dr. Richard Behr.
C AMPUS S QUARE H ARRISBURG, P ENNSYLVANIA A NDREW M ARTIN | C ONSTRUCTION M ANAGEMENT | A PRIL 12, 2010.
2001 Winter Presentation. Site Location Site View.
Crocker West Building State College, Pa Eric M. FosterStructural OptionSpring 2009.
Daniel Bellay Lancaster County Bible Church Structural Option Lancaster County Bible Church.
3711 Market Street 3711 Market Street Philadelphia, PA Zachary Yarnall l Structural Option AE Senior Thesis l Spring 2010 Faculty Consultant l Professor.
Courtesy of Holbert Apple Associates Georgia Avenue Building Introduction Statistics Gravity System Lateral System Problem Statement & Solution.
Christopher Havens Spring 2012 Dr. Chimay Anumba – CM Advisor Construction Management Penn State AE Senior Capstone Project The Northeastern Pennsylvania.
2001 Final Presentation. The Atlantic Team JARED Georgia Tech Construction Manager PETER Georgia Tech Construction Manager HANS Georgia Tech Owner KIM.
Fisk Corporate Headquarters Houston, Texas Penn State AE Senior Capstone Project Stephen Blanchard – Construction Management Option Advisor: Dr. John Messner.
AE SENIOR THESIS APRIL 14 th, 2014 CHRIS DUARTE – STRUCTURAL Dr. THOMAS BOOTHBY ORCHARD PLAZA.
George Read Hall The University of Delaware
Rockville Metro Plaza II Rockville Pike John Vais | Structural Option PSU AE Senior Thesis 2014 Faculty Advisor – Dr. Hanagan Rockville, Maryland
Hershey Research Park Building One Jonathan Krepps Structural Option Senior Thesis 2013 Faculty Advisor: Dr. Hanagan.
Kenneth G. Langone Athletic and Recreation Center Kyle Oberdorf Structural Option Thesis April 2007.
Senior Thesis Structural Option Ryan Friis Spring Morgan St. Chicago, IL 111 Morgan St. Chicago, IL Ryan Friis Structural Option.
All Hakuna Resort photos in courtesy of LMN Development LLC Young Jeon Structural Option Advisor: Heather Sustersic Hakuna Resort AE Senior Thesis 2015.
Introduction Connected to existing Benton Hall via skywalk Size: 103,154 SF above grade on 4 levels 82,661 SF below grade parking on 3 levels Cost: $23,651,159.
Progress Photos Goodnoe Elementary School Additions and Renovations Project November 2013 Goodnoe Elementary School.
Student Life Building Northampton Community College Introduction Project Overview Braced Frame Analysis Fire Suppression Analysis Roofing Analysis Project.
Kennedy Krieger Institute Outpatient Medical Center Baltimore, Marylan d Katie Sennett Construction Management Dr. Messner Spring 2008.
University Medical Center of Princeton David Bodnar Construction Management 2010 Senior Thesis.
AMERICAN EAGLE OUTFITTERS Quantum II Corporate Headquarters Michael Sandretto Spring – 2007 Structural Option.
Charles Miller Construction Option Spring Dr. Riley WestEnd25.
BRYAN DARRIN SENIOR THESIS PRESENTATION MILLENNIUM HALL DREXEL CAMPUS PHILADELPHIA, PA.
Presented By: Derek Snover Construction Management.
SEAN BEVILLE STRUCTURAL OPTION ADVISOR: PROF. BOOTHBY APRIL 13, 2009 TEMECULA MEDICAL CENTER “STRUCTURAL SYSTEM OPTIMIZATION” THE DEPARTMENT OF ARCHITECTURAL.
Lancaster, PA Courtyard by Marriott Danielle Shetler - Structural Option Senior Thesis - Spring 2005.
The Health Care Center Dauphin County, PA Ken Lorenz Penn State University Architectural Engineering Construction Management April 17, 2007.
The Towers at the City College of New York Robin Scaramastro - Structural Option - Advisor: Dr. Memari Senior Thesis Final Presentation – Spring 2007.
Third Avenue NY, New York Michelle L. Mentzer Structural Option.
Robert M. Arnold Building Fred Hutchinson Cancer Research Center
Howard County General Hospital Patient Tower Addition Columbia, MD Kelly M. Dooley Penn State Architectural Engineering Structural Option.
Waynesburg Central High School Waynesburg, Pennsylvania Robert Owen Brennan The Pennsylvania State University Construction Management.
Ryan Pletz Structural Dr. Hanagan The Pennsylvania State University Department of Architectural Engineering Senior Thesis April 14, 2008.
New Middle School Geneva, Il Greg Kemerer AE Senior Thesis 2006 – CM Option.
Senior Thesis 2006 The Pennsylvania State University
Rensselaer, NY Meral Kanik Structural Option Advisor: A.M. Memari April 14, 2008.
Jonathan Goodroad Structural Option 2005 Thesis Penn State AE Delaware State University Administration and Student Services Building.
Brad Oliver – Structural Option Advisor – Professor Memari.
Craig Owsiany Architectural Engineering – Construction Management STEM Building Hagerstown Community College Hagerstown, Maryland Science Technology.
Oklahoma University Children’s Medical Office Building Oklahoma City, Oklahoma AE Senior Thesis Final Report April 14, 2014 Jonathan Ebersole Structural.
Fordham Place Bronx, NY Aric Heffelfinger Structural Option Spring 2006.
Justin Purcell Structural Option Advisor: Dr. Hanagan.
151 First Side William J. Buchko introduction overview proposal structural depth acoustics breadth cm breadth conclusions 151 First Side Pittsburgh, PA.
Computer Associates International, Regional Office
The Mary J. Drexel Home Assisted Living Addition Bala Cynwyd, PA Penn State AE Senior Capstone Project Gjon Tomaj – Construction Management Option Advisor:
Eastern USA University Academic Center Alexander AltemoseIStructural Option.
Arts & Humanities Instructional Building Noah J. Ashbaugh Construction Management 2006.
SteelStacks Performing Arts Center Sarah Bednarcik | Structural BAE/MAE Faculty Advisors: Dr. Linda Hanagan & Dr. Ali Memari Spring Thesis 2013Bethlehem,
Student Health Center Jacob Brambley - AE (structural option)
Brandon mckee ae senior thesis 2007 construction management penn state university ambridge area high school Ambridge Area High School ambridge, pennsylvania.
Michael A. Troxell Structural Option Senior Thesis 2006 The College of Business Administration Northern Arizona University Flagstaff, Arizona.
Biobehavioral Health Building The Pennsylvania State University Daniel Bodde Structural Option Advisor – Heather Sustersic.
THE NORTHBROOK CORPORATE CENTER Redesign of the Lateral Load Resisting System.
PENN STATE AE SENIOR CAPSTONE PROJECT Adam Lasher │Construction Management Dr. Robert Leicht Susquehanna Health Patient Tower Expansion Williamsport, PA.
Albany Medical Center Patient Pavilion Albany, Ny Thomas J. Kleinosky – Structural Senior Thesis 2012 | Advisor: Dr. Hanagan.
ANTONIO DESANTIS VERNE STRUCTURAL OPTION ADVISOR: PROF. PARFITT APRIL 14, 2008 BRIDGESIDE POINT II PITTSBURGH, PA “BUILDING SYSTEM OPTIMIZATION” THE DEPARTMENT.
Hunter Woron Spring 2012 Structural Professor Parfitt.
North Hall | American University| Washington D.C.
Mountain State Blue Cross Blue Shield Headquarters
Pearl Condominiums Philadelphia, PA
Redifer Commons Addition & Renovation Project
Outline Introduction Structural Redesign Gravity System
FDA CDRH Laboratory Timothy Mueller Senior Thesis, Spring 2006
Justin Pennycoff AE Senior Thesis 2008 Construction Management
North Shore at Canton The Pennsylvania State University
RiverView Condominiums II Chicago, IL
Presentation transcript:

\ Bayhealth Medical Center Expansion Dover, Delaware Introduction Penn State AE Senior Capstone Project Christopher Barron Construction Management CM Advisor – Dr. Anumba PRESENTATION OUTLINE  Project Introduction  Analysis 1: Curtain Wall Timeline  Analysis 2: Green Roof Addition  Structural Breadth  Mechanical Breadth  Analysis 3: Prefabrication  Summary of Analyses  Acknowledgements

\ Bayhealth Medical Center Expansion Dover, Delaware Project Background Location: Dover Delaware Phase two expansion Existing Facility Podium Building Welcome Center Emergency Department Integrated Cancer Center Parking Garage Bridge Central Service Building PRESENTATION OUTLINE  Project Introduction  Analysis 1: Curtain Wall Timeline  Analysis 2: Green Roof Addition  Structural Breadth  Mechanical Breadth  Analysis 3: Prefabrication  Summary of Analyses  Acknowledgements

\ Bayhealth Medical Center Expansion Dover, Delaware Project Background Location: Dover Delaware PRESENTATION OUTLINE  Project Introduction  Analysis 1: Curtain Wall Timeline  Analysis 2: Green Roof Addition  Structural Breadth  Mechanical Breadth  Analysis 3: Prefabrication  Summary of Analyses  Acknowledgements Phase two expansion Existing Facility Podium Building Welcome Center Emergency Department Integrated Cancer Center Parking Garage Bridge Central Service Building

\ Bayhealth Medical Center Expansion Dover, Delaware Project Background Location: Dover Delaware PRESENTATION OUTLINE  Project Introduction  Analysis 1: Curtain Wall Timeline  Analysis 2: Green Roof Addition  Structural Breadth  Mechanical Breadth  Analysis 3: Prefabrication  Summary of Analyses  Acknowledgements Phase two expansion Existing Facility Podium Building Welcome Center Emergency Department Integrated Cancer Center Parking Garage Bridge Central Service Building

\ Bayhealth Medical Center Expansion Dover, Delaware Project Background Location: Dover Delaware PRESENTATION OUTLINE  Project Introduction  Analysis 1: Curtain Wall Timeline  Analysis 2: Green Roof Addition  Structural Breadth  Mechanical Breadth  Analysis 3: Prefabrication  Summary of Analyses  Acknowledgements Phase two expansion Existing Facility Pavilion Building Welcome Center Emergency Department Integrated Cancer Center Parking Garage Bridge Central Service Building

\ Bayhealth Medical Center Expansion Dover, Delaware Project Background Location: Dover Delaware PRESENTATION OUTLINE  Project Introduction  Analysis 1: Curtain Wall Timeline  Analysis 2: Green Roof Addition  Structural Breadth  Mechanical Breadth  Analysis 3: Prefabrication  Summary of Analyses  Acknowledgements Phase two expansion Existing Facility Pavilion Building Welcome Center Emergency Department Integrated Cancer Center Parking Garage Bridge Central Service Building

\ Bayhealth Medical Center Expansion Dover, Delaware Project Background Podium Building - Function: Hospital - Size: 215,000 sq ft - Building Cost: GMP 65 million - Construction Dates: Oct 7, 2008 – AUG 19, Delivery Method: Design-Bid-Build CM Agency PRESENTATION OUTLINE  Project Introduction  Analysis 1: Curtain Wall Timeline  Analysis 2: Green Roof Addition  Structural Breadth  Mechanical Breadth  Analysis 3: Prefabrication  Summary of Analyses  Acknowledgements

\ Bayhealth Medical Center Expansion Dover, Delaware Project Background Structural System - Braced frame - Bay size 30’ X 30’ - Oversized system Building Facade - Schuco FW 60 Mullion- Transom System - Masonry brick - Preformed metal siding PRESENTATION OUTLINE  Project Introduction  Analysis 1: Curtain Wall Timeline  Analysis 2: Green Roof Addition  Structural Breadth  Mechanical Breadth  Analysis 3: Prefabrication  Summary of Analyses  Acknowledgements

\ Bayhealth Medical Center Expansion Dover, Delaware Analysis 1: Curtain Wall Timeline Problem Statement - Conflicting waterproofing systems of the three façade systems made it difficult to get the podium building’s enclosure watertight Goal - Study the current façade system used - Investigate the reason why making it water tight became so problematic - Construct timeline to portray events - Summarize events FW 60 Mullion-Transom System PRESENTATION OUTLINE  Project Introduction  Analysis 1: Curtain Wall Timeline  Analysis 2: Green Roof Addition  Structural Breadth  Mechanical Breadth  Analysis 3: Prefabrication  Summary of Analyses  Acknowledgements

\ Bayhealth Medical Center Expansion Dover, Delaware Analysis 1: Curtain Wall Timeline Lack of design - 70% designed when project was bid Sequencing - In order for waterproof system to work, the metal panels needed to be installed before curtain wall - Designed for curtain wall to be installed before metal panels Space constraints - In order to build to specifications, the brick waterproofing would have needed to be installed in a 5/8” caulking joint Issue Discovered Reactions How Issued Was Solved Recommendations → PRESENTATION OUTLINE  Project Introduction  Analysis 1: Curtain Wall Timeline  Analysis 2: Green Roof Addition  Structural Breadth  Mechanical Breadth  Analysis 3: Prefabrication  Summary of Analyses  Acknowledgements

\ Bayhealth Medical Center Expansion Dover, Delaware Analysis 1: Curtain Wall Timeline Owner/ Architect - Did not want to change curtain walls appearance - Brought skin consultant on Whiting-Turner - Wanted to change to a similar curtain wall system - Would have eliminated tying ABV into brick - Less fabrication time Issue Discovered Reactions How Issued Was Solved Recommendations → PRESENTATION OUTLINE  Project Introduction  Analysis 1: Curtain Wall Timeline  Analysis 2: Green Roof Addition  Structural Breadth  Mechanical Breadth  Analysis 3: Prefabrication  Summary of Analyses  Acknowledgements

\ Bayhealth Medical Center Expansion Dover, Delaware Analysis 1: Curtain Wall Timeline Watertight Wall was Erected - Built behind curtain wall - Kept project’s schedule critical path on track Additional Waterproofing Measures Taken - AVB wrapped into all sides of the building - Stainless steel flashing - Any further gaps were caulked shut Issue Discovered Reactions How Issued Was Solved Recommendations → PRESENTATION OUTLINE  Project Introduction  Analysis 1: Curtain Wall Timeline  Analysis 2: Green Roof Addition  Structural Breadth  Mechanical Breadth  Analysis 3: Prefabrication  Summary of Analyses  Acknowledgements

\ Bayhealth Medical Center Expansion Dover, Delaware Analysis 1: Curtain Wall Timeline Summary - Over $400,000 in design changes added - Additional 6 Weeks Added to the Project Schedule Recommendations - Better collaboration between all parties - Switch to alternative system - Bring CM onto project earlier Issue Discovered Reactions How Issued Was Solved Recommendations → PRESENTATION OUTLINE  Project Introduction  Analysis 1: Curtain Wall Timeline  Analysis 2: Green Roof Addition  Structural Breadth  Mechanical Breadth  Analysis 3: Prefabrication  Summary of Analyses  Acknowledgements

\ Bayhealth Medical Center Expansion Dover, Delaware Analysis: 2 Green Roof Addition Problem Statement - Few sustainable ideas implemented on the Bayhealth Medical Center Expansion Goal - Study green roof technology, and then determine its cost effectiveness on this project - Located on the Third Floor - Total 28,000 SQ FT PRESENTATION OUTLINE  Project Introduction  Analysis 1: Curtain Wall Timeline  Analysis 2: Green Roof Addition  Structural Breadth  Mechanical Breadth  Analysis 3: Prefabrication  Summary of Analyses  Acknowledgements

\ Bayhealth Medical Center Expansion Dover, Delaware Analysis: 2 Green Roof Addition Growth Media - Blend of organic and inorganic components Vegetation - Perennials, grasses, shrubs, etc System Chosen Manufacturer - GreenGrid roofing systems Module - 2’X2’X4” 100% Pre-consumer recycled polyethylene trays Weight - 18 to 22 lbs/ft 2 (Wet) PRESENTATION OUTLINE  Project Introduction  Analysis 1: Curtain Wall Timeline  Analysis 2: Green Roof Addition  Structural Breadth  Mechanical Breadth  Analysis 3: Prefabrication  Summary of Analyses  Acknowledgements Modular Green Roof System

\ Bayhealth Medical Center Expansion Dover, Delaware Analysis: 2 Green Roof Addition Roof Loads - Live = 25 PSF - Dead = 15 PSF - Snow = 24 PSF - Green Roof = 20 PSF - Conc. Slab = 24 PSF Total = 94 PSF Existing Roof DetailCurrent Roof Slab - Composite deck 3-¼” LW concrete - 18 gauge galvanized metal decking - 3” to 1.5” tapered insulation - 5/8” cover board - Single ply EPDM membrane PRESENTATION OUTLINE  Project Introduction  Analysis 1: Curtain Wall Timeline  Analysis 2: Green Roof Addition  Structural Breadth  Mechanical Breadth  Analysis 3: Prefabrication  Summary of Analyses  Acknowledgements - The dead load is less than the snow load therefore the snow load is used

\ Bayhealth Medical Center Expansion Dover, Delaware Analysis: 2 Green Roof Addition Shear = WL/2 Moment = WL^2/8 - All beams were considered simply supported - Bare beam capacity was used despite a composite beam system PRESENTATION OUTLINE  Project Introduction  Analysis 1: Curtain Wall Timeline  Analysis 2: Green Roof Addition  Structural Breadth  Mechanical Breadth  Analysis 3: Prefabrication  Summary of Analyses  Acknowledgements - Girders were also determined to be sufficiently sized

\ Bayhealth Medical Center Expansion Dover, Delaware Analysis: 2 Green Roof Addition PRESENTATION OUTLINE  Project Introduction  Analysis 1: Curtain Wall Timeline  Analysis 2: Green Roof Addition  Structural Breadth  Mechanical Breadth  Analysis 3: Prefabrication  Summary of Analyses  Acknowledgements Typical Bay Used (Column Line / H-L) Column K12 (Interior) W14 X 145 Live Load = PSF Dead Load = 57 PSF - Roof Load = kip - Floor load = kip/floor Column L12 (exterior) W14 X 120 Live Load = PSF Dead Load = 57 PSF - Roof Load = kip - Floor load = kip/floor

\ Bayhealth Medical Center Expansion Dover, Delaware Analysis: 2 Green Roof Addition Roof54.34 kip P U = th51.03 kip P U < th51.03 kip 8th kip 7th51.03 kip 6th51.03 kip 5th51.03 kip 4th51.03 kip 3th51.03 kip 2th51.03 kip 1th51.03 kip Roof98.48 kip P U = th kip P U < th kip 8th kip 7th kip 6th kip 5th kip 4th kip 3th kip 2th kip 1th kip PRESENTATION OUTLINE  Project Introduction  Analysis 1: Curtain Wall Timeline  Analysis 2: Green Roof Addition  Structural Breadth  Mechanical Breadth  Analysis 3: Prefabrication  Summary of Analyses  Acknowledgements

\ Bayhealth Medical Center Expansion Dover, Delaware Analysis: 2 Green Roof Addition R Values Original Roof - 3 ¼” LW Conc.(80psf) = gauge decking = 0 - 3” rigid insulation = /8 roof board =.85 U value (1/ƩR = ) With Green Roof - 3 ¼” LW Conc.(80psf) = gauge decking = 0 - 3” rigid insulation = /8 roof board =.85 - Green roof = 5 U value (1/ƩR = ) - The change in mechanical loading was determined using Trace software - Limited change was observed - Therefore, no reduction of the mechanical system can be preformed PRESENTATION OUTLINE  Project Introduction  Analysis 1: Curtain Wall Timeline  Analysis 2: Green Roof Addition  Structural Breadth  Mechanical Breadth  Analysis 3: Prefabrication  Summary of Analyses  Acknowledgements

Bayhealth Medical Center Expansion Dover, Delaware Analysis: 2 Green Roof Addition Other Possible Benefits - Roof shading - Plant transpiration - Aesthetically pleasing - The change in mechanical loading was determined using Trace software - Limited change was observed - Therefore, no reduction of the mechanical system can be preformed PRESENTATION OUTLINE  Project Introduction  Analysis 1: Curtain Wall Timeline  Analysis 2: Green Roof Addition  Structural Breadth  Mechanical Breadth  Analysis 3: Prefabrication  Summary of Analyses  Acknowledgements

\ Bayhealth Medical Center Expansion Dover, Delaware Analysis: 2 Green Roof Addition Schedule Impacts Cost Impacts - Material / Delivery: $10-$15 per SQ/FT - Installation: $3-$6 per SQ/FT Total Cost $462,000 - Installation Time: Five Days - Will have no impact on project’s overall schedule PRESENTATION OUTLINE  Project Introduction  Analysis 1: Curtain Wall Timeline  Analysis 2: Green Roof Addition  Structural Breadth  Mechanical Breadth  Analysis 3: Prefabrication  Summary of Analyses  Acknowledgements

\ Bayhealth Medical Center Expansion Dover, Delaware Analysis: 2 Green Roof Addition Summary - Building’s structural system is more than adequate - Mechanical system cannot be reduced - Total cost of green roof addition: $462,000 Recommendations - Because one of the owner’s concerns is cost, this is not a worthwhile addition at this time PRESENTATION OUTLINE  Project Introduction  Analysis 1: Curtain Wall Timeline  Analysis 2: Green Roof Addition  Structural Breadth  Mechanical Breadth  Analysis 3: Prefabrication  Summary of Analyses  Acknowledgements

\ Bayhealth Medical Center Expansion Dover, Delaware Analysis: 3 Prefabrication Goal - Determine potential areas to implement prefabrication - Determine advantages of prefabrication - Evaluate possible cost and time savings Problem Statement - Because of the extensive amount of MEP systems needed in a hospital, a lot of time and money is spent installing these systems PRESENTATION OUTLINE  Project Introduction  Analysis 1: Curtain Wall Timeline  Analysis 2: Green Roof Addition  Structural Breadth  Mechanical Breadth  Analysis 3: Prefabrication  Summary of Analyses  Acknowledgements

\ Bayhealth Medical Center Expansion Dover, Delaware Analysis: 3 Prefabrication Miami Valley Hospital - Similar to Bayhealth Medical Center - Patient rooms and overhead corridor racks prefabricated Where to perform prefabrication - Area with high level of MEP - Patient exam rooms, trauma rooms - Concluded 41 appropriate rooms PRESENTATION OUTLINE  Project Introduction  Analysis 1: Curtain Wall Timeline  Analysis 2: Green Roof Addition  Structural Breadth  Mechanical Breadth  Analysis 3: Prefabrication  Summary of Analyses  Acknowledgements Sector A of First Floor

\ Bayhealth Medical Center Expansion Dover, Delaware Analysis: 3 Prefabrication Time and Cost Savings - Estimated 1,352 LF of partition wall in Sector A - 30% inside the highlighted area - 90 working days to install the partition walls highlighted PRESENTATION OUTLINE  Project Introduction  Analysis 1: Curtain Wall Timeline  Analysis 2: Green Roof Addition  Structural Breadth  Mechanical Breadth  Analysis 3: Prefabrication  Summary of Analyses  Acknowledgements Activity DescriptionDuration FA IN WALL20 IN WALL BLOCKING15 HEADWALL UNIT ROUGH-IN BOXES15 BAS IN WALL15 DW IN WALL INSTALL, TEST+INSUL20 MED GAS IN WALL INSTALL+TEST15 ELECT POWER, LIGHTING+LV RACEWAYS IN WALL50 DUCTWORK IN WALL, INSTL+TEST10 WALL-ELECTRICAL DEVICES50 WALL-LV DEVICES50 WALL-FA DEVICES20 WALL-PLBG+MED GAS DEVICES20 Total Days300

\ Bayhealth Medical Center Expansion Dover, Delaware Analysis: 3 Prefabrication Time and Cost Savings - Conservatively applying the Miami Valley Hospital’s production rates, the installation rates were Increased to 125% and 150% - At 125% production rates, an average of.64 days can be saved per prefabricated room - It was determined that 1% to 2% of the total project cost was saved PRESENTATION OUTLINE  Project Introduction  Analysis 1: Curtain Wall Timeline  Analysis 2: Green Roof Addition  Structural Breadth  Mechanical Breadth  Analysis 3: Prefabrication  Summary of Analyses  Acknowledgements Original Production Rates125% Production Rates150% production Rates Schedule Days Savings At 125% working days are saved on the entire project -1% is Equal to $650,000

\ Bayhealth Medical Center Expansion Dover, Delaware Analysis: 3 Prefabrication Summary - Reduction of man hours - Less waste - Time savings - Cost savings Recommendations - Cost and schedule are two aspects the owner is concerned with, so prefabrication would be an effective tool because of its possible cost and schedule savings PRESENTATION OUTLINE  Project Introduction  Analysis 1: Curtain Wall Timeline  Analysis 2: Green Roof Addition  Structural Breadth  Mechanical Breadth  Analysis 3: Prefabrication  Summary of Analyses  Acknowledgements Prefabrication Warehouse

\ Bayhealth Medical Center Expansion Dover, Delaware Summary Analysis 3: Prefabrication - Cost and schedule are two aspects the owner is concerned with, so prefabrication would be an effective tool due to its possible cost and schedule savings Analysis 1: Curtain Wall Timeline - Better collaboration among all parties - Switch to alternative system - Bring CM onto project earlier Analysis 2: Green Roof Addition - Because one of the owner’s concerns is cost, this is not a worthwhile addition at this time PRESENTATION OUTLINE  Project Introduction  Analysis 1: Curtain Wall Timeline  Analysis 2: Green Roof Addition  Structural Breadth  Mechanical Breadth  Analysis 3: Prefabrication  Summary of Analyses  Acknowledgements

Bayhealth Medical Center Expansion Dover, Delaware Acknowledgements Industry Acknowledgements:Academic Acknowledgements: Penn State AE Faculty Dr. Anumba (CM Advisor) Special Thanks To: The Bayhealth Medical Center Project team Mr. Craig Dubler My AE Friends Questions