1 Student Health Center Jacob Brambley - AE (structural option)

2 Location : University Park, PA Size: 64,000 SF – 5 stories Use: Offices, pharmacy, exam rooms Architecture: Brick facade accented with stone bands; large curtain wall Structure: Steel w/ slab on deck floor Student Health Center (Current Building)

3 Lateral Force Resisting System Student Health Center (Current Building)

4 - Examine the design effects of changing overall building structure including cost and schedule analysis - Use computer programs to aid in design of building components - Design shading system to remedy current problems Goals

5 Redesign of the SHC Add extra floor w/o increasing building height by decreasing floor thickness Redesign of Student Health Center - Post-tensioned floor system - Concrete columns - Shear walls - Foundations Cost/Schedule impacts Shading Systems Questions

6 Redesign of the SHC 8” Slab Typical design strip in x-direction: (11) - ½” tendons Typical design strip in y-direction: (14) – ½“ tendons Redesign of Student Health Center - Post-tensioned floor system - Concrete columns - Shear walls - Foundations Cost/Schedule impacts Shading Systems Questions PT Floor System:

7 Redesign of the SHC Redesign of Student Health Center - Post-tensioned floor system - Concrete columns - Shear walls - Foundations Cost/Schedule impacts Shading Systems Questions PT Floor System:

8 Redesign of the SHC Problem Areas - Openings > 4 ft - Along cantilever Redesign of Student Health Center - Post-tensioned floor system - Concrete columns - Shear walls - Foundations Cost/Schedule impacts Shading Systems Questions

9 Redesign of the SHC Redesign of Student Health Center - Post-tensioned floor system - Concrete columns - Shear walls - Foundations Cost/Schedule impacts Shading Systems Questions Columns: - Sizes based off first level, worst case (1065 k) - 18” x 18” throughout

10 Redesign of the SHC - Placement (Open Plan) - Strength and Drift Considerations Redesign of Student Health Center - Post-tensioned floor system - Concrete columns - Shear walls - Foundations Cost/Schedule impacts Shading Systems Questions Shear Walls:

11 Redesign of the SHC Redesign of Student Health Center - Post-tensioned floor system - Concrete columns - Shear walls - Foundations Cost/Schedule impacts Shading Systems Questions Shear Walls:

12 Redesign of the SHC Redesign of Student Health Center - Post-tensioned floor system - Concrete columns - Shear walls - Foundations Cost/Schedule impacts Shading Systems Questions Shear Walls:

13 Redesign of the SHC Building weight from 8,222 kips to 11,392 kips Redesign of Student Health Center - Post-tensioned floor system - Concrete columns - Shear walls - Foundations Cost/Schedule impacts Shading Systems Questions Foundation:

14 Redesign of the SHC Redesign of Student Health Center - Post-tensioned floor system - Concrete columns - Shear walls - Foundations Cost/Schedule impacts Shading Systems Questions Foundation: Changed to 4-pile pile caps instead of 3

15 Cost / Schedule Impacts Redesign of Student Health Center - Post-tensioned floor system - Concrete columns - Shear walls - Foundations Cost/Schedule impacts Shading Systems Questions Cost Comparison:

16 Cost / Schedule Impacts Redesign of Student Health Center - Post-tensioned floor system - Concrete columns - Shear walls - Foundations Cost/Schedule impacts Shading Systems Questions Cost Comparison: Didn’t take into account: - Contractors Available - Additional Floor Work - Additional Piles - Mechanical/Electrical Usage

17 Cost / Schedule Impacts Redesign of Student Health Center - Post-tensioned floor system - Concrete columns - Shear walls - Foundations Cost/Schedule impacts Shading Systems Questions Schedule Comparison: Steel Structure: 177 days Conc. Structure: 234 days Didn’t take into account: - Lead Time - Additional Floor Work - Additional Piles - Connections

18 Cost / Schedule Impacts Redesign of Student Health Center - Post-tensioned floor system - Concrete columns - Shear walls - Foundations Cost/Schedule impacts Shading Systems Questions CM Conclusion: - Concrete structure costs less - Steel structure is a quicker build - More analysis is needed

19 Shading Systems Redesign of Student Health Center - Post-tensioned floor system - Concrete columns - Shear walls - Foundations Cost/Schedule impacts Shading Systems Questions Problems with current fabric shades Architectural Impacts Possible energy savings Two systems studied: - Louvers - Light Shelves

20 Shading Systems Redesign of Student Health Center - Post-tensioned floor system - Concrete columns - Shear walls - Foundations Cost/Schedule impacts Shading Systems Questions Louvers: Fit in with nearby architecture Economical Easily Installed

21 Shading Systems Redesign of Student Health Center - Post-tensioned floor system - Concrete columns - Shear walls - Foundations Cost/Schedule impacts Shading Systems Questions Louvers: 10 ft ceiling 30” projection

22 Shading Systems Redesign of Student Health Center - Post-tensioned floor system - Concrete columns - Shear walls - Foundations Cost/Schedule impacts Shading Systems Questions Light Shelves: Energy Savings Better atmosphere

23 Energy Savings : Shading Systems Redesign of Student Health Center - Post-tensioned floor system - Concrete columns - Shear walls - Foundations Cost/Schedule impacts Shading Systems Questions Light Shelves: # of light bulbs in corridor = 100 KWh used per year = 9,344 Electricity Cost (@ $0.10 per KWh) = $934.40 Savings with light shelves = $150

24 Shading Systems Redesign of Student Health Center - Post-tensioned floor system - Concrete columns - Shear walls - Foundations Cost/Schedule impacts Shading Systems Questions Conclusion: Dual System

25 Thesis Conclusions Redesign of Student Health Center - Post-tensioned floor system - Concrete columns - Shear walls - Foundations Cost/Schedule impacts Shading Systems Questions - New concrete building appears to work well and be more cost effective than steel - Downside in schedule - Have to look into program that needs space - Learned the ins and outs of two computer programs - Shading systems viable to reduce need for fabric shading

26 Questions? I would like to thank the following people for their assistance with this thesis project: My family and friends for their encouragement; OPP for answering my many questions; AE faculty for continued help throughout; Outside consultants for clarification; Fellow AE students Redesign of Student Health Center - Post-tensioned floor system - Concrete columns - Shear walls - Foundations Cost/Schedule impacts Shading Systems Questions