1 King Fahd University of Petroleum & Minerals Department of Construction Engineering & Management CEM 515: Project Quality Management Case study of 8-phases.

Slides:



Advertisements
Similar presentations
Systems Analysis & IT Project Management Pepper. System Life Cycle BirthDeathDevelopmentProduction.
Advertisements

How to Document A Business Management System
(TITLE SLIDE) GetConnected 2015 Poster Template *This template serves to provide recommendations only. The presenter is ultimately responsible for organizing.
Presented By The University of Texas-School of Public Health
The ISO 9002 Quality Assurance Management System
Project quality management Cody Ronning 3/23/2015.
Project Integration Management Sections of this presentation were adapted from A Guide to the Project Management Body of Knowledge 4 th Edition, Project.
MSIS 110: Introduction to Computers; Instructor: S. Mathiyalakan1 Systems Design, Implementation, Maintenance, and Review Chapter 13.
Chapter 15 Work Flows Focus: This chapter describes the basic tools and techniques for analysis.
Business Performance Management (BPM)
1 Chapter 3 Project Organization, Selection, and Definition.
Pertemuan Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
QMS, ISO and Six Sigma It’s all related….. QMS Any Quality Management System must satisfy four requirements: Processes must be defined and their procedures.
ENVIRONMENTAL DATA MANAGEMENT & SHALE GAS PROGRAMS INTERNATIONAL PETROLEUM ENVIRONMENTAL CONFERENCE NOVEMBER 14, 2013.
Done by: Abdulrahman A. Al-Hussain I.D Done for: Prof. Abdulaziz Bubshait Term 082 – June 2009 King Fahd University of Petroleum and Minerals.
Overview of Lean Six Sigma
Barry Murash MBBit Nortel 2007
Project Life Cycle Introduction and Overview © Ed Green Penn State University All Rights Reserved.
Welcome ISO9001:2000 Foundation Workshop.
Managing Project Quality
Effectively applying ISO9001:2000 clauses 5 and 8
This material was produced under grant number SH SH-1 from the Occupational Safety and Health Administration, U.S. Department of Labor. It does not.
Six Sigma By: Tim Bauman April 2, Overview What is Six Sigma? Key Concepts Methodologies Roles Examples of Six Sigma Benefits Criticisms.
QUALITY These slides have been added to the standard MRU PM Cert materials and are made available to students who have attended my class. Robin Hornby.
How get your project management or professional services organization ISO 9001 certified.
Revenue Cycle Management Medical Technology Acquisition and Assessment Team Members: Joseph Dixon, Michael Morotti, Mari Pirie-St. Pierre, David Robbins.
Mantova 18/10/2002 "A Roadmap to New Product Development" Supporting Innovation Through The NPD Process and the Creation of Spin-off Companies.
BIS310: Structured Analysis and Design Introduction and Systems Planning Week 1.
Database System Development Lifecycle © Pearson Education Limited 1995, 2005.
Everyone Has A Role and Responsibility
Lecture #9 Project Quality Management Quality Processes- Quality Assurance and Quality Control Ghazala Amin.
© EAGLE Registrations Inc CONFIDENTIAL 1 Experience Speaks of Lessons Learned ASQ Illiana February 15, 2011.
Principles of Information Systems, Sixth Edition Systems Design, Implementation, Maintenance, and Review Chapter 13.
1 LSSG Green Belt Training Control: How do we make it happen at a controlled speed?
Strong9 Consulting Services, LLC 1 PMI - SVC I-80 Breakfast Roundtable Monthly Meeting Thursday, October 12, :00 am – 9:00 am.
Chapter 7: A Summary of Tools Focus: This chapter outlines all the customer-driven project management tools and techniques and provides recommendations.
Principles of Information Systems, Sixth Edition Systems Design, Implementation, Maintenance, and Review Chapter 13.
TEPM 6304: Quality Improvement in Project Management Project Quality Management & Course Overview.
Develop Project Charter
Project quality management. Introduction Project quality management includes the process required to ensure that the project satisfies the needs for which.
TQM Study For Telecom Towers King Fahd University of Petroleum & Minerals Department of Construction Engineering & Management CEM 515: Project Quality.
Systems Development Life Cycle
Version 10.0  The High Performance Organisation Ltd Creating A Process Based Management System 1 Welcome Creating a Process Based Management.
Chapter 6: THE EIGHT STEP PROCESS FOCUS: This chapter provides a description of the application of customer-driven project management.
1 EMS Fundamentals An Introduction to the EMS Process Roadmap AASHTO EMS Workshop.
Principles of Information Systems, Sixth Edition 1 Systems Design, Implementation, Maintenance, and Review Chapter 13.
Consultant Advance Research Team. Outline UNDERSTANDING M&E DATA NEEDS PEOPLE, PARTNERSHIP AND PLANNING 1.Organizational structures with HIV M&E functions.
1 Project Management C53PM Session 3 Russell Taylor Staff Work-base – 1 st Floor
The Second Annual Medical Device Regulatory, Reimbursement and Compliance Congress Presented by J. Glenn George Thursday, March 29, 2007 Day II – Track.
What is project management?
Chapter 11  2000 by Prentice Hall System Analysis and Design: Methodologies and Tools Uma Gupta Introduction to Information Systems.
There are 6 main components to Care Provider’s Committed to Quality Program: Visionary Leadership Mission Statement Customer Satisfaction Employee Satisfaction.
Session 2: Developing a Comprehensive M&E Work Plan.
Process Auditing Why do people think that this is something new? Presented by Kevin Gilson, Orion Registrar, Inc. For the ASQ ISO Users Group October 8,
King Fahd University of Petroleum & Minerals Department of Construction Engineering & Management CEM 515: Project Quality Management Case study of Implementation.
1 Week 5 Software Engineering Fall Term 2015 Marymount University School of Business Administration Professor Suydam.
UNDERSTANDING ISO 9001:2008.
Contents Playbook Objectives Playbook Value Details Playbook Design
System Design, Implementation and Review
Six Sigma Approach.
So where in ISO is Process?
APPLICATION RISK AND CONTROLS
Black Belt Project Storyboard Template Can be used in combination with Black Belt Storyboard Submission Guide Visit GoLeanSixSigma.com for more Lean Six.
OPS/571 Operations Management
Quality Management Six Sigma
in Construction Industry
Chapter 1: Introduction to Process Management
Stewardship in biotechnology
Process Auditing Why do people think that this is something new?
Practical Assessment Project Template – DMADV
Presentation transcript:

1 King Fahd University of Petroleum & Minerals Department of Construction Engineering & Management CEM 515: Project Quality Management Case study of 8-phases implementation HEALTH CARE FINANCES Professor Abdulaziz A. Bubshasit

2 Outline Introduction and case description Objective The eight step process Define Quality Issue Understand & Define the process Select Improvement Opportunities Analyze the improvement opportunity Take action Check results Implement the opportunity Monitor results Summary

3 Introduction and case description HEALTH CARE FACILITIES CONSISTS OF SIX OPERATIONAL DEPARTMENTS. THIS FACILITY SERVES THE CHEMICALLY DEPENDENT PATIENTS AND THEIR FAMILIES. THIS CASE STUDY FOCUSES ON QUALITY IMPROVEMENT OF FINANCIAL DATA AND INFORMATION HANDALING MANAGEMENT.

4 Objective To improve the Quality System in the health care facilities. To eliminate the system defects and financial losses. To set a new system and procedure Methodology : the eight steps of CDPM Improvement Methodology have been used

5 DEFINE THE QUALITY ISSUE UNDERSTAND AND DEFINE PROCESS SELECT IMPROVEMENT OPPORTUNITIES ANALYZE IMPROVEMENT OPPORTUNITIES TAKE ACTION CHECK RESULTS IMLEMENT IMPROVEMENT MONITOR RESULTS TOTAL CUSTOMER SATISFACTION THE EIGHT STEP PROCESS

6 PHASE 1: Define Quality Issue Communicate results & manage stakeholder relations Inaccurate Financial reporting FINANCIAL REPORTING DOES NOT MEET CUSTOMER NEEDS AND EXPECTATION INPUT FORM QUALITY TEAM BRAINSTORMING METHOD PROCESS OUTPUT Availability of financial data for decision making Customer Reporting system Must be meet

7 PHASE 2: Understand & Define the process Improve the financial report system Defined mission statement Providing info. To six operational departments Defined process Input Work flow diagrams (Identify top-level &top-down Process) Major disconnects in logical and physical data links Inadequate manual filling procedures Process logical and physical Data link manual filling procedures Output

8 Phase 3: Select Improvement Opportunities logical and physical Data link manual filling procedures Input Process The improvement opportunities Manual transfer of information in different format between 6 departments. Output Statistical Analysis Method Absence of physical data links between the six departments was costing $1540 a week in terms of redundant labor

9 Phase 4: Analyze the improvement opportunity The improvement opportunities Manual transfer of information in different format between 6 departments. Input Cause-and-effect analysis diagram Single source for data & information Financial data considered personnel data not corporate data Financial data shall be corporate not personnel data Process Output Project Objective

10 Phase 5: Take action Financial data shall be corporate not personnel data Input Project Objective BRINSTORMING &SELECTION TOOLS (TO CONFIRM CUSTOMER NEEDS) USER ACCEPANCE TEST QFD “HOUSE OF QUALITY” WBS DEVELOPED TO PROVIDE GRAPHIC PICTURE OF DELIVERABLE (HARDE &SOFT WARE, SCREENS, DATA BASE) New mental model of the new system designed. New operation procedure. OUTPUT

11 Phase 6: check results New mental model of the new system designed. New operation procedure. DATA STATISTICAL ANALYSIS THE DEVELOPED USER ACCEPTANCEPLAN IMPLEMENTED Prototype system reviewed and accepted process input Accepted design and operation procedure of the new system Project deliverable for implementation

12 Phase 7: Implement the improvement Accepted new system for implementation The new system is running Writing manuals and procedures Training and education process input The new system along with all required procedure, operation and maintenance manuals and training guide. Output

13 Phase 8: Monitor results New system improvement opportunities operational new system meeting customer needs INPUT New opportunities From customer feedback Move again into project definition PROCESS OUTPUT Total customer satisfaction

14 Summary Third party auditing system is recommended and shall be part of the health care facility policy. More effective and advanced measurement tools shall be utilized to alert the top management in case of deficiencies or deviation One year plan a head should be established and maintained as road map to wards successes and prosperity. Customer should do this practice at the beginning by implementing all quality system requirements to prevent losses and unnecessary cost impact. All these data and procedure shall be maintained and made available as lesson learn to every body in the organization.

15 Thank You