East Side Access Outreach

Slides:



Advertisements
Similar presentations
1 ESA Facts Over the past few months, we have reported on the actual and potential loss of schedule contingency (the IEC has reported that their analysis.
Advertisements

Replacement of the Queens Approach Bronx-Whitestone Bridge
New York State Department of Transportation Region 11 Reconstruction of Jamaica Avenue Bridge over I-678 Van Wyck Expressway The Roll-in/Roll Out Method.
CONSTRUCTION DRILLING INC.
Cofferdam.
CONSTRUCTION DRILLING INC. SPECIALIZING IN UNIQUE DRILLING AND CUT-OFF WALL SOLUTIONS.
Aubrey Green Community Meeting Issues and Opportunities Vandalism Safety Community Image Community Opportunities and Renewal Who is here and Why PW - Parks.
February 12, 2010 Government Center Station Reconstruction Project Green Line / Blue Line Public Meeting December, 2012.
TRAFFIC MANAGEMENT Tender and Construction Phase
OUTSOURCING INDUSTRIAL WASTEWATER TREATMENT Jerzy Kołłajtis – Magda Trybuch –
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Beneficial Occupancy Readiness Evaluation Plan Update Brian Heneveld, P.E., CIH NSLS-II BORE Coordinator Conventional.
Post Graduated Master Course TUNNELLING AND TUNNEL BORING MACHINES
1 UPCOMING OPPORTUNITIES – Contractors Caissons Contractor(s) to perform installation of caissons to include purchase of all required materials. u Low/High.
The South Carolina Design-Build Experience Presented by: Rocque L
CMGC Contracting at UDOT Program, Projects & Lessons Learned
11 Grant Park Sewer Rehabilitation Project BES Project #E10346 Bid # SCOPE: Rehabilitation, Replacement, or Relocation of Sanitary & Combined Sewers,
MDOT ACTT Workshop Structures I-94 From I-96 to East of Connor Participants Steve Stroh, URS Corp Vijay Chandra, Parson Brinckerhoff Raj Ailaney, FHWA.
CEM-512 Value Engineering Highway Project: South Interchange.
Tunnelling Methods.
Major Construction Completed
UPCOMING MTA CAPITAL CONSTRUCTION SOLICITATIONS
 Project Delivery  Design Considerations  Lessons Learned.
Foundations. Foundation supports weight of structure –Includes soil and rock under foundation –Building construction described by foundation type Slab.
Alderman Road Residences Phase II Design Build. Extensive master planning preceded this phase 2003 – Dagit Saylor Master Plan Hanbury Evans Update.
YALE UNIVERSITY SOCIAL SCIENCES BUILDING GPHB & ASSOCIATES Brad Otto, Client Liaison/Editor-in Chief Jake Wagle, Project Engineer Jimmy Murray, Project.
Whittier Access Project, Alaska The Anton Anderson Memorial Tunnel Whittier Access Project.
ESTIMATING By Laith Jacob.
Bob Law FAC Oct 24, Sector 20 Project Overview Sector 20 Site Plan Description Organizational Chart Schedule Cost.
JAMES THOMSON C. ENG JACKED STRUCTURES SA JACKED STRUCTURES SA A New Approach to Constructing Underground Stations.
Waste Update Rail Environment Infrastructure Presentation Thursday 15th August 2013.
Types of Drawings University of Palestine Eng. Nagham Ali Hasan
Page 1 MINISTRY OF TRANSPORTATION Cyrville Road Bridge Replacement at Highway 417 (Ottawa Queensway) Detail Design Study Group Work Project
Broadway Street Viaduct Improvement, Pre-Load Testing and Geotech Report Workshop Consultant Presentation Iowa DOT 2 nd April 2007.
Ottawa’s Light Rail Transit Project OLRT Tunnel Geotechnical Update Technical Briefing December 21, 2010 John Jensen Director Rail Implementation Office.
MTA Regional Commuter Rail System. Bringing the LIRR to Grand Central Terminal (GCT) - Route Map.
Organization Date Alaskan Way Viaduct & Seawall Replacement Program 4 th Quarter 2009 Progress Report Meeting December 9, 2009.
Underground Stations Typical Station Site Plan. Underground Stations Ground Conditions: Key Issues.
September 26, East Side Access Status Report to CPOC September 26, 2011.
History and Cleanup at Chemical Commodities, Inc. Jeff Field US EPA Region 7 1.
PUBLIC MEETING November 19, 2003 Lower Manhattan Redevelopment D015183, PIN NYCD NYSDOT, REGION 11 Route 9A Project.
BCM 210 Foundation Issues- Fall 2000 refer to Allen Text
Sullivan Trail Junior High Pocono Summit, Pennsylvania Andrew Mellow Goals Background Drawings Site Plan Schedule April 13, 2005.
International Atomic Energy Agency Roles and responsibilities for development of disposal facilities Phil Metcalf Workshop on Strategy and Methodologies.
City of Winnipeg SOUTHWESTERN RAPID TRANSIT CORRIDOR Bidder Meeting October 16 th, 2009.
Palomar Medical Center West: Segmented Review Process.
HOOSIER HEARTLAND HIGHWAY SR25 Segment Four Cass County Public Information Meeting December 10, 2009 Design Consultant – United Consulting Engineers.
1 September 26, 2011 Recap The IEC was directed to report their confidence in the project’s mitigation proposed in June. In response, the IEC has evaluated.
SFOBB East Span Seismic Safety Project San Francisco-Oakland Bay Bridge East Span Seismic Safety Project March 12, 2002 Contractor Outreach.
The Tunnel Dismantling Machine (TDM)
CTA CAPITAL IMPROVEMENT PROGRAM. FY FY 2019 CIP Preliminary Marks.
COFFERDAMS.
PRE-PLANNING FOR CONSTRUCTION PROJECTS. OVERVIEW ASSESSING OWNER CAPABILITIES ANALYSIS OF RESOURCES REGULATORY REQUIREMENTS SITE DEVELOPMENT REVIEWING.
Understand foundation design and construction
 HDR, Ott Constructability, Dan Brown  Visit and boat tour of Rouchleau pit ◦ Access better than potrayed ◦ Challenging geotechnically 
 HDR, Ott Constructability, Dan Brown  Visit and boat tour of Rouchleau pit ◦ Access better than potrayed ◦ Challenging geotechnically 
Iron Range Tourism Bureau April 25, 2013 Hwy 53 Update.
PAC Meeting July 2, Agenda  Introductions and thanks  Project to date  Next steps  Questions.
USAID Afghanistan Engineering Support Program (ESP) Pre-Bid Meeting July 14, 2015.
PILING TECHNIQUES.
PORT OF TACOMA. Agreement Lincoln Avenue Grade Separation – Utility Relocation Request authorization for the Executive Director to Execute an Agreement.
The Challenge of Urban Rail Infrastructure The Design of William Street Underground Station Barry Moore 23 rd November 2005 AusRAIL PLUS 2005.
CROSSTOWN LRT Construction Liaison Committee June 14, 2017.
NHCA Education Series Contractor Pre-Qualification CSST
Eagle P3 Project Update RTD Board of Directors Sept. 2, 2014.
CT Reinforced Earth Structures
Key Issues CPOC Update February 2011 Second Avenue Subway TBM Drive #1
Cost Containment Working Group Board Update
Cost Containment Working Group Board Update
Construction Considerations
Presentation transcript:

East Side Access Outreach East Side Access Outreach - April '07 3/28/2017 East Side Access Outreach April 2007 MTA/LIRR East Side Access

East Side Access Outreach - April '07 3/28/2017 Doing Business with MTACC MTA/LIRR East Side Access

East Side Access Outreach - April '07 3/28/2017 MTACC is a Cooperative Owner / Project Partner MTA/LIRR East Side Access

East Side Access Outreach - April '07 3/28/2017 MTACC is Committed to: Pro-active Project Management Continual Improvement & Use of Best Practices Sensitivity to Construction Industry Concerns Overcoming Obstacles in a timely manner MTA/LIRR East Side Access

How MTACC Meets the Challenge: East Side Access Outreach - April '07 3/28/2017 How MTACC Meets the Challenge: Careful analysis of what’s going on in the industry Solid, accountable Program Management Reaching out and talking to contractors to address their issues – JUST LIKE TODAY! MTA/LIRR East Side Access

Focus on Project Management East Side Access Outreach - April '07 3/28/2017 Focus on Project Management Foster timely decision-making at all levels Increase staff training Conduct Constructability Reviews Building-in quality and safety programs Partnering Monitor budget and schedule Deal with utilities early and often MTA/LIRR East Side Access

Making Changes – Procurement Improvements East Side Access Outreach - April '07 3/28/2017 Making Changes – Procurement Improvements Flexibility in contract strategies and terms Introduce the use of early completion incentives Considering bi-monthly payments on special projects Use of escalation provisions if needed MTA/LIRR East Side Access

East Side Access Outreach - April '07 3/28/2017 Contract Issues Negotiation of ADR Provisions Timely Change Order Process Monitoring to Make Further Improvements Timely Progress Payment Processing Handling of Geotechnical Information Use of Geotechnical Interpretive Reports MTA/LIRR East Side Access

East Side Access Outreach - April '07 3/28/2017 Bottom Line We respect our consultants and contractors, and recognize the need to work as partners. Let’s continue to dialogue to further improve our business practices to meet all of our needs. We only succeed if we all succeed! MTA/LIRR East Side Access

Procurement Strategy - Negotiated Procurement Hybrid used at MTACC which combines the advantages of a fully designed project with the flexibility of a negotiated procurement RFP issued based on 100% design Negotiations permit owner and proposer to address specific project risks Translates into overall better project definition and cost savings

MTA Regional Commuter Rail System

Queens Construction

Scope Summary Schedule CQ031 Overview Four soft-ground bored tunnels, connecting Plaza Interlocking with the LIRR Mainline and the Mid-Day Storage Yard Three ventilation shafts Approach structures and retaining walls Schedule Contract Advertised 4th Quarter of 2007 Construction Starts 1st Quarter of 2008

Harold Interlocking and Sunnyside Yard Existing 63rd St Tunnel CQ028 Shaft Future LIRR Mid-Day Yard Harold Mainline Tracks Sunnyside Yard Yard Lead Tunnel Revenue Tunnels (A. B/C, D) Loop Tracks to Storage Yards

Elements of CQ031 Track B/C Track A TBM Launch Wall Cut & Cover (CQ028) 39th St TBM Honeywell St Sunnyside Yard Mid-Day Storage Yard Track D LIRR Lead Westbound Bypass

Major Construction Elements – CQ031 (1 of 2) Bored Tunnels (10,500 ft) 19’-6” ID, segmental liner Four Tunnels (A, B/C, D and Yard Lead) Ground Treatment for TBM launch, mixed face, cross passages Instrumentation Tunnel Trackwork and Tunnel Bench Ventilation & Emergency Exit Shafts + 2 fan power substations Three Tunnel Emergency Exit (A, B/C, Yard Lead) & Sewer Relocation Track D emergency Exit Yard Lead Emergency Exit Retaining Walls Westbound Bypass Retaining Wall Penn Lead Track Retaining Wall & C08 Substation Foundation

Major Construction Elements – CQ031 (2 of 2) Cut and Cover Approach Structures Yard Lead Approach Structure, S&I Access Road Relocation Closure of TBM reception pits A and D Demolition 43rd Street Private Properties Remaining elements of Amtrak Substation 1A Sunnyside Connector Track and Transformers at Honeywell St. Bridge Underpinning Honeywell Street Bridge Piers 4, 5 and 6 39th Street Bridge Pier 1S General Motors Access Bridge South Pier Existing 43rd Street Bridge Piers 1 through 4 and Sewer Relocation Harold Signal Tower

Bored Tunnels

Bored Tunnels

Bored Tunnels

Bored Tunnels

Bored Tunnels

Bored Tunnels

Bored Tunnels Two EPB or Slurry TBMs

Bored Tunnels - Pre-Cast Segmental Liners

Bored Tunnels - Section Through Launch Shaft: Rock/Soil Interface B/C D Yard Lead

Bored Tunnels - Ground Treatment Launch Shaft B/C Yard Lead

Bored Tunnels - Length of Tunneling Section Length Tunnel Track A Glacial Till 2,180 ft Track B/C 1,739 ft Track D Rock and Mixed Face 60 ft 2,158 ft 2,218 ft Yard Lead 515 ft 4,384 ft 3,869 ft 10,523 ft

Bored Tunnels - Instrumentation & Predicted Settlement Contours

Bored Tunnels - Settlement Monitoring and Limits East Side Access Outreach - April '07 3/28/2017 Bored Tunnels - Settlement Monitoring and Limits MTA/LIRR East Side Access

Manual and Automated Total Station Rail Monitoring Reflector

Tunnel Trackwork and Tunnel Bench - Trackwork Installation

Tunnel Trackwork – Booted Block System

Ventilation and Emergency Exit Shafts - Three Tunnels

Ventilation and Emergency Exit Shafts - Track D

Ventilation and Emergency Exit Shafts Track D Emergency Exit at Honeywell St. (Similar to Yard Lead Emergency Exit at 39th St.) Air Plenum Upper SA Room Steel Frame Fan Room Lower SA Room CL Lp1B CL Lp1A RC Wall CL Tr D Modular Retaining Wall Jet Grout Invert Plug

Ventilation and Emergency Exit Shafts Yard Lead Emergency Exit & Substation at 39th Street

Ventilation and Emergency Exit Shafts Yard Lead Emergency Exit and Substation at 39th Street Harold Access Bridge Emergency Exit Skillman Avenue 39th Street Bridge Substation

Retaining Walls - Westbound Bypass and PL Track Westbound Bypass Approach Structure (Rendering) Modular Retaining Wall Section for PL Track

Cut and Cover Approach - TBM Reception Pits - By Others Track A TBM Reception Pit (CH053) Track A Approach Structure (CH053) Track B/C Approach Structure (CH059) Track B/C TBM Eastern Limit Track D Approach Structure (CH054) Track D TBM Reception Pit (CH054) Harold Access Bridge (CH053)

CH054 – 48th St Main Line Bridge (Reloc. ML4 and Temp. ML2) Cut and Cover Approach Yard Lead Approach Structure Retaining Wall Retaining Wall Mainline Bridges at 43rd Street (CH053) Retaining Wall Retaining Wall CH054 – 48th St Main Line Bridge (Reloc. ML4 and Temp. ML2) GM Access Bridge

Cut and Cover Approach - Typical Approach Structure

Demolition - Private Properties on 43rd Street

Traction Power Substation C08 at 43rd Street Traction Power Substation C08 – Foundations Only Yard Lead Tunnel Approach Structure

Underpinning - Protection of Honeywell St. Bridge

Underpinning - Protection of GM Access Bridge (jet grout columns)

Underpinning - Yard Lead Tunnel - 43rd St Bridge Pier Modification Temp. Steel Road Plate Relocated DEP Sewer Yard Lead Mini Piles Mini Piles

Working Arrangements with Railroads Railroad Interfaces Working Arrangements with Railroads Flagging Support and Force Account Support Working within Harold Interlocking and Sunnyside Yard TBM Removal next to Harold Mainline and Catenary

Main Staging Area 500 ft

Key Elements (1 of 2) Contract Construction Interfaces New Technology Predecessor Contracts: CQ028, CH053 Interfaces in Harold Interlocking and Yard A with Concurrent Contracts: CH054, CM009, CM012, CM019, Force Account. Successor Contracts: CQ032, CH057, CS079 Additional Design Interfaces with: CH059, CS081 New Technology Pressurized Face TBMs Precast Booted -Block Trackwork System.

Key Elements (2 of 2) Means and Methods Generally shown as ‘Suggested Method’ with permissible alternatives detailed in the specifications: TBM: Pressurized Face (Slurry or EPB) Liner: Reinforcement designed by GEC consultant. Contractor can propose modifications to details such as left/right rings, taper, segment shape and dowels Ground Treatment: Jet grout or ground freezing feasible Ground Support for Vent Shafts: slurry walls or secant piles feasible Temporary Support for Yard Lead Approach Structure: Jet grout plus soldier pile and lagging suggested, slurry walls and tremie plug acceptable Temporary Support for Westbound Bypass. Suggested as Soldier Pile and lagging with rakers or tie-backs Underpinning: Various methods suggested (one per pier location) Instrumentation and Monitoring Mixed Face, Boulders and Shallow Tunneling

ESA Project – General Description OUT

OUT Queens Packaging Plan Harold Stage 1 Harold Stage 2 Harold Stage 3   2007 2008 2009 2010 2011 2012 2013 Harold Stage 1 28 Months Harold Stage 2 20 Months Harold Stage 3 16 Months 18 Months Harold Stage 4

Amtrak Buildings To Be Demolished OUT Amtrak Building 3

Ventilation Shafts and Emergency exits OUT

Emergency Exit Shaft Construction OUT Slurry Wall Rig

East Side Access Outreach - April '07 3/28/2017 OUT Contract CQ031 Key Contractor Issues MTA/LIRR East Side Access

Tunneling Issues Differing Site Conditions (mixed face, boulders, contaminated ground, buried obstructions), Geotechnical Interpretive Report Settlement and Sinkholes (Sunnyside Yard, Harold Mainline, Harold Signal Tower, Bridge Piers, 43rd Street, Loop Track Retaining Wall) Instrumentation Monitoring by MTA Responsibility for Direct and Indirect Damages Mixed Face, Boulders and Shallow Tunneling OUT

Draft Schedule Summary Sept 2007 to Feb 2011 (41 months, approx.) 2007 2008 2009 2010 J F M A S O N D   1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 OUT

East Side Access Outreach - April '07 3/28/2017 We’re sensitive to your problems:  Rising Construction Costs – So we’ll look at the need for material escalation provisions  Increasing volume of work in both the private and public sectors – So we look at phasing our jobs  Stress on labor resources - We monitor availability of labor and package jobs to maximize use of resources MTA/LIRR East Side Access