FBAG Flood Risk Assessment and Mapping. Purpose Review role of FBAG sub-group Summarise research/project agenda.

Slides:



Advertisements
Similar presentations
Employability and Employer Engagement
Advertisements

Armand Racine Consultant Chemicals Branch
PROJECT MANAGEMENT & BUSINESS PLANNING PROCESS
Delivering New Development Plans
Statutory Drivers for Adaptation Explaining and reinforcing the statutory duties on Local Planning Authorities to address climate change adaptation in.
Local Support for Council Tax The Consultation Document.
Infrastructure Planning Commission Workshop 2b Working with the IPC: Guidance and issues for promoters.
Strategic Environmental Assessment of Scotland’s Climate Change Adaptation Framework Strategic Environmental Assessment of Scotland’s.
Informatics priorities and strategy Chris Carrigan Deputy to the PHE Chief Knowledge Officer, Information Services.
Communities First Mike Durke. Key Lessons 2002: Early days 2003: Deputy Minister Review 2006: Interim Evaluation 2008: ‘Communities Next’ 2009: Wales.
Department of Tourism Department of Tourism NTSS DRAFT REVIEW FRAMEWORK NTSF MEETING 17 SEPTEMBER 2014.
Vision Strategic Aims DMT Priorities Care Group/Directorate Service Plans Team Delivery Plans Individual Performance Plans Performance and Budget Management.
Points of interest Royal assent on 4 th Aug 2009 Seen as.... “historic” “groundbreaking” “setting an international example” Overall Aim To reduce Scotland’s.
A vision for a new national youth work strategy for Wales I want Youth Services to reach out to all young people and.
NACI’s Medium-Term Policy Programme Presentation by Prof Cheryl de La Rey Chairperson National Advisory Council on Innovation Date: 10 February
Transforming lives through learning Note for deliverers Please amend this presentation to suit your audience and local circumstances – you will not need.
Australia’s Experience in Utilising Performance Information in Budget and Management Processes Mathew Fox Assistant Secretary, Budget Coordination Branch.
Local climate change adaptation responses and social justice Jean Welstead 13/9/12.
Preparing Scotland’s first Records Management Plan Ava Wieclawska Records Manager.
Common recommendations and next steps for improving local delivery of climate finance Bangkok, October 31, 2012.
National Standards for Safer Better Healthcare
SNH PERSPECTIVE ON PLANNING AND THE ENVIRONMENT Derek Manson Planning Adviser.
The Future of Adult Social Care John Crook March 2011.
1 Burns Beach near Brighton, Western Australia RPS has won a series of awards from the Urban Development Institute of Australia - including the Water Sensitive.
IAEA International Atomic Energy Agency Reviewing Management System and the Interface with Nuclear Security (IRRS Modules 4 and 12) BASIC IRRS TRAINING.
Certificate IV in Project Management Introduction to Project Management Course Number Qualification Code BSB41507.
Quality Assurance. Identified Benefits that the Core Skills Programme is expected to Deliver 1.Increased efficiency in the delivery of Core Skills Training.
Environment (Wales) Bill Legislation to sustainably manage Wales’ resources.
Current condition and Challenges for the Future Report s (Scotland and Solway Tweed)
EUROCHILD Members Exchange Seminar 2007 Promoting Children’s Rights through Positive Parenting Policies FAMILIES MATTER: SUPPORTING FAMILIES IN NORTHERN.
JOINING UP GOVERNMENTS EUROPEAN COMMISSION Establishing a European Union Location Framework.
FLOOD RISK MANAGEMENT The next steps. The National Technical Advisory Group On Flooding Issues An Overview and the Future.
UK Environmental Observation Framework.
Supporting the Outcomes-based Approach Presentation – Public Bodies Workshops Summer 2009 Performance Division.
Health and Wellbeing: JSNA, Strategy, Outcomes Chris Kenny Director of Public Health.
Water Framework Directive and the SRDP Jannette MacDonald Land Unit, SEPA.
SNIFFER’S ROLE IN FLOOD RISK MANAGEMENT Fiona Mactaggart Research Manager.
Working with Communities to Minimise Flood Risk Chris Murray Head of Strategic Planning.
Local authority workshop Flood Risk Management (Scotland) Bill.
Civil Contingencies Act Enhancement Programme (CCAEP) Civil Contingencies Secretariat March 2010.
River Basin Management Planning Cath Preston Senior Planning Officer (River Basin Planning) 2 nd March 2006.
Flood and Water Management In Scotland Dr Rebecca Wade, UWTC, University of Abertay
Flood Risk Assessment Group Stage 2 amendments. Mapping watercourses- new duty on LA’s Map features contributing to managing flood risk- New duty SEPA.
Future needs for capacity building and recommendations to the OIE Dr Sarah Kahn Consultant to the OIE
STARFLOODS: Flood Management in Scotland – preventive approaches Dr Sarah Hendry.
FBAG- Catchment Planning Floods Directive and Flooding Bill Flood Risk Management Planning.
Insert name of presentation on Master Slide National Health Improvement Review Helen Howson - Consultant in Public Health/ Director of Strategic Programmes.
Tools for Mainstreaming Disaster Risk Reduction: Guidance Notes for Development Organisations Charlotte Benson and John Twigg Presented by Margaret Arnold.
The EU Floods directive -Implementation in Sweden.
TRAP 5 th interregional meeting & Site Visits Limerick & Lough Derg, Ireland 9 th October 2013 CP3 GP6 Regional Planning Guidelines PP3 – Mid-West Regional.
Chief Fire Officers Association RDS Working Group Rod Hammerton South Wales Fire and Rescue Service Regional Representative for Wales Title.
AGRO PARKS “The Policy Cycle” Alex Page Baku November 2014.
Trade Union Training on the Validation of the training manual entitled “Union Training on Occupational Safety and Health” OCCUPATIONAL SAFETY & HEALTH:
INTEGRATION BASIC FACTS Jaqui Reid, Programme Director Third Sector Health & Social Care Support Team “Our vision is for a Scotland where people who.
Embedding the golden threads that lead to quality care every time……
Community Planning in Scotland
Sustainable Procurement Duty
River Basin Management Planning
Local Government Climate Change Support Program 2016
Statistics Governance and Quality Assurance: the Experience of FAO
River Basin Planning & Flood Risk Management in Scotland
Preparing a River Basin Management Plan WFD Characterisation Manager
Portfolio, Programme and Project
EU Marine Strategy DG Environment B.1.
Jon Rathjen SEA Bill Team Leader Scottish Executive
Building Capacity for Quality Improvement A National Approach
Scottish Government Responsible for environment & flooding issues
Preliminary Flood Risk Assessment
Outcomes of Working Group 1
Innovative WASH Management Models for the Urban Poor in Ghana
Presentation transcript:

FBAG Flood Risk Assessment and Mapping

Purpose Review role of FBAG sub-group Summarise research/project agenda

Role of FBAG sub-group Need to gear up to deliver PFRAs Need to begin investigating and addressing operational implementation issues Need to coordinate RnD to support implementation of legislation We propose to strengthen the role and remit of this FBAG group to fulfil these requirements

Strengthening this group The group should refocus from the singular purpose of Bill advice to providing operational guidance on flood risk assessments The group should be responsible for coordinating research projects to fulfil such guidance in the area of flood risk assessment. The group should report to and Operational Guidance Group/board.

Flooding Bill Advisory Group Catchment Planning Group* 1961 Act and statutory process group Operational Guidance Group FRAM Group* Other groups to be considered

Changes to remit of group In short term, FRAM Group would fulfil dual roles- advising on the Flooding Bill and advising on operational requirements. As implementation progresses, the group would focus on supporting the development of operational tools and procedures Membership of the group would be aligned to meeting these requirements

Research programme

We propose to establish a research programme to support implementation of the Flooding Bill. The broad aim of this research programme is to: Deliver tools, information and guidance to ensure the competent and responsible authorities can meet their responsibilities under the Floods Bill.

Research programme The research programme must: Support collaborative working between all bodies involved in implementation Ensure that all work is taken forward in an integrated fashion Minimise administrative and management burdens Minimise creation of new groups Ensure full coordination between contractor based projects and work undertaken internally by the organisations involved in implementation.

Flooding Bill Advisory Group Catchment Planning Group* 1961 Act and statutory process group Operational Guidance Group FRAM Group* Other groups to be considered

Research themes Theme 1 - Datasets and tools to support risk assessment Theme 2 - Flood Risk Management Planning Theme 3 - Natural Flood Management demonstration work

Theme 1 Aim To generate tools, information and data to help Scottish organisations meet their responsibilities for assessing and characterising flood risk. Outcomes Determine gaps in data and tools Assess costs and provide recommendations for addressing these gaps Assess and provide recommendations for improving data exchange and dissemination

Priority projects/work areas Project 1 – Gap analysis and trialling- Preliminary Flood Risk Assessments Project 2- Options appraisal- Sewer and pluvial flood risk assessments Project 3 Assessment of mechanisms for data exchange and dissemination Project 4 Gap analysis and trialling- Flood Risk and Hazard Maps

Bill Provisions

PFRA- General provisions Approval by Scottish Ministers SEPA to have duty to produce PRFA SEPA to assess significant flood risk LAs to prioritise local efforts Duty to collaborate- responsible authorities Powers to obtain information Not limited to assessment to existing information Opportunity for consultation

Content of PFRA Identify areas at significant flood risk and assess the potential adverse consequences for: human health, the environment, Cultural heritage, economic activity, Strategic infrastructure

Proposed roles and responsibilities for flood management in Scotland Flood risk assessment SEPA would fulfil the role of flood risk assessment authority; this would include a duty to assess and map flood risks and identify areas at significant flood risk. Responsible authorities would have a duty to collaborate in the production of risk assessments. This would include sharing and reviewing data and information. Strategic and catchment planning SEPA would fulfil the role of strategic flood planning authority; this would include a duty to produce Area Flood Risk Management Plans that set out the strategic framework for flood risk management in Scotland. Local Authorities would fulfil the role of local catchment planning authority; this would include a duty to prepare catchment focused Local Flood Risk Management Plans that coordinate delivery of measures to address flood risk. Responsible authorities would have a duty to collaborate in the production of these plans. This would include contributing through advisory groups. General responsibilities

Implementation of measures to manage flood risks FLOOD ALLEVIATION (e.g. flood defences and natural flood management) Local Authorities would have primary responsibility for flood alleviation and would be responsible for coordinating and implementing flood alleviation measures, including natural flood management measures). Scottish Water (in collaboration with Local Authorities) would be responsible for implementing measures associated with urban drainage infrastructure. All measures would be coordinated through Local Flood Management plans. Forestry commission would be responsible for bringing forward measures associated with forestry management. All measures would be coordinated through Local Flood Management plans. FLOOD AWARENESS AND AVOIDANCE SEPA would fulfil the role of flood warning authority; in fulfilling this role, SEPA would have a duty to provide flood warning services to those areas of Scotland at significant flood risk. Local Authorities (and statutory consultees) would use development control to ensure that flood risks are minimised for new developments. Responsible authorities would exercise their duties to support implementation of measures to reduce flood risk. Responses to flooding Responses to flooding would continue to be coordinated through the framework established under the civil contingencies act.

Area Flood Risk Management Plans would set the strategic framework for flood risk management in Scotland. These plans would coordinate flood management objectives and set the framework in which measures are delivered or planned for at a local level. The Competent Authority will be responsible for producing these plans. Local Flood Risk Management Plans would translate the objectives set out in Area Flood Management Plans into specific measures or combinations of measures to address flood risk. Where necessary, supplemental plans may be required to coordinate deliver of measures, these could include Integrated Urban Drainage Plans or Forestry Plans. It is proposed that Local Authorities would be responsible for producing these plans. Area Flood Risk Management Plan Local Flood Risk Management Plan Integrated Urban Drainage Plan Management units