Outcome of the EU Nuclear Safety Stress Tests Andrej Stritar Chairman, ENSREG.

Slides:



Advertisements
Similar presentations
Parliamentary Portfolio Committee Presentation Annual Report 2012.
Advertisements

ENEF WG Risks / Bernard Fourest 12 September 2012 PRAGUEBRATISLAVA ENEF WG RISKS Current activities of the SWG Nuclear Installation Safety Bernard Fourest.
Energy Proposal for a Council Directive amending Directive 2009/71/EURATOM establishing a Community framework for the nuclear safety of nuclear installations.
WGOE Meeting – 29/31 May 2006 Sub-directorate for power reactors DGSNR – SD2 - 1 Organisation of the operating experience and incident.
Presented by: Muhammad Ayub Pakistan Nuclear Regulatory Authority Safety Enhancement at Nuclear Power Plants in Pakistan Prospects of Nuclear Energy in.
Vermont Yankee Presentation to VSNAP 7/17/13 VY/Entergy Fukushima Response Update Bernard Buteau.
IAEA International Atomic Energy Agency. IAEA Outline Learning objectives Introduction Functions of Regulatory Body (RB) on EPR Appraisal guidance: Part.
ANS RESPONSE TO FUKUSHIMA LESSONS LEARNED Presented to: NESCC November 29, 2012 Washington D.C. Donald J. Spellman, Chair ANS Standards Board American.
LFR plant assessment against a Fukushima-like scenario Technical Workshop to Review Safety and Design Aspects of European LFR Demonstrator (ALFRED), European.
US NRC Protective Action Recommendation Study National Radiological Emergency Preparedness Conference April 10, 2008 Las Vegas, NV Randy Sullivan, CHP.
MODULE “PROJECT MANAGEMENT AND CONTROL” EMERGENCY PLANNING SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo.
INSAG DEVELOPMENT OF A DOCUMENT ON HIGH LEVEL SAFETY RECOMMENDATIONS FOR NUCLEAR POWER Milestone Issues: Group C. Nuclear Safety. A. Alonso (INSAG Member)
IAEA International Atomic Energy Agency Lessons Learned from the Tailored IRRS Module on Regulatory Implications of the Fukushima Accident Presentation.
1 Regulatory Challenges During and Following a Major Safety or Security Event Muhammad Iqbal Pakistan Nuclear Regulatory Authority Presentation at General.
EVALUATION AND QUALITY ASSURANCE STRATEGY PRESENTED BY DR SHYAM PATIAR.
SÄTEILYTURVAKESKUS STRÅLSÄKERHETSCENTRALEN RADIATION AND NUCLEAR SAFETY AUTHORITY Protection of the environment from ionising radiation - views of a regulator.
IAEA International Atomic Energy Agency How do you know how far you have got? How much you still have to do? Are we nearly there yet? What – Who – When.
SMS Operation.  Internal safety (SMS) audits are used to ensure that the structure of an SMS is sound.  It is also a formal process to ensure continuous.
NEXT Lessons Learned from Integrated Regulatory Review Service (IRRS) 22 nd and 23 rd January 2014, Brussels Fernando Franco, Spanish Nuclear.
IAEA International Atomic Energy Agency Reviewing Management System and the Interface with Nuclear Security (IRRS Modules 4 and 12) BASIC IRRS TRAINING.
What about Japan?. Unit 1 Unit 2 Unit 3 Unit 4 Unit 5 Unit 6.
IAEA - Department of Nuclear Safety & Security
Energy Nuclear stress tests and follow up in Europe Brussels, 25 May 2012 Nina Commeau Adviser to the Deputy Director-General in charge of nuclear energy.
Energy Forum 2011, Changing the Energy Paradigm and Outlook for South-Eastern EU Energy Forum 2011 Nuclear Safety Regulation in Romania Recent Developments.
1 CAA Offshore Helicopter Review Mark Swan Group Director, Safety and Airspace Regulation.
School for drafting regulations Nuclear Safety Operation Vienna, 26 November -7 December 2012 Tea Bilic Zabric.
Improve nuclear safety and reduce environmental impact – international and national practice Roundtable “Environmental Safety: Scientific and Technical.
School for Drafting Regulations on Radiation Safety Vienna, November 2012 EU Requirements Jiří Veselý, SONS, Czech republic.
Report about activities of ENSREG Andrej Stritar Chairman of ENSREG Director of the Slovenian Nuclear Safety Administration 12. October 2009.
Fukushima Daiichi Nuclear Plant Event Summary and FPL/DAEC Actions.
IAEA International Atomic Energy Agency. IAEA Outline Learning Objectives Introduction IRRS review of regulations and guides Relevant safety standards.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.5/1 Design Geoff Vaughan University of Central Lancashire,
Safety Management in Europe European Organisation for the Safety of Air Navigation Dr. Erik Merckx EUROCONTROL Directorate ATM Programmes Head of Business.
REPUBLIC OF SLOVENIA MINISTRY OF AGRICULTURE AND THE ENVIRONMENT SLOVENIAN NUCLEAR SAFETY ADMINISTRATION IRRS, the driving force for continuous improvements,
Fukushima Lessons Learnt and Follow-up Activities of Rostechnadzor Alexey Ferapontov, Acting Chairman Second European Nuclear Safety Conference
1 st Workshop on issues and trends arising from the European IRRS missions Findings and Conclusions A.Munuera Brussels, 22 nd and 23 rd January 2014.
Summary of Session 3 Post-Fukushima Operational Safety Improvements 1 Fred Dermarkar IAEA International Conference on Operational Safety Vienna International.
Organization of the peer review process of stress tests in the European context “stress tests of NPP Dukovany and NPP Temelín - evaluation of safety and.
Parliamentary Portfolio Committee Presentation Annual Report 2012.
IAEA International Atomic Energy Agency Methodology and Responsibilities for Periodic Safety Review for Research Reactors William Kennedy Research Reactor.
IAEA International Atomic Energy Agency. IAEA Outline LEARNING OBJECTIVES REVIEW TEAM AMD COUNTERPARTS Team Composition Qualification PREPARATORY PHASE.
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Workshop Information IAEA Workshop Defence in Depth Safety Culture Lecturer.
Milestones for Nuclear Power Infrastructure Development Establishment of A Regulatory Framework Gustavo Caruso, Section Head, Regulatory Activities Section.
Contract: EIE/07/069/SI Duration: October 2007 – March 2010Version: July 7, 2009 Calculation of the integrated energy performance of buildings.
MEHB 513 Introduction on nuclear technology assignment GROUP MEMBERS:ID: SEEH CHONG CHIN ME YEE QIAN WAHME TING DING PINGME LIM JIA YINGME
By Annick Carnino (former Director of IAEA Division of Nuclear Installations Safety) PIME, February , 2012.
Energy Meeting with the NGOs Taipei, 25 September 2013 Christian Kirchsteiger European Commission, Directorate-General for Energy (DG ENER) EU Policy Context.
Harmonised use of accreditation for assessing the competence of various Conformity Assessment Bodies Dr Andreas Steinhorst, EA ERA workshop 13 April 2016,
IAEA TSO-Conference, April 2007, Aix en Provence 1 Independent technical and scientific advice for regulatory decision making L. Hahn, GRS International.
1.9. Safety assessment “School for Drafting Regulations on Radiation Safety, IAEA - Module 1 Regulatory framework for safety, authorization and inspection.
Post-Fukushima Severe Accident Management Update Kim, Hyeong Taek KHNP- Central Research Institute July KINS Safety Analysis Symposium.
DEVELOPMENT AND MAINTENANCE OF THE TECHNICAL AND SCIENTIFIC KNOWLEDGE BASE NECESSARY FOR TSO.
FLEX Mitigation Strategies Overview (Rec 4.2) Fukushima Regulatory Response Workshop April 5, 2012.
Japanese Nuclear Accident And U.S. Response April 20, 2011.
BASIC PROFESSIONAL TRAINING COURSE Module IX Siting considerations and Environmental Impact Assessment Case Studies Version 1.0, May 2015.
THAILAND Training and Tutoring Feedback
STRESS TESTS and TAIWAN PEER REVIEW PROCESS
THE ROLE OF TSOs IN THE NATIONAL SAFETY ORGANIZATION
Vesa Tanner European Commission Directorate-General Energy
Brazil - Training and Tutoring Feedback Second Coordination Meeting
Safety Management in Europe
Flooding Walkdown Guidance
ETSON: its role and activities for harmonizing safety assessment practices Benoît De Boeck, ETSON President Presented by Pieter De Gelder (Bel V) CN-251.
The Revision of WENRA Reference Levels and their Implementation
Complementarity of deterministic and probabilistic approaches
WENRA Current activities of WENRA 4th GNSSN Steering Committee Meeting
Armenia Training and Tutoring Feedback
Presentation to the EPREV Lessons Learned Workshop
Japanese Nuclear Accident And U.S. Response
Safety Standards Committee meetings 24th TRANSSC meeting Agenda item 3
Presentation transcript:

Outcome of the EU Nuclear Safety Stress Tests Andrej Stritar Chairman, ENSREG

ENSREG – who are we?

European Scene In European Union … … there are almost 150 power reactors… …in 15 EU member countries, producing ~1/3 of all electricity in EU We must keep them operating safe!

Before 2000 Country 1 Operator Rules Regulator Country 2 Operator Rules Regulator Country 3 Operator Rules Regulator … E. Commission DGTREN Nuclear Safety was only national responsibility

WENRA, a voluntary club “Bottom up” approach to harmonisation E. Commission DGTREN WENRA – nuclear regulators Regulator Country 1 Operator Rules Regulator Country 2 Operator Rules Regulator Country 3 Operator Rules Regulator …

ENSREG – after 2007 “Top down” advisory body ENSREG – 27 EU regulators + EC Country 1 Operator Rules Regulator Country 2 Operator Rules Regulator Country 3 Operator Rules Regulator … E. Commission DGTREN E. Commission DGTREN Regulator

What is now better? ENSREG – 27 EU regulators + EC Country 1 Operator Rules Regulator Country 2 Operator Rules Regulator Country 3 Operator Rules Regulator … E. Commission DGTREN WENRA – nuclear regulators WENRA Reference Levels Nuclear Safety Directive, RW Directive, Stress Tests

Nightmare of 11 March 2011

Beneficial conversion of mass to energy turned into a disaster

The feedback loop for assuring perfection has failed! Trust of the society was lost! Regulators Operators Media DOUBT CONFIDENCE PERFECTION G Public ELECTRICITY TRUST DOUBT

Stress Tests were about restoring confidence and regaining trust by further improving nuclear safety

Why Fukushima has happened? Tsunami is a very rare natural disaster. It was underestimated during the design, there was not enough knowledge about it. Safety margins were too small. Uncertainty of our understanding of natural phenomena should have been compensated by bigger conservatism – higher protective dikes!

Fukushima concerns The main lessons learned from Fukushima were actually the main objectives of our Stress Tests: Did we properly take into account uncertainties of all potential external hazards? Are our plants robust enough, are safety margins big enough? Are we able to cope even with extremely low probability events?

EU response to Fukushima

Stress Tests 11 March: Fukushima accident occurs 24 – 25 March: European Council Requests –Stress tests to be developed by European Nuclear Safety Regulators Group (ENSREG), the Commission and WENRA –Safety of all EU plants should be reviewed –Scope of review developed in light of lessons learned from Japan –Assessments conducted by national Authorities –Assessments completed by a peer review

Development of Stress Test Methodology Methodology drafted by WENRA in April Agreed to by ENSREG in May On 25 May 2011 ENSREG including the European Commission published the ENSREG declaration that described EU Stress Tests methodology

Stress Test Implementation Operators submitted progress reports National progress reports submitted Operators submitted final reports EU Council informed about progress Final National reports submitted

The Peer Review Process

The process WENRA prepared first draft in June Task Force formed in July Involvement of stakeholders Number of meetings and discussions The Methodology endorsed by ENSREG on 12 October

The process The Peer Review Board Three topical reviews in parallel, January and February 2012 –Initiating Events –Loss of Safety Functions –Severe Accident Management 17 country visits in 6 parallel groups, March 2012 About 80 experts involved ENSREG Report + 17 Country Reports

Milestones EU Council expected the final report in June 2012 EC needed the report from ENSREG by end of April Peer Review started on 1 January Majority of work was done in February/March The report was finalised in April

Main Results of the Peer Review

General conclusion over Europe Significant steps taken in all countries to improve safety of plants Varying degrees of practical implementation –Regulatory systems –Extent of programs

Consistency of approaches in European countries Global consistency over Europe in identification of: –Strong features –Weaknesses –Measures to increase robustness

Measures to increase robustness of plants Significant measures to increase robustness already decided or considered, such as: –Additional mobile equipment –Hardened fixed equipment –Improved severe accident management with appropriate staff training Details available in Country Reports and Main Report

Example: New equipment in Krško NPP Pumps Portable fire system Additional connection points Portable external diesel generators

Assessment of natural hazards and margins Recommendation no.1: – WENRA, involving the best available expertise from Europe, should develop guidance on natural hazards assessments, including earthquake, flooding and extreme weather conditions, as well as corresponding guidance on the assessment of margins beyond the design basis and cliff-edge effects.

Periodic safety review Peer review demonstrated efficiency of periodic safety reviews –Maintain and improve safety and robustness of plants –Specially relevant, in the context of the peer review, for protection of installations against external hazards

Periodic safety review Recommendation no. 2: –ENSREG should underline the importance of periodic safety review. In particular, ENSREG should highlight the necessity to re-evaluate natural hazards and relevant plant provisions as often as appropriate, but at least every 10 years.

Containment integrity Fukushima disaster highlighted once again the importance of the containment function Last barrier to protect people and the environment against radioactive releases Issue already considered as follow-up of previous accidents and possible improvement already identified

Containment integrity Recommendation no. 3: –National regulators should consider urgent implementation of the recognized measures to prevent containment integrity.

Containment integrity Measures vary depending upon the design of the plants For water cooled reactor, they include equipment, procedure and accident management guidelines to: –Depressurize primary circuit to prevent high pressure core melt –Prevent hydrogen explosions –Prevent containment overpressure

Prevention of accidents resulting from natural hazards and limiting their consequences Preliminary lessons learned from Fukushima: Necessary increase of defense in depth to take into account severe accidents resulting from extreme natural hazards exceeding design basis or current safety requirements applicable to plants

Prevention of accidents resulting from natural hazards and limiting their consequences Such situation can result in: –Devastation and isolation of site –Event of long duration –Unavailability of numerous safety systems –Simultaneous accidents in several plants, including their spent fuel pools –Radioactive releases

Prevention of accidents resulting from natural hazards and limiting their consequences Recommendation no. 4: –National regulators should consider necessary implementation of measures allowing prevention of accidents and limitation of their consequences in case of extreme natural hazards

Prevention of accidents resulting from natural hazards and limiting their consequences Typical measures: –Bunkered equipment including instrumentation and communication means –Mobile equipment protected against extreme natural hazards –Emergency response centers protected against extreme natural hazards and radioactive releases –Rescue teams and equipment rapidly available to support local operators

Follow-up Most actions are being prepared and implemented by operators and national regulators Special Task Force is preparing EU action plan to be endorsed by ENSREG on 3 July

What is still missing? The Security Track of EU Stress Tests was conducted in parallel. During the year the issue of off-site emergency preparedness has proven to deserve even more attention. Long term ENSREG action plan is being prepared.

Global Impact EU Stress Tests became a global model Directly used in some countries (Japan, UAE, South Africa, Russia) Important reference for all the others, including IAEA

What next? Stress Test campaign is over! All lessons learned and actions to be done will be included in our normal working processes. Majority has to be done by operators and national regulators. Common technical issues will be dealt by WENRA. ENSREG’s special Task Force is preparing our action plan. Additional plant visits will be organised after proper objectives are defined.

Proper focus Stress Tests were about the –design of plants and –mitigation of accidents. Equally or more important is –operational safety. The focus of operators and regulators must be properly balanced between these three cornerstones of nuclear safety!