1 Getting to the Fiber: Lateral Builds Presented by Stephen Kankus, NYSERNet Quilt Regional Optical Networking Workshop June 22, 2004.

Slides:



Advertisements
Similar presentations
Special Inspections
Advertisements

AT&T strives to provide a smooth and successful installation experience for our Customers. We will do all that we can to install your service on time and.
Chapter 4 Computer Networks
Confidential and proprietary materials for authorized Verizon personnel and outside agencies only. Use, disclosure or distribution of this material is.
MAN Design Last Update Copyright Kenneth M. Chipps PhD 1.
TurnKey Project Management Services Capabilities Briefing.
Rural Broadband, LLC Henry County Fiber Network Initiative Rural Broadband, LLC 15 Lake Street, Suite 270 Savannah, GA Contact: Allen Davis
Connecticut Education Network February 4, 2004 Statenets CEN Project Update Robert P. Vietzke, Network Architect & Program Director.
Relocation of the Operations Control Center Oil Movements May 4, 2007 For RCAC Board Meeting.
Business Data Communications, by Allen Dooley, (c) 2005 Pearson Prentice HallChapter Six 1 Business Data Communications Chapter Six Backbone and Metropolitan.
Rob Vietzke Connecticut Education Network University of Connecticut NEREN Quilt RON Meeting RFP Examples June 22, 2004.
FiberCo/WaveCo Update Joint Techs February 12, 2007 Minneapolis, Minnesota.
NPTF Wireless Discussion. 3/3/20032 Agenda Goals Strategy Current status Future plans Challenges Options.
Business Data Communications Chapter Six Backbone and Metropolitan Area Network Fundamentals.
Confidential and proprietary materials for authorized Verizon personnel and outside agencies only. Use, disclosure or distribution of this material is.
1 NYSERNet Thoughts on The Next Big Thing Tim Lance April 24, 2012.
OARnet Update Linda Roos Gathering of State Networks February 4, 2004.
Palm Coast’s Municipal Fiber-Optic Network: Project Update
© 2007 Cisco Systems, Inc. All rights reserved.Cisco Public ITE PC v4.0 Chapter 1 1 The Internet and Its Uses Working at a Small-to-Medium Business or.
Chapter 4: Computer Networks Department of Computer Science Foundation Year Program Umm Alqura University, Makkah Computer Skills /1436.
© 2007 Cisco Systems, Inc. All rights reserved.Cisco Public ITE PC v4.0 Chapter 1 1 The Internet and Its Uses Working at a Small-to-Medium Business or.
Internet Policy Day 1 - Workshop Session No. 2 Market structure Prepared for CTO by Link Centre, Witwatersrand University, South Africa.
© New York Independent System Operator, Inc. All Rights Reserved. Michael Swider Manager – Research & Development New York Independent System.
City of Idaho Falls Fiber Optic Network Jackie Flowers General Manager Mark Reed Fiber Optic Project Manager Monday, July 30, 2007  Community & ED Conference.
OSC (Ohio Supercomputer Center) 1224 Kinnear Road, Columbus, OH (614) www.osc.edu THIRD FRONTIER OVERVIEW OPLIN MEETING April.
1 The NYSERNet- Public Television Partnership Ken Devine, Thirteen –WNET, NYC Tim Lance, NYSERNet and University at Albany Internet2 Member Meeting - September.
1 NYSERNet New York’s Networking Future Internet2 K-20 Advisory Committee Meeting SEGP Update April 27, 2009.
“Broadband Projects for Greece” CHRISTOS MOSCHONAS Telecom Projects Director Information Society S.A. “Speeding up NGN ubiquity : a pillar for digital.
Hospital Facility Managers Association of Delaware Valley.
1 W. Owen – ISECON 2003 – San Diego Designing Labs for Network Courses William Owen Michael Black School of Computer & Information Sciences University.
Policy Committee Meeting Fiscal Year 2004 Budget Considerations: Dark Fiber November 13, 2002.
9/3/2002NYMAN'02 1 NYSERNet New York City Dark Fiber Network
The Future of Sludge Disposal: A Fresh Perspective after Sandy Jim Meehan – Executive Director Rahway Valley Sewerage Authority.
Quilt Regional Optical Networking Workshop, June Michigan LambdaRail (MiLR) Fiber RFP Process W. Scott Gerstenberger External Networking Manager.
The Public Network Chapter 4. Objectives In this chapter, you will learn to: Explain, in general terms, the structure of the public telephone network.
1 NYSERNet Updates and the Next Generation Network Joint Techs Meeting Salt Lake City, Feb 2005 Bill Owens.
Building and Maintaining Regional Optical Networks Gregg Shepperd Principle Services Product Manager, Fujitsu Internet2 Spring Conference April 25, 2007.
Common Business Models 9/28/2006 What is Your Business? Common Business Models Among RON’s and GigaPoP’s.
Intro to Network Design
Quilt Regional Optical Networking Workshop, June Michigan LambdaRail (MiLR) Optical Networking Project W. Scott Gerstenberger External Networking.
Quilt Optical Fiber Workshop Boulder Research and Administrative Network (BRAN) Experiences/Lessons Learned By Jim Van Dyke.
PLANNING ENGINEERING AND PROJECT MANAGEMENT By Lec. Junaid Arshad 1 Lecture#03 DEPARTMENT OF ENGINEERING MANAGEMENT.
1 Implementation Issues Presented by Stephen Kankus, NYSERNet Quilt Regional Optical Networking Workshop June 22, 2004.
Illinois Century Network Illinois Broadband Opportunity Partnership – East Central Project.
California’s Proposed DR Cost-Effectiveness Framework January 30, 2008.
RENU Design Overview October Acknowledgement 2 The bulk of information contained in this presentation is the result of a design session in Seattle.
I-Light Network Caroline Weilhamer Manager of Services and Support June 28, 2012.
Contractor Alternate Design Serving the Public’s Best Interest.
Utility Engineers, PC.  Generation  Transmission  Distribution.
Networking Topology 1.BUS Topology 2.RING Topology 3.STAR Topology
© 2007 Cisco Systems, Inc. All rights reserved.Cisco Public ITE PC v4.0 Chapter 1 1 The Internet and Its Uses Working at a Small-to-Medium Business or.
Ipswich City Precinct. 6. ICC Precinct Installation Standards & Regulatory Compliance ICT Infrastructure Integration & Convergence 1. Pit & Pipe Underground.
U.S. Army Corps of Engineers (USACE) AEC Utility Monitoring And Control Systems and Electronic Security Systems (UMCS)(ESS) Prepared for: Energy Huntsville.
AT&T Managed Internet Service (MIS) with Ethernet Customer Site Preparation Document This document addresses Customer sites that do not have AT&T fiber.
Outside Plant Fiber Optics Outside Plant Fiber Optics Module 5 Fiber to the Home.
Depending upon the geographical distribution and the structure, the computer network can be classified into the following types:- 1) LAN 2) MAN 3) WAN.
Metropolitan Network Memorial Art Gallery GigaPOP UR Medical Center & Affiliates Outpatient Health Care Eastman School of Music UR Cardiovascular Research.
1 EASTERN MUNICIPAL WATER DISTRICT Temecula Valley Regional Water Reclamation Facility 23-MGD Expansion Project Joe Mouawad, P.E. Senior Director.
PRE-PLANNING FOR CONSTRUCTION PROJECTS. OVERVIEW ASSESSING OWNER CAPABILITIES ANALYSIS OF RESOURCES REGULATORY REQUIREMENTS SITE DEVELOPMENT REVIEWING.
Strategic Utility Consulting Smart Grid and its Opportunities for New Rate Designs April 28, 2016 Dale Pennington Managing Director UtiliWorks Consulting,
1 Wide Area Network Project Information Technology Advisory Committee April 11, 2007.
Shared Service Delivery in the Windy City Patrick Christian University of Wisconsin July 17, 2006.
AMI System Status Report December 11, Project Objectives Selection, p rocurement and implementation of an AMI System that: Provides automated meter.
FINANCIAL INCLUSION AND SHARED PROSPERITY: THE NEXT FRONTIER Michael Morris Executive Director National Disability Institute June 2, 2016.
FiberCo/WaveCo Update
Strategy for Complex Networking, IT, & Telecommunication Decisions
NYSERNet Business Continuity Center
Chapter 1: WAN Concepts Connecting Networks
NYSERNet and the University at Albany
DATA CENTERS C21 Engineering Consultancy Services for Telecom Industry
Presentation transcript:

1 Getting to the Fiber: Lateral Builds Presented by Stephen Kankus, NYSERNet Quilt Regional Optical Networking Workshop June 22, 2004

2 Custom built metropolitan network. Multiple strands spanning Manhattan. Recently expanded into the Bronx. Designed to reduce lateral costs. Diversely routed fiber loops. Diverse colocation facilities. Seven participating institutions, to-date. Twenty odd connected sites (sans colocation facilities.) A remotely managed project. Brief Background on NYC Dark Fiber Project Getting to the Fiber

3 American Museum of Natural History Mount Sinai School of Medicine City University of New York Weill Cornell Medical Center New York Presbyterian Hospital Columbia University Fordham University Initial Participants Getting to the Fiber

4 Primary colocation facility complete – XYZ ring complete – First customer loop (AMNH) accepted – Last phase of backbone fiber placement complete – Last (phase one) customer loop accepted – * Expansion into Bronx completed – * Project Milestones Getting to the Fiber * Anticipated, of course.

5 Customer Offering. Customer Process. Single –vs.- Dual Building Entrance. Use of Existing Entrances. Securing Building Management Approval. General Construction Issues. Choosing a Contractor. Lateral (and Demarc) Build Issues Getting to the Fiber

6 Backbone near sites. Dual entrance option. First entrance for $50K NRC; additional for $25K NRC. NRC covered demarc/lateral inside 50’/150’ rule. Additional charges for construction. Additional charges to extend demarc. Initial Customer Offering Getting to the Fiber

7 Site Survey/Walkthrough. Building Engineering & Pricing Developed. Engineering and Pricing Review & Approval. P.O. Issued to NYSERNet w/Signed Drawings. P.O. and Construction Authorization Issued to Lexent. POE Construction. Cable and Hardware Placement. Equipment Rack Installed. ISP Fiber Spliced and Terminated. Customer Loop Completed and Tested. Acceptance Review. Customer Process Getting to the Fiber

8 Offered as option to each participant. First included in NRC; second for additional NRC. Decision based upon cost and mandate. Redundancy important, but few utilized this option. Decision influenced by expense: availability & ease. Decision influenced by proximity to backbone. Easier to accomplish when customer owns the building. More complicated in multi-tenant facilities. Make decision early as possible. Single –vs.- Dual Building Entrance Getting to the Fiber

9 Facilities owned by third party or customer. Saves time and money, less disruptive. May not be suitable. May not be able to get permission. Suitable, existing dual entrances generally not available. Customers may want and expect new. Rely on vendor to negotiate. Make sure customers know what they are entitled to. Use of Existing Entrances Getting to the Fiber

10 Customer owned building – generally not an issue. Non-customer owned building – potential trouble. Non-customer owned, multi-tenant – more trouble. Have a process. Be prepared to negotiate. Engage a vendor that can negotiate effectively. Building Management Approval Getting to the Fiber

11 Collapsed or otherwise unsuitable facilities. Identify beforehand who will pay. Moratoriums and municipal work. Engage a contractor familiar with authorities and permitting processes. Engage a vendor knowledgeable about the moratorium schedule and capable of gaining access. General Construction Issues Getting to the Fiber

12 Assumption that LMC would do all lateral work. Customer costs include 50’/150’ rule. Additional charges apply outside. Customers attempt to find cheaper alternatives. Leads to delays, loss of control of schedule. Issues with code and unions. Insist that customer use your contractor. Provide guidelines for use of other contractors. Insist on detailed quotes. Understand local pricing. Choosing a Contractor Getting to the Fiber

13 Stephen Kankus Director of Operations NYSERNet, Inc. 100 Elwood Davis Rd. Syracuse, New York x5234