Www.pipelineengineering.com PIPELINE ENGINEERING Multi-Diameter Pigging – Factors affecting the design and selection of pigging tools for multi-diameter.

Slides:



Advertisements
Similar presentations
Wangana Piped Irrigation Network Project Dr. Srinivasa Lingireddy Dipl.-Eng Alexander Allik Mr. Milind Murudkar.
Advertisements

Intel Water Reclaim Project Final Report 5/25/05.
Morgan City Rentals Diesel Jet Pump 6 x 6 Peerless Safe Operating Practices and Procedures.
DIRECT FIXED COST ESTIMATES ESTIMATE METHODS FOR AUXILIARIES AND SPECIFIC COMPONENTS.
Development of the Ballgrab Technology Concept to Assist in ROV Subsea Intervention Stephen Dunbar Cranfield University.
IPPTA BEST MAINTAINANCE PRACTICES IN PULP AND PAPER INDUSTRY TO IMPROVE PROFITABILITY • Arial font to be used • Round dots to be used for bulletpoints.
Finally, a compressed air piping system so simple…it’s EZ!
REMOTE MEASUREMENT OF STRESS IN FERROMAGNETIC PIPELINES Motivation Ageing global pipeline infrastructure Non-invasive, remote, pipeline integrity assessment.
Pigs Unlimited, Inc. Introduces….
PORTABLE TEMPORARY PIG LAUNCHER thomas cornthwaite
Variation Management of Key Characteristics
Pipeline Engineering - PE Developments in Mechanical Production Cleaning of Pipelines Robin Brinham PPSA Aberdeen Nov. 14th.
(c) 2007 Mauro Pezzè & Michal Young Ch 1, slide 1 Software Test and Analysis in a Nutshell.
Principles of Liquid Flow through Pipelines
1 The ProMus Pump A New Direction in ProMinent Metering Pumps.
DESIGN GUIDE FOR GAS CENTRALISED HOT WATER SYSTEMS
Needle Bearing Product Overview
CHECK VALVES Check Valves Some Characteristics of Check Valves :
Pipe Fittings. Purpose of Pipe Fittings  Plumbing fittings have different shapes which allow rigid straight pipe to change both direction and diameter.
Las Delicias Water Project: Piping System Design EWB-MAP Compiled by: Richard Cairncross Date 1/12/2012 Updated: 2/12/2012.
Confidential to SMD JIP
STEAM HEATING.
3P Services, Germany Basil Hostage
Las Delicias Water Project: Piping System Design EWB-MAP Compiled by: Richard Cairncross Date 1/12/2012 Update: 2/2/2012.
Classification of Lathe
Learning Objective 1 Explain the ways water supply system components are used by firefighters.
Las Delicias Water Project: Piping System Design EWB-MAP Compiled by: Richard Cairncross Date 1/12/2011.
Steps towards low-risk pipeline inspection Alberto Di Lullo Flow Assurance Engineering Technologies Manager.
1 Philip Sher Connecticut Department of Public Utility Control Gas Pipeline Safety Unit RepresentingNAPSR National Association of Pipeline Safety Representatives.
Petroleum Engineering 406 Floating Drilling
Design and Plans for Introducing Flexible End Parts Steve Krave 15 October 2013.
Hydraulic Engineering
HVAC523 Circulator Pumps.
Philip Holweg Wim der Kinderen (Shell Expro)
Horizontal Well Artificial Lift Projects Advisory Board Meeting, August 16, 2012 Project-2 Investigation of Artificial Lift Techniques in Horizontal Gas.
Inspection solutions for short pipelines in plant facilities
Quadna Field Installation Expert Field Installation Including Start-up and Commissioning Field Service Quadna Field Installation Expert Field Installation.
PROCESS PIGGING. 2 Process – Pigging In this course you will learn: The functions of pigging Terminology The different types of pigs In-line inspection.
1 CTC 450 Review Water Processes. 2 Objectives Understand the basics with respect to operation of waterworks.
The Family of Shell and Tube Heat Exchangers P M V Subbarao Professor Mechanical Engineering Department I I T Delhi Family members with Simple Geometrical.
SPE A novel fully plastic caliper pig for low-risk pipeline inspection Design, Characterization and Field Test A. Di Lullo, A. Tasso, eni M. Cocuzza,
Vacuum Fundamentals High-Vacuum Technology Course Week 7 Paul Nash HE Subject Leader (Engineering)
Compression Ignition Engines
PF3W Series 3-Color Display Digital Flow Switch Planned release date: May 2012.
Rod Dry Dec Training Module #4: Problem Statement Water at a (constant) feed pressure of 4 barg flows through a DN400 pipe fitted with an equal.
Future Technology Already Proven C-Valves Piston Actuated Control Valves.
Submitted by Pradeep pataskar Roll no.11031M02034.
Wet Demonstrator Objectives. 2 A Brief History Functional Requirements First DraftJuly 2014 Wet Demonstrator Scope First DraftJuly 2014 Singapore Workshop.
Unit 209: Drainage systems
Air condition installation
Pipe Fittings Purpose of Pipe Fittings  Plumbing fittings have different shapes which allow rigid straight pipe to change both direction and diameter.
Dewatering Flowlines with Foamers C. Passucci, K.C. Hester, A. di Lullo Flow Assurance: Ensuring Production Today, Creating Solutions for Tomorrow.
PSO AS Company presentation Product & Engineering supplier to on- and offshore industry Main office and warehouse at Forus, Stavanger Innovative,
VALVES IN PIPE LINES.

TRENCHLESS TECHNOLOGY
Pipe Fittings.
Asekhame Yadua Introduction Main Results
HIGH PERFORMANCE PRESSURE SYSTEMS.
Content Development of the second generation Power2 Case studies
Services mock-up Full-scale mock-up of one half end-cap.
Welcome! Drafting 2323: Pipe Drafting
¾”-2”.
Use of Kongsberg Extra Detections to Support Pipeline Inspection Surveys Bart-Jan Tijmes Hydro November 2017.
GENERALPIPINGREQUIREMENTS:. Designing and erecting an efficient piping system requires certain aspects/ requirements which could be found in our PME handbook…
Ultrasonic In-line Inspection Technology and Fitness-For-Service Assessment for Non-Traditional Pipeline Inspection Applications Dan Revelle.
FLOWSERVE NAF Duball DL Pocket Valve Product Presentation
MODIFICATION OF MOTORIZED OPERATED VALVE MOV
Meeting of the Working Group on Rail Transport Statistics
STUB configuration Mats Pålsson
Presentation transcript:

PIPELINE ENGINEERING Multi-Diameter Pigging – Factors affecting the design and selection of pigging tools for multi-diameter lines Karl Dawson PPSA Aberdeen 19 th November 2008

Agenda Why Multi-Diameter Lines? Definitions Pig Selection Pig Design Provision of data for pig design Prototype Development and Validation Testing Case Study Summary Presentation End

Definitions Industry Accepted Definitions: Dual-diameter – Operates in 2 distinct diameters Multi-diameter – Operates in two or more diameters and may operate in a range diameters or sizes in between

Why Multi-Diameter Lines? Multi-Diameter lines are installed due to: Cost – Procurement – Installation – Associated features Standardisation – deepwater – Valves – Connectors Weight Space Necessity – Tie-in – Control Pressure losses Subsea Pigging Loop

Pig Selection Purpose of Pigging Operation: Dewatering Cleaning – debris removal Gauging Batching Inspection Camera Apply internal treatment Wax Removal

Pig Design Internal Diameters – Range of sizes Bend Radii – 5D, 3D or 1.5D Feature definition and configuration – Valve Gate Full bore ball Check Lengths of run Transitions Location of features – In relation to one another and specified diameters Factors Affecting Pig Design:

Pig Design Continued Factors Continued: Flow and Pressure Conditions Medium Expected Debris or Internal Line Condition Pig Trap – Dimensions – Configuration Interaction of Pig Characteristics to Negotiate Features Build up of Deposits Dual Diameter with Unbarred Tee

Provision of Data Interaction of line and pig features Influencing factors: Interaction Variation Combination All available data is of use in the process of design: ‘Every Little Helps’ Stick to the facts – never assume Wye and Bend Combination

Prototype Development and Validation Testing Why Test? Prove design Prove Functionality Gather Data Experience the unpredictable The overall objective to maximise tool effectiveness and to minimise risk Test Rig Example

Case Study 600m Water Depth: 8” x 10” Flooding, Cleaning and Dewatering Tool Operational Requirements: 8” Launcher and pipe work ID = mm Connector ID = mm 5D bend ID = mm Tapered transition = 1 in 6 10” Line ID = mm Buckle arrestor = mm Length fixed at 400 mm due to laydown head To be back loaded in to laydown head ID = mm Bi-directional capability Functional Requirements: Remove construction debris Flood line for hydrotest Dewater line

Pig Design: Mandrel Body Segmented Supports active in all diameters Diameter specific seals for each line section Symmetrical disc packs Transmitter housing Initial Design Case Study 600m Water Depth: 8” x 10” Flooding, Cleaning and Dewatering Tool

Test Rig Design: Case Study 600m Water Depth: 8” x 10” Flooding, Cleaning and Dewatering Tool

Final Proven Design Modifications made following trials: Extra discs fitted and radial grooves added to improve support in larger diameter Support flexibility improved in tapered transitions through reconfiguring the disc pack Quantity of sealing discs reduced to prevent discs clashing and loss of positive seal Pig has successfully been run in field operations Case Study 600m Water Depth: 8” x 10” Flooding, Cleaning and Dewatering Tool

Conclusions Involvement in the FEED stage is invaluable for both parties Free flow of information is key to an effective and suitable design solution Changes are ok, but the impact must be assessed Testing of the intended design is essential at reducing the risk involved in field operations With modern design capabilities and functional testing, multi- diameter pigging need not be a subject to be avoided, instead with careful consideration even the most arduous of diametrical variations may prove piggable

End Thank you kindly for listening Questions Welcome