Intra Hour Tagging/Oasis During System Contingencies The transmission tagging process was initially developed to solve an after the fact accounting issue.

Slides:



Advertisements
Similar presentations
e-Tag Functional Specification
Advertisements

E-Tag 1.8 An industry tutorial. e-Tag 1.8 The basics features of e-Tag 1.8 are much the same as in the current version The tag author uses Agent.
Business Practices Subcommittee Update August 17, 2010.
NAESB Coordinate Interchange Version 1 Standard Revision 1, Draft 5 August, 2005.
E-Tag 1.8 An industry tutorial.
NAESB Coordinate Interchange
WECC Board of Directors April 21-23, 2004 Seattle, Washington WECC Procedure for Reporting of System Events Disturbance Reports Rod Maslowski OC Vice Chairperson.
Definition of Firm Energy and Interruptible Transmission Two Issues Causing Problems for Business in the Western Interconnection.
NAESB Coordinate Interchange Standard, Version 1 / 0
WECC - Addressing Commercial Practices Ed Beck Chair, Market Interface Committee.
Operating Reserves --- Again A Discussion Primer
© 2009 The Williams Companies, Inc. All rights reserved. ______________ WECC November 12, 2012.
Enhanced Curtailment Calculator Task Force Report
Load Responsibility in the NWPP Footprint
WECC BAL-STD-002 Workshop February 6, 2008
WECC - Addressing Commercial Practices Ed Beck Chair, Market Interface Committee.
WECC Operating Committee Report WECC Member Meeting April 20, 2006.
Interchange Authority Recommendations Board of Directors Meeting December 7, 2007.
BAL-002-WECC-1 Contingency Reserves
Interchange Scheduling and Accounting Subcommittee Update WECC OC Meeting June 2009 Salt Lake City, Utah Marilyn Franz ISAS Chair.
1 ColumbiaGrid Activities Supporting Integration of Renewable Generation Presentation to the Market Interface Committee At the October 30, 2008 Meeting.
Western Electricity Coordinating Council Market Issues Subcommittee Report to the Market Interface Committee Philip Tice October 30-31, 2008.
Interchange Scheduling and Accounting Subcommittee Update October 2008 Gary Nolan ISAS Vice-Chair.
Presented to the WECC MIC June 15, 2007
Gary Nolan Interchange Scheduling and Accounting Subcommittee Chair e-Tag Denial Issue Referred to Joint Guidance Committee.
Brenda Ambrosi Interchange Scheduling and Accounting Subcommittee Chair e-Tag Denial Issue Referred to Joint Guidance Committee.
FERC Order minute Scheduling.
INT Rewrite Projects Presented by Bob Harshbarger January 2012.
WECC Reliability Management System Tagging Requirements Before the WECC MIS Meeting November 13, 2009 By David Lemmons.
Sheryl Welch, ATFWG Chair August 20, 2014 Portland, OR.
FEBRUARY 27, 2013 BY NARINDER K SAINI ED SKIBA BPS-CO-CHAIRS Parallel Flow Visualization Overview 1.
9/22/00 1 Jerry W. Smith. 9/22/00 2 Jerry W. Smith.
NERC Functional Model AND HOW IT RELATES TO THE ERCOT REGION
Andy Meyers Interchange Scheduling and Accounting Subcommittee Chair Discussion Item: Use of Emergency eTags January 2015 Salt Lake City, UT.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 1 Network Operating Committee (NOC) June 12 th, 2014.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N WIAB WECC Interchange Authority Backup BY LOU MIRANDA BONNEVILLE POWER ADMINISTRATION TRANSMISSION.
NERC Congestion Management Congestion Management Option 3 Vendor Meeting Julie Pierce – NERC IDCWG Chair.
Reserves Issue For years there has been disagreement over reserves issues and what constitutes firm power. We’ve been able to function as a market, despite.
DRAFT Request for Initiation of a NAESB Standard NAESB OS Oct 23-24, 2013 Richmond, VA.
WECC Market Interface Committee Update WSPP Spring 2008 Meeting April 8, 2008 Robert D. Schwermann MIC Chair.
2013 Calendar Year Customer Survey Results
NAESB WEQ UPDATE Interchange Scheduling and Accounting Subcommittee Meeting Salt Lake, UT August 26, 2015 Bob Harshbarger Puget Sound Energy.
Reliability and Operations Subcommittee Report Presentation to the ERCOT Technical Advisory Committee January 6, 2005.
Reserves…Where are we??? Service Schedule C Service Schedule C C-3.10 Seller shall be responsible for ensuring that Service Schedule C transactions are.
Northwest Wind Integration Forum Policy Steering Committee Meeting January 6, 2010 WECC VGS--REC Impacts Work Team Update Paul F Arnold—VP ColumbiaGrid.
Entergy AFC Stakeholder Meeting February 16, 2005 Houston, TX.
Transmission Congestion Management – IDC Granularity Option 3A Larry Kezele and Jeff Norman June 28, 2005 NERC/NAESB TLR Subcommittee.
NAESB WHOLESALE ELECTRIC QUADRANT BUSINESS PRACTICES SUBCOMMITTEE ACTIVITIES UPDATE TO JOINT ELECTRIC SCHEDULING SUBCOMMITTEE JANUARY 5, 2012 BY ED SKIBA.
Reliable Power Reliable Markets Reliable People RAS Guideline Initiative March 23, 2009.
Standards Review Subcommittee Update August 17, 2010.
2013 Wind Conference. Congestion Management & Communication Processes CJ Brown.
After-the-Fact Workgroup Update Sheryl Welch ISAS Meeting January 12-13, 2016 Phoenex, AZ.
Texas Regional Entity ROS Presentation January 15, 2009 T EXAS RE ROS P RESENTATION J ANUARY 2009.
RAWG Agenda Item LAR Data WECC Staff. Data Elements Generator information – Existing – Changes Monthly Peak Demand and Energy (actual year and.
WSPP Webinar Proposed Service Schedules Operating Reserve Service (D) Intra-Hour Supplemental Power (E) February 4, 2010.
Current Nodal OS Design 1.The NMMS database will have an OWNER and an OPERATOR designation for each piece of equipment in the model. The OWNER and OPERATOR.
Unscheduled Flow Administrative Subcommittee Report
Grid Integration of Intermittent Resources
Pseudo-tie business procedure
Mgr. Interconnection Reliability Initiatives
Review of After-the-Fact (ATF) Tagging Criteria Scheduler’s Meeting May 24, 2016 Raymond will ask the audience what their expectations are in regard to.
Interchange Scheduling and Accounting Subcommittee Meeting
Review of After-the-Fact (ATF) Tagging Criteria Scheduler’s Meeting May 24, 2016 Raymond will ask the audience what their expectations are in regard to.
Assigned to the WEQ OASIS and WEQ OASIS/BPS Subcommittees
Interchange Authority Function Task Force
Two-Tier Firm Curtailment Overview
NERC Congestion Management
WIAB WECC Interchange Authority Backup
Standards Review Subcommittee Update
Pseudo-tie business procedure
Presentation transcript:

Intra Hour Tagging/Oasis During System Contingencies The transmission tagging process was initially developed to solve an after the fact accounting issue which manifested from an explosion of energy transactions and the number of entities trading the same blocks of energy across the interconnected system. Over time the tagging process has evolved into a system which is utilized to determine transmission path availability, track transmission access rights, schedule hourly capacity and energy, and provide a tool to help Balancing Authorities (BA) with their hourly balancing requirements.

Intra Hour Tagging/Oasis During System Contingencies There is a direct relationship between Tags and the transmission reservation process through OASIS. If there is not a transmission reservation number on a tag the tag will not implement. linking both processes, especially during system contingencies when scheduling processes are time constrained, a schedule re-direct, or energy acquisition process is quite complex.

Intra Hour Tagging/Oasis During System Contingencies For an hourly transaction, tagging and OASIS guidelines are as follows: For a tag adjustment, adjustments are required to be submitted by half past the hour. For submittal of a new tag, a tag is considered late 20 minutes prior to the beginning of the next hour. There are penalties imposed on the Balancing Authority if they approve an excessive amount of late tags. This penalty has resulted in an inconsistent approach to the approval of late tags by individual BAs.

Intra Hour Tagging/Oasis During System Contingencies Emergency tags may be issued after the time limit. Its up to the sink BA to determine if an emergency exists. There is no controlling definition as to what an emergency is. Request for transmission is limited to 30 minutes prior to the start of the next hour. There are very few entities who allow mid-hour purchase of transmission (one?) and this is subject to monitoring and approval time lags.

Intra Hour Tagging/Oasis During System Contingencies Transmission and generation curtailments or outages are not restricted to tagging and OASIS scheduling restrictions. Power will flow to load utilizing the path of less resistance with or without a tag or OASIS reservation unless alternative action is taken, the transmission system is interrupted by automatic protection devices, or load is intentionally dropped. Tagging and OASIS procedures have limited our ability to respond to less than normal conditions.

Intra Hour Tagging/Oasis During System Contingencies Accounting and scheduling tools (Tagging/OASIS) have evolved into a limiting factor on the power system during certain conditions making it difficult for load serving entities to manage their load serving and system reliability obligations during system contingencies and therefore contribute to the degradation of system reliability.

Intra Hour Tagging/Oasis During System Contingencies Tagging and transmission reservation timelines and/or requirements do not relax during system contingencies. Existing tagging and OASIS timelines make it burdensome to redirect schedules within the hour even when alternative firm transmission rights exist. It forces load serving entities to incur EI or transmission penalties due to denied tags or complex tagging obligations. Emergency tagging provisions are enacted inconsistently making it difficult to determine proper processes and procedures during system events.

Intra Hour Tagging/Oasis During System Contingencies Tags have been denied as late while the LSE is attempting to make necessary tag adjustments during a USF mitigation process. Load has been dropped during a system contingency due to the complexities of the tagging and OASIS process and the inability to obtain generation resources to serve load in a timely fashion.

Intra Hour Tagging/Oasis During System Contingencies In the PACE February 14th Disturbance Report, Recommendation #21a states: The WECC MIC shall initiate an investigation into how it might be able to allow more flexibility in the tagging process, including specifically addressing initiation of tags at times other than the top of the hour.

Intra Hour Tagging/Oasis During System Contingencies The MIC is asking for committee participants from both the marketing and transmission scheduling segments to explore ways to address conflicts between energy and transmission scheduling and existing tagging and OASIS transmission reservation procedures which occur outside existing timelines, specifically during system events which require timely schedule re-directs and/or resource acquisition.

Intra Hour Tagging/Oasis During System Contingencies It will be the objective of this group to develop solutions to the problem, frame the solutions into a white paper to post for comment and develop necessary changes to industry processes and procedures and/or standards.