2 Ongoing Review Activities
Continue Review of NERC Activity Review WEQ Recommendations, Interpretations, and Minor Corrections posted for Formal Comments Glossary Coordination with Retail Glossary Subcommittee Ongoing Cross Quadrant Review of: Standards Requests Minor Corrections Clarifications /Interpretations

3 NERC Monitored Projects
Project FERC Order 804, Complete and accurate Load Forecasts including supporting methodology Project BAL-002 BA Areas share equally in providing interconnection frequency support Project BAL-005, -006 BA meets balancing obligations Project Retire BAL-004 Project Emergency Ops Periodic Review Project Alignment of NERC of Glossary Terms and Definitions Used in the Rule of Procedure

4 Project Project FERC Order 804, Complete and accurate Load Forecasts including supporting methodology Includes Distribution Provider and Load Serving Entities in reporting requirements for load data Load data requirements are yearly and monthly Possible linkages to NAESB standards dealing with forecasting (e.g., NITS)

5 BAL Standard Projects Project 2010-14.1 BAL-002 Contingency Reserve
Multiple NERC Glossary Terms additions and modifications: Balancing Contingency Event, Most Severe Single Contingency, Reportable Balancing Contingency Event, Contingency Event Recovery Period, Contingency Reserve Restoration Period, Pre-Reporting Contingency Event ACE Value, Reserve Sharing Group Reporting ACE, Contingency Reserve Project BAL-005, -006 Host BA meets balancing obligations Project technical white paper includes evaluation of WEQ-007 on the basis on modifications made to these two reliability standards Project Retire BAL-004 Initial ballot scheduled for November 2015, SDT recommends retirement Various stages of development BAL-002 balloting complete, submitted to NERC BOT for adoption BAL-005 & -006 September 2015 industry comments are in SDT review BAL-004 balloting and industry review November 2015 with the SDT recommending retirement

6 Project 2015-04 Project 2015-04 Alignment of NERC Glossary of Terms
Retains and modifies ‘Load Serving Entity’ Technical White Paper posted, retains all NERC Glossary Terms with modifications to some (e.g., LSE)

7 Questions for the EC Should the BAL-004 project currently assigned to the BPS be expanded to include the NERC BAL-002, -005, & -006 projects? Is there a NAESB assignment associated with NERC Project ?