Renewable Proposals Made at October Board. Proposal 1 Identify analyses needed to inform policy debates Coordinate WECC-wide info/analysis and coordinate.

Slides:



Advertisements
Similar presentations
WECC/TEPPC Response to DOE Funding Opportunity Status Update June 29, 2009 Bradley Nickell Renewable Integration and Planning Director.
Advertisements

Strategic Planning Update For Board Meeting December 5, 2007.
Operating Reserves --- Again A Discussion Primer
2007 Goals. Introduction Western Electricity Coordinating Council (WECC) will be primarily defined throughout the 2007 year by Electric Reliability.
Western Electricity Coordinating Council Market Interface Committee Report to the WECC Board of Directors December 6-7, 2007 Robert D. Schwermann MIC Chair.
RELIABILITY POLICY ISSUES COMMITTEE REPORT JANANNE SHARPLESS NON-AFFILIATED DIRECTOR APRIL 28, 2009 CORONADO, CALIFORNIA.
Western Electricity Coordinating Council Identify, coordinate, and propose solutions to seams issues Participate, monitor and communicate the development.
LRS Report to PCC Wally Gibson, NWPCC Planning Coordination Committee Albuquerque, NM March 6-7, 2008.
Renewable Proposals Made at October Board. Proposal 1 Identify analyses needed to inform policy debates Coordinate WECC-wide info/analysis and coordinate.
ACE Diversity Interchange (ADI)
Ad Hoc Bulk Electric System Task Force Update RPIC February 19, 2009.
WGA West-wide Renewable Energy Zone (WREZ) Project.
Liaison Report CREPC Liaison Report Lou Ann Westerfield Idaho Public Utility Commission Market Interface Committee March 6-7, 2008.
NERC PC Issues Update WECC PCC Meeting John Simpson, RRI Energy Planning Coordination Committee Seattle, WA June , 2010.
NREL is a national laboratory of the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy operated by the Alliance for Sustainable.
The Big Picture Discussion with the Wyoming Infrastructure Authority and Joint Minerals Committee Steve Ellenbecker Wyoming Infrastructure Authority.
Reliability Challenges White Paper Victoria L. Ravenscroft Senior Policy Analyst W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Montana Energy Summit Transmission Planning Process April 22, 2008.
Western States Energy & Environment Symposium October 27, 2009.
Incorporating Water into Electricity Planning Doug Larson Executive Director Western Interstate Energy Board WSWC-WGA Water/Energy Workshop April 2, 2013.
Western Governors Association Renewable Energy Certificates Initiative for the West WRAP Board Meeting October 15, 2003 Salt Lake City, Utah.
Western Wind Integration Study Kevin Porter – Exeter Associates, Inc. Brian Parsons, Michael Milligan, Debbie Lew – NREL DOE Wind Program Peer Review July.
Variable Generation Subcommittee Paul Arnold and Michelle Mizumori Northwest Wind Integration Forum Technical Work Group October 29, 2009.
Western Wind Integration Study Debbie Lew NREL. Goal To support multi-state interests in understanding the operating and cost impacts due to the variability.
Past Studies and Resource Diversity Western Renewable Energy Zones, a joint initiative of the Western Governor’s Association and the U.S. Department.
1 Wind Integration Study Team (WIST) Report to the Northwest Wind Integration Forum Steering Committee January 6, 2010 Jeff Miller - ColumbiaGrid Rich.
WestConnect Activities Charles Reinhold WestConnect Project Manager 2008 ACC BTA Workshop Phoenix, AZ May 22, 2008.
Western Wind and Solar Integration Study Debbie Lew National Renewable Energy Laboratory SWAT/CCPG Meeting Aug 22, 2007.
Variable Generation Subcommittee Michelle Mizumori WECC January 6, 2010.
Low carbon scenarios for the UK Energy White Paper Peter G Taylor Presented at “Energy, greenhouse gas emissions and climate change scenarios” June.
WECC Response to DOE Funding Opportunity on Regional Planning Northwest Wind Integration Forum Steering Committee January 6, 2010 Tom Schneider Managing.
Thoughts on Order 1000 and Western Clean Energy Needs Doug Larson September 10, 2015.
Debbie Lew (NREL) TEPPC MWG Feb 6, 2008 Western Wind and Solar Integration Study and Virtual Control Area Study.
Integration of Variable Generation Task Force (IVGTF) & Emerging Issues Mark Lauby Manager, Reliability Assessments
Icfi.com © 2006 ICF International. All rights reserved. Wyoming Collector and Transmission System Project – Status Report Presented to: Wyoming Infrastructure.
Use of EDWG Data by the LTPT WECC Staff October 9, 2015 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Western Renewable Energy Zone Project October 29, 2009 John Savage Oregon Public Utility Commission.
NREL is a national laboratory of the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy operated by the Alliance for Sustainable.
SPSC Low Carbon Tool: Interim Status Report CREPC/SPSC meeting San Diego, CA October 5, 2012 Arne Olson.
1 Intermittency Analysis Project: 2010 Accelerated and 2020 Scenarios Dora Yen-Nakafuji, Commission Project Manager Kevin Porter, IAP Team Lead CEC PIER.
Western Renewable Energy Zone (WREZ) Concept (as of 11/27/07)
Eastern Wind Integration and Transmission Study David Corbus - Project Manager Matt Schuerger (Consultant) National Wind Technology Center NREL Golden,
1 CREPC 101 September 19, 2005 San Diego. 2 CREPC 101 CREPC History – Doug Larson Operation of Committee – Marsha Smith Relationship with other Western.
Updated 1/28/2011. Renewables Integration Plans and Challenges March 8, 2011 Jay Caspary ·
Craig Williams Market Interface Manager August 21, 2014 ISAS, Portland, OR.
Jan Strack San Diego Gas and Electric TEPPC Overview TEPPC Review Task Force January 11, 2016 Salt Lake City, UT.
Future Expectations of TEPPC: Products, Users, and Values Maury Galbraith Presentation to TEPPC Review Task Force January 11,
RAWG Agenda Item LAR Data WECC Staff. Data Elements Generator information – Existing – Changes Monthly Peak Demand and Energy (actual year and.
Northwest Wind Integration Forum Technical Work Group Meeting October 29, 2009.
TEPPC Review Task Force January 11, Purpose Advise and make recommendations on Future potential future generation and load balance Adequacy of the.
Institutional Support Vladimir Koritarov Argonne National Laboratory April 2016.
Transmission Advisory Group NCTPC Process Update Rich Wodyka September 7, 2006.
Energy Imbalance Market (EIM) Dan Dettmer Board Meeting February 16, 2011.
NREL is a national laboratory of the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy operated by the Alliance for Sustainable.
EIM/EDT Update ColumbiaGrid Planning Meeting June 2, 2011.
DWG Wind Profile Review November 11, 2014 Dan Beckstead Associate Staff Engineer.
Regional Transmission Expansion Project Staff Council Briefing Tom Kaiserski (MT) Program Manager February 15, 2011 Governor’s Office of Economic Development.
4/16/2010 Regional Planning Group Meeting Long-Term Planning Study of the ERCOT Interconnection Warren Lasher Manager, System Assessment.
CREPC/WIRAB Meeting April 27, 2016 Salt Lake City, UT Thomas Carr Western Interstate Energy Board Evolution of Grid Planning in the West.
TEPPC Review Task Force Ian McKay, Chair, TEPPC W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Dan Beckstead Associate Staff Engineer TEPPC 2026 Common Case Load.
TEPPC Review Task Force Meeting February 4-5, 2016
Reliability Assessment Committee Proposal TSS Meeting
Reliability Assessment Committee
Integration of Variable Generation Task Force (IVGTF) & Emerging Issues Mark Lauby Manager, Reliability Assessments
Scenario Development Subcommittee January 4, 2018
Dan Beckstead Associate Staff Engineer
Variable Generation Subcommittee Update to PCC
WECC 2019 Scenario Demand-Side Models
Presentation transcript:

Renewable Proposals Made at October Board

Proposal 1 Identify analyses needed to inform policy debates Coordinate WECC-wide info/analysis and coordinate with other analyses (e.g., WestConnect/NREL solar and wind integration study) Example analyses: Major growth in renewable generation National RPS and/or robust Western RECs trading system Technology breakthroughs (PVs, CCS) Electrification of the transportation sector Climate change impacts on load and hydro generation Other Who: Variable Generation Subcommittee Recent Activity: Technical Session at December Board Kickoff Meeting January 15 Draft work plan

Proposal 2 Assessment of transmission needs: Continue to build analysis capacity (historical schedules/flows, modeling of capital and operating costs for transmission solutions) Evaluate robustness of transmission solutions beyond 10 years (scenario analysis beyond 10 years) Who: TEPPC Recent Activity: 2009 Study Plan in progress. Likely to include capitol costs and time horizon longer than 10 years Task Force to respond to Stimulus Bill

Proposal 3 Forum for LSE and PUC resource planners Establish in conjunction with others (CREPC, WGA, CEOs) a forum to promote information sharing among LSE resource planners and PUCs/energy agencies Forum would share information on topics such as methods for evaluating carbon risk in resource decisions, low carbon technology assumptions Forum would respond to requests (e.g., LSE long-term renewable generation plans) Who: WGA Recent Activities: Planning Forum held February 24-25

Proposal 4 Evaluate the long-term adequate sizing of new transmission to location-constrained low carbon resources Who: TEPPC Recent Activities Long-term transmission planning forum February 2-3 WGA request for transmission superhighway overlay for 2009 study plan being considered

Proposal 5 Undertake timely analysis of the reliability implications of innovations to reduce cost of integrating renewables, such as: ACE Diversity Initiative Regulation sharing Virtual control area consolidation Who: Variable Generation Subcommittee Recent Activity: Technical Session at December Board Kickoff Meeting January 15 Draft work plan

Proposal 6 Consider additional tests for approving new Balancing Authorities such as: Will the creation of a new BA lower the cost of integrating more renewables? Will a new BA improve reliability? Who: WECC Staff (complete) Recent Activities Staff presented whitepaper during December Board