INT-008-WECC-RBP-2 Mike Pfeister Salt River Project Joint Session January 10, 2013.

Slides:



Advertisements
Similar presentations
Business Practices Subcommittee Update April 30, 2013.
Advertisements

Business Practices Subcommittee Update August 20, 2013.
Business Practices Subcommittee Update October 23, 2012 DRAFT.
e-Tag Functional Specification
Standards Review Subcommittee Update April 30, 2013.
Business Practices Subcommittee Update August 17, 2010.
Business Practices Subcommittee Update October 26, 2010.
Business Practices Subcommittee Update February 2, 2010.
Business Practices Subcommittee Update February 1, 2011.
Business Practices Subcommittee Update April 30, 2012.
Standards Review Subcommittee Update October 22, 2013.
Standards Review Subcommittee Update August 20, 2013.
Operating Reserves --- Again A Discussion Primer
Dynamic Schedule e-tagging Requirements Criterion WECC-087 (formerly INT-008) ISAS Report January 2012.
WECC Standards Committee Join Session Webinar Meeting September 5, 2013.
Dynamic Transfers Bob WECC MIC Meeting “The Last Hurrah!”
Frequency Responsive Reserve Process Update
Brenda Ambrosi Interchange Scheduling and Accounting Subcommittee Chair ISAS Presentation to the MIC March 2013 Salt Lake City, UT.
Bob Harshbarger Volunteer Order 771 January 16, 2013 Still Icy-Cold Salt Lake.
Brenda Ambrosi Interchange Scheduling and Accounting Subcommittee Chair ISAS Presentation to the OC October 2013 Salt Lake City, UT.
WECC Operating Committee Request for Discussion and Guidance MOD-001-WECC-RBP-0 Reliability Data Exchange (MOD) October 24, 2013.
WECC Response to BAL-002-WECC-1 Remand Order December 10, 2010 WECC Board of Directors Meeting Steve Rueckert Director of Standards.
Document Categorization Steve Ashbaker Director of Operations Joint Guidance Committee WECC Leadership Annual Training Session Salt Lake City, UT May 6-7,
WECC Standards Committee Join Session Webinar Meeting September 5, 2013.
Standards Update WECC Board of Directors Technical Session December 5, 2007 Albuquerque, New Mexico Steve Rueckert Director of Standards.
Bulk Electric System Definition Task Force Update Reliability Policy Issues Committee March 4, 2010 Brian Theaker BESDTF Chair.
Interchange Scheduling and Accounting Subcommittee Update WECC OC Meeting June 2009 Salt Lake City, Utah Marilyn Franz ISAS Chair.
MIC/ISAS LIAISON REPORT June 15, 2007 April, 2007 ISAS Meeting Highlights.
Interchange Scheduling and Accounting Subcommittee Update October 2008 Gary Nolan ISAS Vice-Chair.
Western Electricity Coordinating Council Status of NERC Standards Activity WECC PCC Meeting March 6-7, 2008.
Brian Theaker RCWG Chair
Brenda Ambrosi Interchange Scheduling and Accounting Subcommittee Chair e-Tag Denial Issue Referred to Joint Guidance Committee.
ColumbiaGrid Update WECC PPC June 11, Biennial Plan Update Approved by the ColumbiaGrid Board of Directors on February 17, 2010.
Tier One Standards Update Steve Rueckert Director – Standards and Compliance Joint Guidance Committee Meeting January 23-24, 2007 Salt Lake City, Utah.
Status of NERC Standards Activity Joint Guidance Committee Meeting January 23-24, 2007 Steve Rueckert - WECC Director, Standards and Compliance.
Jerry Rust Chair - Underfrequency Load Shedding Criterion Team
Reliability Subcommittee Report Vishal C. Patel Chair – Reliability Subcommittee July 2014.
Marv Landauer Report to TSS on RS Activities April 25-27, 2012 Salt Lake City.
WECC Interchange Authority Michelle Mizumori Joint Guidance Committee May 5-6, 2009.
NERC PC Issues Update WECC PCC Meeting John Simpson, RRI Energy Planning Coordination Committee Seattle, WA June , 2010.
Al Badella Technical Operations Subcommittee Chair Operating Committee Report March 26 th, 2014 Salt Lake City, UT.
INT Rewrite Projects Presented by Bob Harshbarger January 2012.
W. Shannon Black Manager, Standards Processes Results Based Drafting 2013.
INT REWRITE PROJECT Interchange Scheduling and Accounting Subcommittee August 17, 2011.
ISAS Update August 2, 2011 Market Issues Subcommittee.
ISAS Update Prepared by Brenda Ambrosi ISAS Chair October 14, 2011.
IWG Update April 2014 ISAS Danielle Johnson. WIAB Test – Still looking for other volunteers for the WIAB Fall 2014 – Volunteer as of Today WAPA Rocky.
W. Shannon Black Manager, Standards Processes New Chair Orientation.
Andy Meyers ISAS Chair ISAS Report WECC Operating Committees March 2015 Salt Lake City, UT.
WECC Standards Update Steve Rueckert – Director of Standards W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Andy Meyers OC Update ISAS April 2014 Salt Lake City, UT.
Business Practices Subcommittee Update Executive Committee Meeting February 18, 2014.
Robert Sullivan Drafting Team Chair WECC-0108 WECC-0108 INT-021 Update WECC ISAS April 2015 Salt Lake City, UT.
NAESB WHOLESALE ELECTRIC QUADRANT BUSINESS PRACTICES SUBCOMMITTEE ACTIVITIES UPDATE TO JOINT ELECTRIC SCHEDULING SUBCOMMITTEE JANUARY 5, 2012 BY ED SKIBA.
SAR 001 DT Presentation Texas RE Presentation to SAR-001 Drafting Team Farzaneh Tafreshi Manager, Reliability Standards Texas Regional Entity.
Document Categorization Policy Chris Albrecht, Legal Counsel W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Business Practices Subcommittee Update Executive Committee Meeting August 18, 2015.
Business Practices Subcommittee Update
Business Practices Subcommittee Update
Compliance Open Webinar
Anitha Neve Operations and Interchange Specialist
Anitha Neve Operations and Interchange Specialist
Anitha Neve Operations and Interchange Specialist
Anitha Neve Operations and Interchange Specialist
W. Shannon Black Manager, Standards Processes
Compliance Open Webinar
Steve Rueckert – Director of Standards
Steve Rueckert Director of Standards WSC Meeting Overview
Document Categorization Policy
Standards Development Process
Presentation transcript:

INT-008-WECC-RBP-2 Mike Pfeister Salt River Project Joint Session January 10, 2013

2 INT-008-WECC-RBP-2 The OC directed the ISAS to review and update existing interchange criteria The directive was to review, identify, and correct: –Ambiguities in the existing language –Superfluous language and requirements –Missing requirements –Accuracy of assigned entities and use of defined terms

3 INT-008-WECC-RBP-2 The WECC Reliability Standards Development Procedures were used in conducting this review The drafting team was formed and work began in the later part of 2010 The first version was posted for comment on July 1, 2011

4 INT-008-WECC-RBP-2 Posted for six comment periods –First required by WECC Procedures –Second–sixth in response to industry comments –Significant changes and debate – inclusion of pseudo ties, requirement to not exceed the transmission allocation, addition of guideline and technical basis section, exclusion of intra- BA transfers

5 WECC Standards Committee o Approved expanding the scope of the SAR to include pseudo ties o Requested that the Drafting Team consider an exemption for transactions with a de minimus impact on reliability Exclusion of intra-BA transfers reduced much of the concern The DT found no MW threshold that overrides the need to tag when transfers cross BA boundaries INT-008-WECC-RBP-2

6 Seeking approval of Version 6 which was approved for ballot by the WSC on November 20, 2012 o Ballot Pool from December 24, 2012 through January 16, o Ballot is open from January 17, 2013 through February 7, INT-008-WECC-RBP-2

Questions?