August 2 and 3, 2010 Project Cost, Schedule, Risk and Contingency Jay Elias.

Slides:



Advertisements
Similar presentations
Testing Relational Database
Advertisements

Proposal / Request For Proposal Proposal / Request For Proposal Initiation Control Planning Close-down Execution.
US CMS DOE/NSF Review: May 8-10, US CMS Cost & Schedule Mark Reichanadter US CMS Project Engineer DOE/NSF Review 8 May 2001.
COST CONTROLS OF CAPITAL COSTS THROUGHOUT THE DESIGN PHASE Presented by Planning & Management Services, Inc Federal Way, WA (near Seattle) Western Winter.
August 2 and 3, 2010 ReSTAR: The Origins of KOSMOS David Sprayberry.
NGAO Construction Project Cost Estimation: Initial Thoughts Richard Dekany NGAO Team Meeting #12 December 13, 2007.
United Nations University United Nations Development Programme UNU Atlas Implementation Project Atlas Briefing Sessions – Tokyo Mar 2009 Requisitions,
Global Magnet Systems including Field Mapping MICE Project Board 28 th June 2011 M Courthold – RAL R Preece - RAL.
NGAO Management Update Peter Wizinowich NGAO Meeting #11 November 5, 2007.
NGAO Team Meeting Management Peter Wizinowich May 26, 2009.
Pertemuan Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
4. 2Object-Oriented Analysis and Design with the Unified Process Objectives  Explain the elements of project management and the responsibilities of a.
COMP8130 and 4130Adrian Marshall 8130 and 4130 Test Management Adrian Marshall.
Performance Monitoring All All Contracts require basic monitoring once awarded. The Goal of contract monitoring is to ensure that the contract is satisfactorily.
LSU 07/25/2004Estimating Costs1 Estimating Project Costs & Time Project Management Unit, Lecture 5.
Optimism R&D to be resumed! Three beam tests planned at Kek, –Hybrid target (KEKB Linac) –Liquid target (ATF Linac) –Boron-Nitride Window (KEKB) –(Starting.
Validating IPMRs, CPRs, and IMS Deliverables NAVY CEVM
1 BROOKHAVEN SCIENCE ASSOCIATES As-Built Drawings and Commissioning Status Steve Sawch Assistant Director for Construction Management NSLS-II Conventional.
August 2 and 3, 2010 KOSMOS Design Considerations Jay Elias.
BSBPMG503A Manage Project Time Manage Project Time Unit Guide Diploma of Project Management Qualification Code BSB51507 Unit Code BSBPMG503A.
From Research Prototype to Production
Common PDR Problems ACES Presentation T. Gregory Guzik March 6, 2003.
PPMT CE-408T Engr. Faisal ur Rehman CED N-W.F.P UET P.
NCSX Management Overview Hutch Neilson, NCSX Project Manager NCSX Conceptual Design Review Princeton, NJ May 23, 2002.
NEDM Construction Project Cost & Schedule Philosophy Vince Cianciolo, ORNL Physics Division Internal Cost & Schedule Review 02/11/2005.
 Coordinating construction related training  Following and gathering info for construction related performance measures  Follow Contract Modifications.
BROOKHAVEN SCIENCE ASSOCIATES National Synchrotron Light Source II Project Management Jim Yeck Deputy Director (Project Management)
Copyright 2010, The World Bank Group. All Rights Reserved. Budgeting Statistical Projects Section A 1.
Rev. 0 CONFIDENTIAL Mod.19 02/00 Rev.2 Mobile Terminals S.p.A. Trieste Author: M.Fragiacomo, D.Protti, M.Torelli 31 Project Idea Feasibility.
TBM Costing Lessons from Recent ITER Activities Scott Willms Los Alamos National Laboratory Presented at INL August 10, 2005.
BROOKHAVEN SCIENCE ASSOCIATES National Synchrotron Light Source II Project Management Jim Yeck NLSL II Deputy Director (Project Management)
Software Project Management (SPM)
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Baseline Jim Yeck NSLS-II Deputy Project Director NSLS-II PAC Meeting November 20, 2007.
Slide 1 6-Nov-98PHOBOS Review: Cost & Schedule Cost & Schedule S. Steadman, MIT PHOBOS Cost & Schedule Review Technical Advisory Committee BNL November.
© Copyright 2011 John Wiley & Sons, Inc.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Kerry Mirabella Cost, Schedule, Personnel.
January LEReC Review 12 – 13 January 2015 Low Energy RHIC electron Cooling Kerry Mirabella Cost, Schedule, Personnel.
University of Southern California Center for Systems and Software Engineering Barry Boehm, USC CS 510 Software Planning Guidelines.
TOF Project Construction Project Plan
Hall 180 Cryogenic test facility: Project management: Project Change Request, EVM and Interface Sheet L. Serio.
THE PROJECT LIFE CYCLE PROJECT MANAGEMENT LIFE CYCLE LSU 01/18/2005 PROJECT LIFE CYCLE 1.
Fermilab Presentation Greg Bock, Pepin Carolan, Mike Lindgren, Elaine McCluskey 2014 SC PM Workshop July 2014.
January LEReC Review 12 – 13 January 2015 Low Energy RHIC electron Cooling Kerry Mirabella Cost, Schedule, Personnel.
TOF Preliminary Design and Safety Review Project Management Controls R. L. Brown.
Earned Value as the Main Driver for Integrating Project Management Michael A. Hatfield PMP, CCC David J. Post PE.
1 Global Design Effort: Controls & LLRF Controls & LLRF Working Group: Tuesday Session (29 May 07) John Carwardine Kay Rehlich.
Power Upgrade Project SNS September 21-22, TBM Cost Estimate Cost Estimate Schedule Approach Tom Mann October 27, 2005.
Strykowsky 1Project Review November 2, 2005 NCSX Project Review November 2, 2005 Cost and Schedule Ron Strykowsky.
August 2 and 3, 2010 KOSMOS Project Management Jay Elias.
SOFTWARE PROJECT MANAGEMENT
Oct 17, 2001SALT PFIS Preliminary Design Review Management, Schedule, & Budget 1 Southern African Large Telescope Prime Focus Imaging Spectrograph Management,
Cost and Schedule Breakout Session Paul Weinman Pacific Northwest National Laboratory.
© JABEE 2015 Fundamental Concept of JABEE Evaluation and Accreditation JABEE evaluation and accreditation is to confirm the engineering educational program.
Welcome. Contents: 1.Organization’s Policies & Procedure 2.Internal Controls 3.Manager’s Financial Role 4.Procurement Process 5.Monthly Financial Report.
Supplier Management Can’t live with them, Can’t live without them!
NCSX Strykowsky 1Independent Project Review (IPR) June 8-9, 2004 NCSX Project Review June 8-9, 2004 Cost, Schedule, and Project Controls Ron Strykowsky.
Content Lessons from writing proposals and work on PTDR How can this meeting help to remedy problems SCT AOB.
Cost and Schedule Paul Weinman Pacific Northwest National Laboratory.
Camera PDR/CD1 Planning 19 September 2008
COSMOS Status David Sprayberry, Sean Points & Jay Elias
KOSMOS Design Considerations
Budget Budget Contingency/ Cost Risks Descope Options
Roberta Roth, Alan Dennis, and Barbara Haley Wixom
DOE: Transition from MIE to Early Operations Kevin Reil LSST Camera Commissioning Lead LSST Commissioning Plan Review January 24-26, 2017.
Preparations for a Lehman Review
Management Breakout: MREFC Budget Summary Victor L
X-ray Pump-Probe Instrument
Mark McKinnon EVLA Project Manager
Remarks on US Costing Activities for the US ITER-TBM
Detector Proto-Technical board Sep 30, 2010
Presentation transcript:

August 2 and 3, 2010 Project Cost, Schedule, Risk and Contingency Jay Elias

2 References: –KOSMOS Management document –KOSMOS Project Plan & Budget Narrative –KOSMOS Risks document –KOSMOS WBS –KOSMOS Schedule

3 Outline Review current budget status Discuss construction budget, schedule and related items

4 Current Status OSU design contract started Dec. 1, 2009 NOAO had 3 main budget components –Initial preparatory phase (Aug until Dec. 1, 2009) –Design phase science activities (non-ReSTAR) –Design phase ReSTAR effort

5 Current Status OSU will have largely spent funds by end of this month (Aug), as planned ($241K) –Final invoice after completion of design review

6 Current Status NOAO expenditures recorded through June 30: –Initial preparatory phase spent $40K –Design phase science activities spent $4K out of $31K budget –Design phase ReSTAR effort spent $46K of $145K budget –Expenditures in July/Aug will be substantial (but not $100K)

7 Current Status Why did NOAO over-estimate expenditures? –Science effort low because project scientist position became vacant, individuals “helping out” generally did not charge –Over-estimated required commitment for project management generally –Guess is that final expenditures will be somewhat over 50% of budget This experience is folded into estimates that follow

8 KOSMOS Construction Budget & Schedule Process: –OSU built up a master plan based on remaining design effort and experience with OSMOS I&T –NOAO did a more detailed estimate (given lack of experience with OSMOS) and verified schedule was consistent with OSU plan –Both effectively a bottom-up estimate starting at level 2 or 3 of WBS Won’t discuss details unless requested, see references

9 KOSMOS Construction Budget & Schedule Process: –OSU contingency estimated for major procurement categories and for manpower at relevant parts of schedule (hence, both budget and schedule contingency) –NOAO used “risk factor” approach (cf. ALMA, TMT, etc.) at the task level, roll up into pool. Associated schedule contingency consistent with OSU plan

10 Budget Summary InstitutionOSUNOAO (ReStar) NOAO (Base) Baseline Payroll$208,966$591,167$51,445 Non-Payroll$281,307$234,094$2,520 Baseline F&A$124,932 Contingency $73,100$129,611$7,144 Contingency F&A $9,584 Sub-Total $697,889 $954,872$61,109 Total$1,015,980 Cont./Baseline13.4%15.6%

11 Contingency Rolled up at the institutional level –Easier to manage than if done at project level –Overall just under 15% of baseline costs – plausible given nature of project –We expect to spend it – properly estimated, that’s what it’s for

12 Budget Summary by WBS Some remarks: –Because of granular budgeting at OSU (and standard university policies for faculty salaries), OSU costs concentrated in a few elements –Some WBS elements are more separate than others – e.g., 6 & 10 linked

13 Budget Summary by WBS WBSOSUNOAOTotal 1: Project Management$53,162$118,125$171,287 2: Science Team Activities$43,079$53,965$97,044 3: Systems Engineering$0$57,972.$57,972 4: Optics$271,559$1,646$273,205 5: Spectrograph Mechanical$104,363$95,888$200,251 6: Spectrograph Controls and Telemetry $61,604$0$61,604 7: Facility Modifications$0$6,173 8: Detector System$0$259,030 9: Top-Level Software$0$127,425 10: Integration and Test$75,340$90,965$166,305 11: Shipping$6,100$0$6,100 12: Documentation and Training $0$39,838 13: Slit Mask Fabrication$0$18,200 Contingency$82,685$146,755$220,300 Total$697,889$1,015,980$1,713,869 Table 5.2 –Project Cost by WBS Element

14 Total Cost Including construction phase budget and anticipated expenditures for design phase, total instrument cost will be just under $2.1M

15 Schedule Detailed schedule available on-line (on-wall) –Most major tasks flow independently into I&T phase –Mechanical design and fab is the main exception –Interaction between spectrograph control software and top-level software

16 Schedule Schedule looked at NOAO labor loading –Mechanical fabrication and software efforts near 100% but not over for a few months Need to coordinate with ODI –Other tasks under 100% loading for people involved OSU schedule is built up using available staff at 100% when needed

17 Mechanical Design & Fab Example of flow of work for enclosure –Instrument electronics box drawings available early and needed early; fabrication occurs Sept/Oct –Main enclosure drawings need redesign but enclosure not needed until end of March ‘11 (misc parts needed later); design and fab phased accordingly

18 Flow of I&T through Acceptance Note arrival of enclosure end of March, optics end of May

19 Significant Risks Risk IDRisk NameProbabilitySeveritySummary DescriptionMitigations and Reductions 3.1ICD StatusModerate ICDs not complete at design review ICDs almost entirely between sub-systems with existing designs; critical software ICDs most nearly complete 4.1Optics Performance-1 Moderate Melt variance will affect UV performance Measurement of melt indices; re-optimization of design 4.2Optics Performance-2 Moderate Coating performance may reduce throughput Iteration with vendors; production of test or witness samples 4.3Optics Cost/Schedule HighLowCamera design more complex than OSMOS Only 1 asphere; aspheres moderate 4.4ADC vignetting HighLowMayall ADC undersizedWork near zenith or at parallactic angle for full MOS field 5.1Instrument Flexure HighLowInstrument flexure complicates night-time calibration Purchase stiffer focus stages; undo some OSMOS light- weighting to produce stiffer overall structure; examine 7.1Calibration Field HighLowRotator/Guider Calibration field undersized Day-time use of "white spot", night sky lines; flexure reduction 9.1Software complexity Moderate Software interactions among multiple sub- systems from both NOAO & OSU Ensure critical ICDs fully developed; nearly all software exists already 13.1MOS mask production LowHighMOS mask software provided by 3rd parties Not on critical path for commissioning; assessment point in Jan.

20 Lesser Risks Project management Cost and schedule Missing official NOAO project scientist Performance modeling Detector and controller systems Integration and test Documentation and training