CPPC 2012 Spring Workshop Quality and Content in Repair Firm Reports.

Slides:



Advertisements
Similar presentations
Review of Patents Agenda Item 3: Report of the New Technologies Working Group.
Advertisements

United States Coast Guard Household Goods and Carrier Recovery Claims Claims Processing Briefing.
State Office of Risk Management.  Insure over 6,300 properties  Insure about $9,276,126,069 worth of property  FY12/13 we had 55 property loss claims.
CPPC Meeting April “Missing Dish pack containing 3,000 cd’s.” Amount claimed - $7,500 CLAIM 1: Initial Observations CD’s packed in a dish pack?
Managing Risk in Office Buildings: An Insurer’s Look at Security and Emergency Preparedness Issues Brian D. Metcalfe Executive Vice President Bolton &
Contract Pricing Methods Ch 2. Lump Sum –Contractor bids 1 price for entire project –Estimate needs to be detailed –Design needs to be finished before.
WHATCHA GONNA DO? SOURCES OF WATER FLOOD- SURFACE WATER ROOF DAMAGE FROM WIND/HAIL FIRE- SPRINKLER/FIRE DEPARTMENT PLUMBING - WATER LINE/SPRINKLER.
Travel guide analysis The change between travel guides from the past and up- to-date travel guides.
Importer Security Filing “10 + 2”. What is it? Required electronic filing of certain data elements 24 hours prior to the vessel loading in the foreign.
ShockWatch 2. ShockLog Multi-use recorder Complete event analysis and journey profiling G-View Threshold alarms for 3 axes Performance Full Analysis Data.
Managing Content in a Digital Environment Manuel Urrizola UC Riverside Library
ThemeGallery PowerTemplate
ThemeGallery PowerTemplate. Contents Click to add title in here ThemeGallery is a Design Digital Content & Contents mall developed by Guild Design.
Contents ChangLianKe is a Design Digital Content & Contents mall developed by Guild Design Inc. Description of the contents.
CONSTRUCTION ADMINISTRATION Construction Operations Dr. Alaattin Kanoğlu Spring, 2013 Professional Practice Management I.B.U. Architecture Undergraduate.
Montrose Global Assets Inc. Inspections Inspections Appraisals Appraisals Types of Appraisals -USPAP Appraisals -Which Kind of USPAP appraisal do you.
Federal Acquisition Service 1 PRESENTER:  Maria Lopez  Area Property Officer – IL, MN, & WI  (312)  Fax (312) or 0827 
9/19/2012 Controlled copies of SMI documents are maintained within SMI. Printed or electronic copies in other storage locations are uncontrolled This manual.
Managed Medicaid in Virginia. Revenue Cycle Trends and Updates LTC/Post Acute Care  Case Management of Reimbursement Government sponsored program days.
Central Office Appraisal Branch Presents: Preparation of a Project Report Form TC Instructors, Ron Terry & Ron Carrico.
L/O/G/O Themegallery PowerTemplate
FALL CONVENTION 2015 INTERNATIONAL CLAIMS WHERE IN THE WORLD IS YOUR CLAIM??
1 Work Orders. 2 Generating a Work Order There are two methods to generating a Work Order in the WYNNE STSTEM. First method: Option 11 – 12 – 13 * Open.
L/O/G/O ThemeGallery PowerTemplate
Fundamental Digital Electronics
LOGO PowerTemplate. Contents Add Your Text in here [Image Info] - Note to customers : This image has been licensed to be used within this PowerPoint template.
公 简 司 介 Company Introduction. 目录 企业简介 1. About Us 组织结构 2. Organization Structure 售后服务 3. Service 公司业绩 4. Achievement 企业文化 5. Corporate Culture 关于品牌 6.
METAC Workshop March 14-17, 2016 Beirut, Lebanon National Accounts Compilation Issues Session 6: Trade.
Class Template - Please Do NOT Take
Agenda Item 3: Report of the New Technologies Working Group
Add your slogan in here PowerPoint Template
NAME OF INVENTION NAME OF INVENTORS.
Commercial Roofing in Oklahoma City
Marine Cargo claim form
Glynn County, GA Flood Remapping January 2018
Long Distance Proposal
TestNav 8 SPRING 2017 NW SOLS The following slides will walk you through the process of accessing practice items and describes the different tools available.
ThemeGallery PowerTemplate
Catastrophe Adjuster Orientation
ThemeGallery PowerTemplate
ThemeGallery PowerTemplate
Contents Click to add title in here Click to add title in here
Үй жұмысын тексерейік... №1049, №1050.
Interactive Notebook Science ONLY Use ENTIRE SEMESTER Number pages.
ThemeGallery PowerTemplate
ThemeGallery PowerTemplate
Contents Add Your Text in here Add Your Text in here
Click on Job Report- Report Lines
ThemeGallery PowerTemplate
Contents 1 Click to add title in here 2 Click to add title in here 3
PowerPoint Template
“Deep Dive” (your company name)
公 简 司 介 Company Introduction.
LOGO Ppt宝藏提供下载.
ThemeGallery PowerTemplate
Text Structure English 7 & 8.
Date, location 1.
Adding a Quote On the job report screen, click on Job Actions, a drop down menu appears Click on the one that says Quote Click on Create New Quote Add.
Themegallery PowerTemplate
Report Expectations.
Text Structure English 7 & 8.
PowerPoint Template
PowerPoint Template
ThemeGallery PowerTemplate.
Agenda Item 3: Report of the New Technologies Working Group
公 简 司 介 Company Introduction.
PowerPoint Template
National Student Services, Inc.
Partner Portal Training document
Presentation transcript:

CPPC 2012 Spring Workshop Quality and Content in Repair Firm Reports

 Laura Pung, Wheaton World Wide Moving |Bekins Van Lines  Gayle Whitton, Planes Moving and Storage, Inc  Shannon Bitz,Wheaton World Wide Moving|Bekins Van Lines Panel

-What information do the repair firms need prior to going out to the customers residence? What do you need?

-Detailed description of the damage inspected -Provide the repair cost for an item even if it can potentially be denied  Repairable Items

-What is a reasonable cost for digital photos? -Provide a picture of the entire piece and the specific area damaged Digital Photos

Example

-Obtain estimate if needed to support the claim -Advise the adjuster if there is going to be an additional fee 3 rd Party Estimate

-Provide the carrier with a detailed description of the damage -If the damage is deniable please describe why Non Repairable Items

-Make, model, size, serial # and a description of the damage -What is a replacement of like, kind and quality Electronics

Example

-“Fresh Damage” not “Transit Related Damage” -Provide personal information observed as a side note and not on the inspection report. Wording

Thank You!!!!