January 2010 Copyright © 2010 Mississippi Department of Education American Recovery and Reinvestment Act January 2009.

Slides:



Advertisements
Similar presentations
UNIVERSITY OF GEORGIA IMPLEMENTING GUIDANCE FOR THE REPORTS ON USE OF FUNDS PURSUANT TO THE AMERICAN RECOVERY AND REINVESTMENT ACT OF 2009 Contract & Grants.
Advertisements

Audit Requirements  A-133 Gov't, Education and Non-Profit  Thresholds $500K or more expended during the FY - Single Audit required  Audit Report - due.
1 Guidance for the American Recovery and Reinvestment Act of 2009 By David G. Bullock, Partner Macias Gini & O’Connell LLP.
Federal Funding Accountability and Transparency Act Training Overview OMB.
FHWA Implementation of the Transparency Act October 5,
American Recovery and Reinvestment Act of 2009 Recipient Reporting January 2014.
1 American Recovery and Reinvestment Act Impact on the Single Audit August 27 th, 2009.
4/28/20151 Presented by: Anne Taylor, NECTAC David Steele, OSEP OSEP Part C Fiscal Management Verification: What Is It And How Do I Prepare For It?
State Auditor’s Office April 22, 2010 Brad White, CPA Single Audit Coordinator.
OFFICE OF INSPECTOR GENERAL May 17, 2010 Informational Meeting on the President’s Directive on Open Government - Federal Spending Transparency.
Dionysios Karamalikis November 9,  Award Identification—At the time of the award, identifying to the sub-recipient the federal award information.
American Recovery and Reinvestment Act (ARRA). Faculty and Staff Presentations September, 2009 Sue Ross Bruce ElliottDirector Office for Sponsored Research,
State Auditor’s Office March 10, 2010 Brad White, CPA Single Audit Coordinator.
Implementation of the FY 2010 Federal Transit Program and other “Hot Topics” December 8, 2010.
Recovery Act Reporting at Caltech David Mayo Director of Sponsored Research/ ARRA Reporting Coordinator.
ARRA Reporting. American Recovery and Reinvestment Act (ARRA) Passed by Congress in early 2009 to stimulate the economy Main objectives of act Job preservation.
1 University Of Hawai‘i Office of Research Services American Recovery and Reinvestment Act of 2009 (ARRA) Info Session September 3, 2009.
1 SAVING AND CREATING JOBS AND REFORMING EDUCATION U.S. Department of Education Rehabilitation Services Administration September 2009 ARRA VR Reporting.
ARRA FUNDING UPDATE Unprecedented Number of Proposals JIT Requests Extraordinary Reporting Requirements Unique Administrative Characteristics OMB Implementing.
1 SAVING AND CREATING JOBS AND REFORMING EDUCATION U.S. Department of Education Rehabilitation Services Administration September 2009 ARRA IL Part B Reporting.
Grants & Acquisition Data Elements An Exercise in Standardization Presentation at the DATA Act Town Hall September 2014.
April 2009 Copyright © 2009 Mississippi Department of Education American Recovery and Reinvestment Act of 2009 (ARRA) April 2009.
November 2009 Copyright © 2009 Mississippi Department of Education Quarterly Special Education Meeting American Recovery and Reinvestment Act November.
Recovery Act Reporting Government Reviews & Mandatory Reviewer Registration September 21, 2009 Version 1 Note 1: All information provided in this presentation.
ARRA Prime Recipient Reporting Quarter 2 (Reporting Period: April 1-June 30, 2011) July 8, 2011 Bureau Of Indian Education American Reinvestment & Recovery.
Not Your Father’s Single Audit Tammie Brown John Fisher U.S. Department of Health & Human Services.
Section 1512 and Section 1609 Reporting. ARRA Purpose and Opportunities National Purpose: ARRA was enacted on February 17, 2009 and is intended to stimulate.
School Improvement Grants (SIG) SIG Meeting July 26, 2011 Office of School Recovery Mississippi Department of Education.
1 South Dakota Department of Education – Grants Management Rob Huffman – Administrator Mark Gageby – Special Education Fiscal Kim Fischer – Fiscal Monitoring.
1 F EDERAL F UNDING A CCOUNTABILITY AND T RANSPARENCY A CT R EPORTING R EQUIREMENTS U.S. Department of Education Risk Management Service Guidance for Grantees.
1 ARRA EETT Competitive Grant Program Teh-yuan Wan Coordinator New York State Education Department June 2010.
SUBAWARD RISK ASSESSMENTS & FEDERAL FUNDING ACCOUNTABILITY AND TRANSPARENCY ACT (FFATA) GMUN General Meeting September 2010.
American Reinvestment and Recovery Act (ARRA) Office of the Governor Criminal Justice Division.
Capital Area Council of Governments (CAPCOG) Grant Management Training Workshop for Victims of Crime Act (VOCA) and Edward Byrne Memorial Justice Assistance.
1 ARRA Update: FY2010 Education Stabilization & Section 1512 Reporting Requirements MSBO Finance Services Workshop September 18, 2009.
ARRA Reporting Training LSU Health Sciences Center at New Orleans September 29, 2009.
American Recovery and Reinvestment Act (ARRA) Reporting Requirements for Section 4410 Preschool Special Education September 8, 2010.
2008 Aquaculture Grant Program Amy Mitchell. Overview Program Status FSA Reporting Requirements Recovery Act Reporting Requirements Questions and Answers.
December 2009 Copyright © 2009 Mississippi Department of Education American Recovery and Reinvestment Act December 2009.
1 American Recovery and Reinvestment Act (ARRA) Reporting Requirements Presented by: Darryl Grant Procurement Analyst Division of Acquisition Policy &
Presented by Raaj Kurapati and Charlene Hart. Introduction  The Single Audit Act Amendments of 1996 was enacted to streamline and improve the effectiveness.
UT-Arlington Accounting CPE Day August 13, 2014 SEFA Preparation and Subrecipient Monitoring.
FISCAL RESPONSIBILITY IN TITLE III AND OTHER SPONSORED PROGRAMS AND GRANTS ADMINISTRATION Presented by Sharon S. Crews, M.Ac., CPA Vice President for Administrative.
April 2010 Copyright © 2010 Mississippi Department of Education ARRA Update.
STATE FISCAL STABILIZATION FUND 2011 Updates February 1, 2011.
American Recovery and Reinvestment Act New Tools for Transparency and Accountability Office of the Deputy Secretary September 2009.
1 Federal Funding Accountability and Transparency Act of 2006 Highlights and Timeframes for Implementation of the Act Terry Hurst DAS, Office of Grants,
1 Online Reporting for American Recovery and Reinvestment Act Funds Administered by NYSED New York State Education Department Office of School Operations.
DIVISION OF PROGRAM MANAGEMENT. PROGRAM MANAGEMENT UPDATES.
1 American Recovery and Reinvestment Act: A Snapshot Presented by: Tracy McLaughlin Kyle B. McQuaid.
1 Supplemental ESF Application and Changes in ARRA Reporting Office of Educational Management Services New York State Education Department March 10, 2010.
Section 1512 Training for the January 2010 Reporting Cycle FTA Webinars December 18 and 21, 2009.
Office of Innovative Support.  Title I, Basic  Title I, Neglected and Delinquent  Homeless.
Winter Leader Conference February 4, 2009 “ Building Strong “1 American Recovery and Reinvestment Act of 2009 Presentation to: American Association of.
ARRA Reporting System September 17, What is Different About ARRA Funds?  Unprecedented levels of transparency, oversight and accountability.
Recovery Act Update & Recipient Reporting February U.S. Department of the Interior Recovery Act Update and Recipient Reporting February 18, 2010.
Requirements for Public Computer Centers (PCCs) in the Broadband Technology Opportunities Program (BTOP) under the American Recovery and Reinvestment Act.
Arkansas Association of Federal Coordinators September 23, 2011.
1 | Weatherization and Intergovernmental Programeere.energy.gov Overview of EECBG Program Notice 10-07B and SEP Program Notice A Reporting to DOE:
Section 1512 Training for the April 2010 Reporting Cycle Refresher Training for Returning Reporters March 26 and 30, 2010.
Section 1512 Training for the January 2010 Reporting Cycle FTA Webinars December 21, 2009.
1 American Recovery and Reinvestment Act (ARRA) Reporting Requirements.
OMB Circular A-122 and the Federal Cost Principles Copyright © Texas Education Agency
ARRA Information Exchange School of Engineering and Applied Science – September 22, 2009 Longwood Medical Area – August 26, 2009 University Area – August.
Section 1512 is contained in the Recovery Act and requires additional reporting to inform the public on how ARRA funds are expended at the local level.
District Fiscal Services Webinar May Vision To create a world-class educational system that gives students the knowledge and skills to be successful.
American Recovery and Reinvestment Act (ARRA) Reporting Requirements Duquesne University Office of Research.
Sub-recipient Monitoring and Contractor Determination
ARRA Reporting and Applications
August 25, 2009 Brownfields Cooperative Agreements: Highlights of American Recovery and Reinvestment Act (Recovery Act) Requirements This presentation.
Presentation transcript:

January 2010 Copyright © 2010 Mississippi Department of Education American Recovery and Reinvestment Act January 2009

January 2010 Copyright © 2010 Mississippi Department of Education Transparency Federal Funding Accountability and Transparency Act (FFATA) – 1512 (c)(4) –SEC REPORTS ON USE OF FUNDS (c) RECIPIENT REPORTS.—Not later than 10 days after the end of each calendar quarter, each recipient that received recovery funds from a Federal agency shall submit a report to that agency that contains— (4) awarded by the recipient to include the data elements required to comply with the Federal Funding Accountability and Transparency Act of 2006 (Public Law 109–282),

January 2010 Copyright © 2010 Mississippi Department of Education Reporting under 1512 Recipient reports will answer:  Who is receiving Recovery Act dollars and in what amount?  What project or activities are being funded with Recovery Act dollars?  What is the completion status of such projects or activities and what impact have they had on job creation and retention?

January 2010 Copyright © 2010 Mississippi Department of Education ARRA Vendors Vendors should know when responding to a purchase request that ARRA funds will be used to pay for all or part of the purchase Vendors should be given the opportunity to opt out Vendors should understand that their acceptance of ARRA funds constitutes their agreement in the participation of ARRA which could include an audit by the federal government

January 2010 Copyright © 2010 Mississippi Department of Education ARRA Vendors

January 2010 Copyright © 2010 Mississippi Department of Education Federal Reporting Timeframes Days 1 – 10: Prime Recipients required to submit reports for all sub-recipients to FederalReporting.gov Days 11 – 21: Prime Recipients review submitted data, any changes are publically noted Days 21 – 30: Federal review Day 30: Reports published on Recovery.gov

January 2010 Copyright © 2010 Mississippi Department of Education Required Data for Prime Recipient  Federal Funding Agency Name  Award Identification  Recipient DUNS Number  Parent DUNS Number  Recipient CCR Information  CFDA Number  Recipient Account Number  Project/grant period  Award type, date, description, and amount Amount of Federal Recovery Act funds expended to projects/activities Activity Code and Description Job creation narrative and number Infrastructure expenditures and rationale Recipient Primary Place of Performance Recipient Area of Benefit Recipient Officer Names and Compensation (Top 5) Total number and amount of small sub-awards

January 2010 Copyright © 2010 Mississippi Department of Education Required Data for Sub-Recipient Sub-recipient DUNS Number Sub-recipient CCR Information Sub-recipient Type Amount received by Sub-recipient Sub-award Date Sub-award Period Sub-recipient Place of Performance Sub-recipient Area of Benefit Sub-recipient Officer Names and Compensation (Top 5)

January 2010 Copyright © 2010 Mississippi Department of Education Required Data for Sub-Recipient Vendor DUNS Number or Name and 9-digit Zip Code of Headquarters

January 2010 Copyright © 2010 Mississippi Department of Education Documentation Documentation for each ARRA grant award should be kept separately Check vendor’s DUNS Numbers - must match CCR data Keep all documentation for 5 years after end of grant (12/2017) - GEPA

January 2010 Copyright © 2010 Mississippi Department of Education Districts Should… Update Policies and Procedures for purchasing and contracting for ARRA Train staff in the updated ARRA Policies and Procedures Keep accurate and current time sheets

January 2010 Copyright © 2010 Mississippi Department of Education Recovery.gov Recovery.gov publishes the reports after the 30 th day of the end of each quarter

January 2010 Copyright © 2010 Mississippi Department of Education ARRA Reporting Prime Recipients are charged:  to set a process in place to ensure coordinated reporting  to design and implement a process to prevent double counting  to maintain an updated inventory of sub- recipient delegations  to cross check all data records

January 2010 Copyright © 2010 Mississippi Department of Education Data Quality Requirements Prime Recipient:  Owns recipient data and sub-recipient data  Initiates appropriate data collection and reporting procedures to ensure that section 1512 reporting requirements are met in a timely and effective manner  Implements internal control measures as appropriate to ensure accurate and complete information  Performs data quality reviews for material omissions and/or significant reporting errors, making appropriate and timely corrections to prime recipient data and working with the designated sub-recipient to address any data quality issues

January 2010 Copyright © 2010 Mississippi Department of Education Data Quality Requirements Sub-Recipient:  Owns sub-recipient data  Initiates appropriate data collection and reporting procedures to ensure that section 1512 reporting requirements are met in a timely and effective manner  Implements internal control measures as appropriate to ensure accurate and complete information  Reviews sub-recipient information for material omissions and/or significant reporting errors, and makes appropriate and timely corrections

January 2010 Copyright © 2010 Mississippi Department of Education Jobs Created or Retained New guidance issued December 18, 2009 Directed States to report ALL jobs funded with ARRA funds as Jobs Created/Retained Required States to begin reporting using new guidance for the report due January 10, 2010 Will allow States to update data reported to the federal government beginning in February MDE will ask Districts to update last quarters’ data in February to allow MDE to update federal report Guidance will be coming in the next couple of weeks

January 2010 Copyright © 2010 Mississippi Department of Education District Reporting Reporting for Districts begin when a grant award has been made AND the district draws down monies Districts reporting to OSE, for those required to report, will begin a monthly reporting process  Districts will report transactions that match amount drawn for the month from ARRA fund  Step-by-step reporting instructions coming soon

January 2010 Copyright © 2010 Mississippi Department of Education CCR CCR - Central Contractor Registration is the primary registrant database for the U.S. Federal Government. CCR collects, validates, stores, and disseminates data in support of agency acquisition missions, including Federal agency contract and assistance awards. All Prime Recipient organizations must be registered in the CCR database.

January 2010 Copyright © 2010 Mississippi Department of Education DUNS DUNS - Dun & Bradstreet (D&B) provides a Data Universal Numbering System Number, a unique 9- digit identification number, for each physical location of a business or organization. Using the DUNS Number as a unique identifier for your organization helps the Government know the business or organization submitting reporting information to FederalReporting.gov. To register as a Recipient User of FederalReporting.gov, you must know the DUNS Number associated with your award.

January 2010 Copyright © 2010 Mississippi Department of Education CFDA CFDA - Catalog of Federal Domestic Assistance provides a full listing of all Federal programs available to State and local governments (including the District of Columbia); federally-recognized Indian tribal governments; Territories (and possessions) of the United States; domestic public, quasi- public, and private profit and nonprofit organizations and institutions; specialized groups; and individuals.

January 2010 Copyright © 2010 Mississippi Department of Education ARRA Resources

January 2010 Copyright © 2010 Mississippi Department of Education Reporting for ARRA and Special Education

January 2010 Copyright © 2010 Mississippi Department of Education Remember for IDEA ARRA ARRA funds are a one time allocation and must be used for excess costs of providing special education and related services to children with disabilities – one time investments/one time funding All ARRA funds are considered to be part of the grant award for 2009 All ARRA funds must be obligated by September 30, 2011 All ARRA funds must be drawn down by December 30, 2011

January 2010 Copyright © 2010 Mississippi Department of Education Remember for ARRA All ARRA funds must be tracked separately All ARRA documentation should be maintained separately for 5 years at the end of grant period (2017) All IDEA regulations apply MOE must be maintained, supplement not supplant applies

January 2010 Copyright © 2010 Mississippi Department of Education ARRA Funding Codes IDEA, Part B (611) - Fund Number 2569 and Revenue Function Code will be 4478 IDEA, Preschool (619) - Fund Number 2566 and Revenue Function Code 4478

January 2010 Copyright © 2010 Mississippi Department of Education IDEA ARRA Reporting For each month that money is drawn from SPS for ARRA reimbursements:  Complete online information by vendor  Submit copies of Purchase Orders, Contracts, and/or Board Minutes  Submit SSN for any jobs funded by ARRA  Indicate if used for Infrastructure (check spreadsheet on the Special Education ARRA webpage)  Relate each item to a line item in District approved IDEA ARRA Budget page

January 2010 Copyright © 2010 Mississippi Department of Education Infrastructure or Construction “Construction” shall mean the process of building, altering, improving, renovating or demolishing a public structure, public building, or other public real property. It does not include routine operation, routine repair or regularly scheduled maintenance of existing public structures, public building or other public real property.

January 2010 Copyright © 2010 Mississippi Department of Education ARRA Reporting Collect from Vendors to include in monthly reporting:  DUNS Number OR Name and 9-digit Zip Code of Vendor’s Headquarters  Vendor Name  Address, including 9 digit zip code  Amount of Payment  Description of what was obtained for payment  Jobs vendor has created/retained due to PO and/or Contract

January 2010 Copyright © 2010 Mississippi Department of Education Monthly Data Monthly data will be used:  to reconcile with any draw downs from SPS  to reconcile with approved ARRA Budget page  to perform desk audits to ensure quality and accuracy of data  to decide if an onsite visit is needed

January 2010 Copyright © 2010 Mississippi Department of Education Ellen Davis Burnham Bureau Director Donna Hales Division Director